02. PWS - 1Gbps Symmetrical Internet.pdf
PDF 519 KB Posted
- Attached to
- Solicitation - 1G Symmetrical Internet
- Solicitation number
- FA466126Q0112
About this file
This Performance Work Statement (PWS) defines requirements for a contractor to engineer, furnish, install, and test (EFI&T) a dedicated 1 Gigabit per second (Gbps) symmetrical internet connection to Building 7320 at Dyess Air Force Base, Texas. The service must deliver guaranteed 1 Gbps upload and download throughput and be fully operational by October 8, 2026. The contractor shall provide all personnel, management, supervision, tools, equipment, materials, supplies, and transportation necessary to complete the installation. The contractor must furnish and install all networking equipment required to deliver the specified speeds, configure a minimum of one public IPv4 address, and allow the customer to connect a Government-provided fiber line directly to the handoff interface for downstream distribution to other facilities. All installed components must comply with Defense Information Systems Agency (DISA), Air Force, and commercial telecommunications standards (TIA/EIA). The service must be maintained and guaranteed for a minimum of one month from the formal acceptance date. The contractor shall conduct comprehensive RFC 2544 network performance testing to demonstrate symmetrical throughput of at least 1 Gbps, packet loss of less than 0.1%, and latency and jitter within standard Service Level Agreement guidelines. Test results must be documented and delivered to the Government Point of Contact for formal review and acceptance.
The Government will provide access to communications rooms, facilities, and pathways at Building 7320, furnish an operational fiber line for the contractor's equipment, supply escort services within secure areas, and provide available electrical power and rack space in designated telecommunications rooms. The contractor is responsible for obtaining all necessary base passes and security clearances for personnel and vehicles, maintaining an accurate personnel roster, and ensuring all assigned staff possess current professional credentials and technical certifications at the contractor's expense. The contractor must comply with all installation security procedures, traffic regulations, federal holidays observance (Monday-Friday, 0800-1600 local time), environmental statutes, OSHA safety requirements, and occupational health standards. The contractor shall submit a comprehensive Safety and Health Plan prior to contract award for acceptance by the Installation Safety Office, furnish all required personal protective equipment, and immediately report all incidents involving personnel injury or property damage. The contractor is strictly prohibited from possessing weapons or firearms on the installation, employing current Government employees or DoD civilians in violation of Air Force Instruction 64-106, and duplicating Government-issued keys. All contractor personnel must undergo identity vetting and background checks per Air Force Manual 31-113 and comply with REAL ID Act requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ - 1G Symmetrical Internet.pdf | ||
| 01. FAR Provisions and Clauses - FA466126Q0112.pdf | ||
| 03. Wage Determination - 2015-5211.35.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Of Work Statement (PWS)
For
1Gb Symmetrical Internet to BLDG 7320 at
Dyess AFB, TX
22 Sep 2026
Prepared by:
7 CS/SCXP
Table of Contents
1. Description of Services
2. Government Furnished Property, Equipment, and Services
3. Contractor Requirements
4. GENERAL CONTRACTOR OPERATIONS & ADMINISTRATION
5.0 INSTALLATION SECURITY & CONDUCT
6.0 OPERATIONAL PARAMETERS & SITE PROCEDURES
7.0 INSTALLATION ACCESS, IDENTITY VETTING & CREDENTIALING
8.0 SAFETY & OCCUPATIONAL HEALTH
Performance Work Statement (PWS) | Dyess AFB
1. Description of Services
1.1 Scope
This Performance Work Statement (PWS) defines the requirements for the Contractor to
Engineer, Furnish, Install, and Test (EFI&T) an enterprise-grade 1 Gigabit per second (1 Gbps) symmetrical internet connection (guaranteed 1 Gbps upload and 1 Gbps download throughput) to
Building 7320 at Dyess AFB, Texas. The Contractor shall provide this service for a minimum of one (1) month.
The Contractor shall provide all personnel, management, supervision, tools, equipment, materials, supplies, transportation, and incidental engineering necessary to fulfill the requirements specified herein. The Contractor must ensure that a minimum of a single public IP address is available and configured at Building 7320.
The Contractor shall provide and install all networking equipment necessary to deliver the required speeds and allow the customer to hook up a Government-provided fiber line to support other buildings with the necessary 1 Gbps speeds. The Contractor must permit and facilitate the customer plugging in this fiber line directly into the handoff interface. All installed electronic components, hardware, cabling, and ancillary supplies provided by the Contractor may be commercially standard new, reconditioned, or previously used equipment (acceptable if using existing provider equipment), provided it is fully operational, reliable, and capable of supporting all performance specifications herein. The entire service installation must be completed and fully operational by October 8, 2026.
