This document appears to be a floor plan and mechanical specifications for HVAC piping associated with a hydraulic test stand project for the 134th Air Refueling Wing. The key details are:

The floor plan shows the layout of the 2-inch process cooling water supply and return piping, including the location of an in-line centrifugal pump with variable speed drive. The mechanical specifications outline the contractor's responsibilities, including furnishing and installing all systems and equipment, determining power requirements, locating openings, and following applicable codes and regulations. The specifications also address motor requirements, coordination with other trades, cutting and patching, equipment protection and cleaning, and providing operating instructions and a one-year guarantee.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3.27.24

PSXE232004

H yd ra u lic T es t

S ta n d

4t h A ir R ef u el in g W in g

P r o j e c t

N o

E n g in e e r in g S e r v ic e s

G r o u p

In c

K n o x v il l e

T e n n e s s e e

(8

-0

E a s t H il l

A v e

S u it e

C o n s u l t in g E n g in e e r s

M1.1

FL

O

O R

P

LA

N

H V

A C

P

IP

IN

G

CAJ

JRW

AutoCAD SHX Text

2" PWR

AutoCAD SHX Text

CONNECT 2" PROCESS COOLING WATER

AutoCAD SHX Text

TO HYDRAULIC TEST STAND

AutoCAD SHX Text

2" PWR

AutoCAD SHX Text

IN-LINE PUMP SCHEDULE

AutoCAD SHX Text

MARK

AutoCAD SHX Text

MANUFACTURER AND

AutoCAD SHX Text

GPM

AutoCAD SHX Text

HEAD

AutoCAD SHX Text

(FEET)

AutoCAD SHX Text

EFF.

AutoCAD SHX Text

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text

RPM

AutoCAD SHX Text

HP

AutoCAD SHX Text

MODEL NUMBER

AutoCAD SHX Text

VOLTS/

AutoCAD SHX Text

PHASE

AutoCAD SHX Text P-1

AutoCAD SHX Text B&G SERIES E-80-1.5c1.5x7C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 55.9

AutoCAD SHX Text

IN-LINE

AutoCAD SHX Text

CENTRIFUGAL

AutoCAD SHX Text

AutoCAD SHX Text 1.0

AutoCAD SHX Text 480/3

AutoCAD SHX Text

%%UOVERHEAD PIPE SUPPORT

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

%%UHANGER DETAIL

AutoCAD SHX Text

STRUCTURE

AutoCAD SHX Text

SPRING AND NEOPRENE

AutoCAD SHX Text

VIBRATION ISOLATORS

AutoCAD SHX Text

ROOMS ONLY

AutoCAD SHX Text

USED IN MECHANICAL

AutoCAD SHX Text

18" LONG.

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text

GALVANIZED SHEET METAL

AutoCAD SHX Text

DIAMETER OF INSULATED

AutoCAD SHX Text

PIPE. FOR PIPES 4" AND

AutoCAD SHX Text

SHIELD ROLLED TO OUTSIDE

AutoCAD SHX Text

SMALLER, FABRICATE FROM

AutoCAD SHX Text 18 GAUGE x 12" LONG, AND

AutoCAD SHX Text

FOR PIPES 5" AND LARGER,

AutoCAD SHX Text FABRICATE FROM 16 GAUGE x

AutoCAD SHX Text

CLEVIS TYPE HANGER

AutoCAD SHX Text

AFFIX TO BUILDING

AutoCAD SHX Text

DIRECTION OF FLOW

AutoCAD SHX Text

BALL VALVE (2" AND LESS)

AutoCAD SHX Text

BUTTERFLY VALVE (2-1/2" AND UP)

AutoCAD SHX Text

STRAINER

AutoCAD SHX Text

THERMOMETER

AutoCAD SHX Text

TRIPLE DUTY VALVE

AutoCAD SHX Text

COMBINATION BALANCING AND SHUT OFF VALVE

AutoCAD SHX Text

PIPING LEGEND

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

UNION

AutoCAD SHX Text

FLANGED CONNECTION

AutoCAD SHX Text

TEMPERATURE AND PRESSURE WELL

AutoCAD SHX Text

TEMPERATURE AND PRESSURE RELIEF VALVE

AutoCAD SHX Text

PRESSURE GAUGE

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

PROCESS WATER RETURN (SECONDARY LOOP)