1.2 Objective
The primary objective of this acquisition is to secure a highly reliable, dedicated, low-latency, and high-speed internet service to support mission-critical operations at Dyess AFB. The connection must deliver a consistent 1 Gbps throughput in both directions (symmetrical) with high uptime availability and provide a minimum consistent speed of 1 Gbps at Building 7320.
2. Government Furnished Property, Equipment, and Services
2.1 Government Support
The Government will provide the following to facilitate the installation:
• Access to necessary communications rooms, facilities, and pathways at Building 7320.
• Government-provided fiber line to connect to the Contractor's equipment for downstream distribution.
• Escort services within secure areas, as required.
• Available electrical power and rack space in designated telecommunications rooms.
3. Contractor Requirements
3.1 Installation and Circuit Requirements
• Service Delivery: The provider shall deliver a dedicated 1 Gbps symmetrical connection directly to Building 7320 (demarcation point), maintaining a minimum consistent speed of 1 Gbps.
• Infrastructure & Interface: The Contractor shall engineer, supply, and install all necessary transmission hardware and handoff interfaces capable of sustaining 1 Gbps symmetrical throughput. The equipment must allow the customer to plug in a
Government-provided fiber optic line to distribute the connection to other facilities.
• IP Address Allocation: The Contractor shall provide and configure a minimum of a single (1) public IPv4 address for use at Building 7320.
• Standards Compliance: All installation work, cabling, and termination must adhere strictly to Defense Information Systems Agency (DISA), Air Force, and commercial telecommunications standards (TIA/EIA).
• Hardware Exclusions: The Contractor is not responsible for providing customer end-user routers, switches, or firewalls beyond the demarcation interface.
3.2 Testing and Acceptance
Upon completion of the physical installation, the Contractor shall conduct a comprehensive RFC
2544 (or equivalent) network performance test at Building 7320. The test must demonstrate:
• Symmetrical throughput of at least 1 Gbps.
• Packet loss of less than 0.1%.
• Latency and jitter within standard SLA guidelines.
The test results shall be documented and delivered to the Government Point of Contact (GPOC) for formal review and acceptance.
3.3 Period of Performance
The active internet service must be maintained and guaranteed for a minimum of one (1) month from the formal date of acceptance.
3.4 Key Milestones and Timeline
• Effective Date: Upon contract award.
• Physical Run and Setup: To be coordinated with 7 CS.
• Testing & Activation: Must be finalized and validated.
• Completion & Delivery Date: The entire installation must be fully operational and accepted no later than 8 October 2026.
4. GENERAL CONTRACTOR OPERATIONS & ADMINISTRATION
4.1 Base Access and Coordination
The Contractor shall coordinate all on-site activities with the 7 CS representative and the GPOC. The
Contractor is responsible for obtaining all necessary base passes and security clearances for personnel and vehicles in accordance with Dyess AFB installation security procedures.
4.2 Contractor Personnel Management
The Contractor shall maintain an accurate, up-to-date roster of all personnel assigned to perform work under this contract.
• The roster shall be submitted to the CO and COR prior to performance commencement.
• Revisions shall be submitted immediately upon any staffing modification, resignation, reassignment, or onboarding.
• The Government reserves the right to utilize this roster for 100% personnel accountability during exercises, real-world operational security events, and force protection condition (FPCON) escalations.
4.2.1 Professional Certifications and Licenses
Prior to contract award and throughout the period of performance, all Contractor personnel shall possess current, valid professional credentials, technical certifications, and state/federal trade licenses mandated to execute the work specified in this PWS. The acquisition and maintenance of all necessary certifications and licenses shall be accomplished strictly at the Contractor's expense.
4.2.2 Personnel Qualifications
The Contractor shall assign only personnel who possess the prerequisite technical training, industry qualifications, and specialized competencies necessary to execute the requirements of this contract safely and effectively.
4.2.3 Language Proficiency
Contractor personnel interfacing directly with Government stakeholders, customer organizations, or installation personnel shall demonstrate fluent, clear, and concise verbal and written communication skills in the English language to ensure efficient contract execution.
4.2.4 Employment of Current Government Personnel
The Contractor shall not employ any individual who is currently an employee of the United States
Government if such employment creates a conflict of interest or an appearance thereof. Furthermore, the Contractor shall not employ any Department of Defense (DoD) civilian employee in violation of Air
Force Instruction (AFI) 64-106, Industrial Labor Relations Activities.