AutoCAD SHX Text

PROCESS WATER SUPPLY (SECONDARY LOOP)

AutoCAD SHX Text

PWR

AutoCAD SHX Text

PWS

AutoCAD SHX Text

%%USUSPENDED INLINE PUMP MOUNTING DETAIL

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

GAUGE DAMPENER

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

PRESSURE GAUGE-0%%D TO 100%%D PSI

AutoCAD SHX Text

P&T FITTING

AutoCAD SHX Text

TRIPLE DUTY VALVE

AutoCAD SHX Text

P&T FITTING

AutoCAD SHX Text

IN-LINE PUMP (SEE SCHEDULE)

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text

2" PWS

AutoCAD SHX Text

2" PWS

AutoCAD SHX Text

CONNECT 2" PROCESS WATER

AutoCAD SHX Text

TO EXISTING CHILLED WATER RETURN

AutoCAD SHX Text

VARIABLE SPEED DRIVE

AutoCAD SHX Text

1. CONTROL PUMP WITH VARIABLE SPEED DRIVE

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

NOTE #1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REVISIONS:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJ. NO:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text L

AutoCAD SHX Text K

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text 240 West Bessemer St. Alcoa, TN. 37701

AutoCAD SHX Text

ph. 865 980 3500 fax. 865 980 3555

AutoCAD SHX Text \\ESGSTOR\PROJECTS\2024\24644 TANG 134TH HYDRAULIC TEST STAND BUILDING 190\HVAC\24644 - M1.1.DWGPLOTTED ON:April 1, 2024 12:35 PM BY:COLBY JONESApril 1, 2024 12:35 PM BY:COLBY JONES12:35 PM BY:COLBY JONESBY:COLBY JONESCOLBY JONES

AutoCAD SHX Text Knoxville, Tennessee

AutoCAD SHX Text Knoxville, Tennessee

AutoCAD SHX Text N

AutoCAD SHX Text

%%UFLOOR PLAN - HVAC PIPING

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text NOTES: 1. NEW PROCESS WATER PIPING TO BE TYPE L COPPER. NEW PROCESS WATER PIPING TO BE TYPE L COPPER. INSULATE ALL NEW PIPING WITH 1-1/2" THICK FIBERGLASS INSULATION. 2. PROVIDE FIBERGLASS BOX TO INSULATE PUMP CASING.PROVIDE FIBERGLASS BOX TO INSULATE PUMP CASING.