4.2.5 Employment of Off-Duty Military Personnel
The Contractor is advised that off-duty active-duty military personnel, Reservists, and National Guard members retained by the Contractor remain subject to military recall, deployment, duty hour alterations, and Permanent Change of Station (PCS) orders. The unexpected absence, reassignment, or recall of military personnel shall under no circumstance constitute an excusable delay or legal justification for non-performance.
4.2.6 Identification of Contractor Personnel
Contractor personnel shall clearly identify themselves as non-government Contractor employees at all times, including when participating in official meetings, answering Government telephones, and interacting in forums where Contractor status is not readily obvious.
• Contractor personnel shall ensure all produced correspondence, engineering reports, drawings, and status documents are explicitly marked as Contractor products.
• While operating within designated high-security areas (such as the Command Post), Contractor personnel shall visibly display escort badges and maintain mandatory security protocols.
4.3 Clean-up and Restoration
The Contractor shall maintain a clean work area and dispose of all installation debris daily. Any damage to Government facilities, landscaping, or existing utilities caused during installation shall be repaired or replaced to original condition at the Contractor’s expense.
5.0 INSTALLATION SECURITY & CONDUCT
5.1 Motor Vehicle Operations and Base Traffic Compliance
The Contractor and its employees shall comply with all installation traffic regulations, posted directives, and Dyess AFB Base Operating Instructions.
5.1.1 Privately Owned Vehicles (POV) and Contractor Vehicles
Each vehicle operated on Dyess AFB must maintain current registration, current state safety inspection credentials, and minimum motor vehicle liability insurance as mandated by Texas state law.
• Vehicle operators shall observe all posted speed limits.
• The operation of hand-held mobile devices (cellular phones, smartphones) for verbal calls, text messaging, or data browsing while driving on the installation is strictly prohibited.
• Seatbelt utilization is mandatory for all vehicle occupants.
• Any individual cited for Driving Under the Influence (DUI) or Driving While Intoxicated (DWI) shall face immediate, indefinite revocation of installation driving privileges.
5.2 Prohibition of Weapons, Firearms, and Ammunition
Contractor personnel are strictly prohibited from possessing or transporting firearms, weapons, concealed carry instruments, explosives, or ammunition on their person or inside any company-owned, leased, or privately owned vehicle while on Dyess AFB.
5.3 Security Incident and Threat Reporting
Contractor personnel shall immediately report any suspicious behavior, potential threat indicators, security violations, or incidents compromising DoD personnel, facilities, resources, or classified/unclassified defense information to the Dyess AFB Security Forces Squadron (SFS) and the
COR.
5.4 Safeguarding Government Resources and Physical Security
The Contractor shall be solely responsible for safeguarding all Government property, materials, spaces, and facilities entrusted to them or accessed during contract performance.
5.5 Key and Access Control
The Contractor shall establish and maintain strict physical security control protocols to prevent the loss, misplacement, or unauthorized use of any Government-furnished keys or electronic access badges. The
Contractor is strictly prohibited from duplicating Government-issued keys.
• Reporting: The Contractor shall notify the CO and COR immediately upon discovering the loss, compromise, or duplication of any Government key.
• Cost Remediation: If a key (excluding master keys) is lost, compromised, or duplicated, the
Contractor shall re-key or replace the impacted lock cylinders at no cost to the Government, upon written instruction from the CO.
• Master Key Compromise: In the event a master key is compromised or lost, the Government shall direct complete re-keying and lock replacement of the affected facility or system. The total cost incurred by the Government shall be deducted directly from monthly payments due to the
Contractor.
• Access Limitations: Government keys and access devices shall be entrusted solely to authorized
Contractor personnel actively executing contract requirements. Contractor employees shall not unlock spaces or permit entry to unauthorized individuals.
6.0 OPERATIONAL PARAMETERS & SITE PROCEDURES
6.1 Normal Duty Hours
Standard operational hours under this contract are Monday through Friday, 0800 to 1600 local time, excluding federal holidays and Government-directed installation closures (e.g., inclement weather or real-world emergency responses).
• Any work performed outside standard duty hours requires prior written coordination with and approval from the 7 CS/SCXP COR and the Contracting Officer.
• Work shall be scheduled and executed to minimize disruption to mission-critical base activities.
• If after-hours performance is deemed necessary to satisfy delivery timelines, proposed schedules must be submitted to the Government for review and formal approval.
6.2 Recognized Federal Holidays
The Contractor is not required to perform work on recognized federal holidays, unless formally authorized or directed by the CO.