AutoCAD SHX Text

%%UMECHANICAL SPECIFICATIONS

AutoCAD SHX Text PART 1 - GENERAL 1.01 WORK INCLUDED WORK INCLUDED A. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FURNISH AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FURNISH AND INSTALL ALL SYSTEMS, EQUIPMENT, AND RELATED ITEMS DESCRIBED. B. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE CHARACTERISTICS OF ELECTRICAL CURRENT AVAILABLE TO OPERATE THE MECHANICAL EQUIPMENT PRIOR TO ORDERING SUCH EQUIPMENT. ALL ELECTRICALLY OPERATED EQUIPMENT SHALL BE DESIGNED FOR OPERATION WITH THE TYPE OF ELECTRIC CURRENT AVAILABLE TO THE PROJECT. ALL POWER WIRING SHALL BE SPECIFIED ON DRAWING E1.1. C. IT SHALL FURTHER BE THE CONTRACTOR'S RESPONSIBILITY TO IT SHALL FURTHER BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE, LAYOUT AND MAKE PROVISIONS FOR ALL OPENINGS REQUIRED TO ACCOMMODATE HIS WORK. D. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S DRAWINGS AND RECOMMENDATIONS. E. VERIFY ALL CONNECTIONS AND ROUGH-IN LOCATIONS WITH THE COR VERIFY ALL CONNECTIONS AND ROUGH-IN LOCATIONS WITH THE COR AND/OR THE EQUIPMENT SUPPLIER OR CONTRACTOR PRIOR TO THE START OF THEIR WORK. 1.02 CODES AND FEES CODES AND FEES A. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF THE LOCAL CODES, INTERNATIONAL MECHANICAL CODE, NFPA, UL, ASTM, ASHRAE, SMACNA, ASME AND ANSI. B. CONTRACTOR SHALL PAY FOR FEES AND INSPECTIONS AS MAY BE CONTRACTOR SHALL PAY FOR FEES AND INSPECTIONS AS MAY BE REQUIRED FOR SYSTEMS REQUIRING INSPECTIONS BY AGENCIES HAVING JURISDICTION. C. ALL ELECTRICAL EQUIPMENT TO BE U.L. LISTED. ALL ELECTRICAL EQUIPMENT TO BE U.L. LISTED. PART 2 - PRODUCTS 2.01 MOTORS ALL MOTORS TO BE FURNISHED WITH STARTERS. PART 3 - EXECUTION 3.01 COORDINATION THE MECHANICAL WORK SHALL BE INSTALLED AS NEATLY AS POSSIBLE IN THE LOCATIONS SHOWN BUT SHALL BE SUBJECT TO SUCH DEVIATIONS, MODIFICATIONS AND RELOCATIONS AS MAY BE NECESSARY TO CONFORM TO THE REQUIREMENTS OF THE ARCHITECTURAL DRAWINGS AND AS NECESSARY TO AVOID INTERFERENCES WITH THE STRUCTURAL NECESSARY TO AVOID INTERFERENCES WITH THE STRUCTURAL WORK AND THE WORK OF OTHER TRADES, AND INTERFERENCES BETWEEN THE VARIOUS TRADES. THIS SHALL BE DONE AT NO COST TO THE OWNER. NO PIPING OR EQUIPMENT SHALL BE INSTALLED WHICH WOULD REQUIRED CEILINGS TO BE LOWER THAN REQUIRED BY DRAWINGS, UNLESS APPROVAL IS OBTAINED FROM THE COR. 3.02 CUTTING AND REPAIRING CUTTING AND REPAIRING ANY CUTTING AND PATCHING, OR BOTH, SHALL BE DONE BY THE SUBCONTRACTOR WHOSE WORK REQUIRED SUCH ACCOMMODATION, OR AT HIS EXPENSE. 3.03 PROTECTION AND CLEANING PROTECTION AND CLEANING UPON COMPLETION OF THE WORK AND AFTER ALL TESTS HAVE BEEN MADE AND PIPING SYSTEMS PROVEN TIGHT, CLEAN ALL EQUIPMENT, CIRCULATING SYSTEMS, ETC., AND LEAVE IN CORRECT OPERATING CONDITION. 3.04 OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS FURNISH AND DELIVER TO THE GOVERNMENT THREE SETS OF OPERATING INSTRUCTIONS FOR ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT, INCLUDING SHOP DRAWINGS, PIPING DIAGRAMS, WIRING DIAGRAMS, MAINTENANCE RECOMMENDATIONS AND INFORMATION CONCERNING REPLACEMENT PARTS. 3.05 GUARANTEE GUARANTEE THE CONTRACTOR SHALL GUARANTEE ALL WORK TO BE IN ACCORDANCE WITH CONTRACT REQUIREMENTS AND FREE FROM DEFECTIVE OR INFERIOR MATERIALS, EQUIPMENT, AND WORKMANSHIP FOR A PERIOD OF ONE YEAR, AND HE SHALL GUARANTEE THAT ALL EQUIPMENT IS OF PROPER SIZE AND DESIGN AND SO INSTALLED AS TO PRODUCE THE CAPACITIES AND RESULTS SPECIFIED AND SHOWN ON THE DRAWINGS. ALL COMPRESSORS SHALL HAVE A 5 YEAR GUARANTEE.

Sheets and Views
Model

File details come from the government source that posted it. Updated .