Federal Holiday Calendar Observance
New Year's Day 1st of January
Martin Luther King Jr.'s Birthday 3rd Monday in January
Washington's Birthday (Presidents' Day) 3rd Monday in February
Memorial Day Last Monday in May
Juneteenth National Independence Day 19th of June
Independence Day 4th of July
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veterans Day 11th of November
Thanksgiving Day 4th Thursday in November
Christmas Day 25th of December
Note: In accordance with standard federal practice, if a holiday falls on a Saturday, it will be observed on the preceding Friday. If a holiday falls on a Sunday, it will be observed on the following Monday.
Work suspended due to weather closures, force protection alerts, or official installation exercises shall be rescheduled and resumed as soon as feasible following base reopening.
6.3 Environmental Compliance and Protection
The Contractor shall comply with all applicable federal, state, and local environmental statutes, executive orders, Department of the Air Force instructions, and local Dyess AFB environmental plans. In cases of overlapping or conflicting standards, the most stringent requirement shall apply. The prime
Contractor remains accountable for subcontractor compliance with all environmental stipulations.
6.4 Environmental Permits & Civil Engineering Approvals
The Contractor is solely responsible for identifying, funding, and securing any required environmental permits independent of existing Government operating permits. The Government shall not be designated as a co-permittee or secondary discharger. If named as such, the Government reserves the right to suspend or terminate operations without penalty or financial liability.
6.4.1 Base Civil Engineering (CE) Work Clearance (Digging Permits)
• AF Form 103 (Base Civil Engineer Work Clearance Request): The Contractor shall coordinate with the 7th Civil Engineer Squadron (7 CES) to process and obtain an approved AF Form 103 before initiating any surface penetration or trenching. Submittals must occur at least 14 calendar days post-award.
• Permits and Environmental Reviews: The Contractor shall complete and submit all required AF
Form 332 (Base Civil Engineer Work Request) and AF Form 813 (Request for Environmental Impact
Analysis) packages to 7 CS/SCXP approximately six (6) weeks prior to scheduled work commencement.
6.5 Government Inspection Rights
The Government reserves the right to inspect work areas, equipment staging areas, and ongoing installation activities upon reasonable notice to assess compliance with environmental, safety, quality, and occupational health mandates. The Government typically provides a 24-hour notification window, but reserves the right to conduct unannounced inspections when deemed necessary for safety, environmental, operational, or security reasons.
6.6 Post-Award Conference
The Contractor shall attend a Post-Award Orientation Conference convened by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) Part 42.5. Participation shall be at no additional cost to the Government.
7.0 INSTALLATION ACCESS, IDENTITY VETTING &
CREDENTIALING
7.1 Security Clearance and Background Checks
All Contractor personnel requiring base access shall undergo identity vetting and background checks in accordance with Air Force Manual (AFMAN) 31-113, Installation Perimeter Access Control, and local installation security memorandums. The Installation Commander retains sovereign authority to deny entry credentials based on derogatory background records or risks to base security, discipline, and order.
7.2 Base Access Identification (AFMC Form 496)
To secure long-term base credentials in accordance with Air Force Federal Acquisition Regulation
Supplement (AFFARS) Clause 5352.242-9000, Contractor Access to Air Force Installations, the Contractor shall submit a formal access request on corporate letterhead to the CO containing:
1. Assigned Contract Number;
2. Specific Location(s) of Work;
3. Period of Performance / Requested Expiration Date (not to exceed contract end date or a maximum duration of 3 years); and
4. Comprehensive list of personnel (including subcontractors) specifying full legal name and associated corporate entity.
7.2.1 Credential Processing Workflow
• The Contractor shall provide a copy of the approved letter to each employee for presentation at the
Dyess AFB Visitor Center.
• Approved requests will be endorsed by 7 CONS / CO and subsequently processed by the Dyess AFB
Pass and Registration Office for biometric verification and badge generation.
• Access passes are restricted to personnel performing recurring, consistent work on-site.
7.2.2 REAL ID Act Compliance
Contractor personnel presenting state driver's licenses from non-compliant jurisdictions must furnish secondary identification compliant with the REAL ID Act of 2005. Up-to-date compliance listings can be referenced via the Department of Homeland Security (DHS) website (www.dhs.gov).
7.2.3 Credential Accountability and Surrender
The prime Contractor shall retrieve and return all base passes, vehicle decals, and credentials to the Pass and Registration Office immediately when:
5. An employee resigns, is terminated, or no longer performs work under this contract;
6. Directed by the Contracting Officer; or
7. The contract reaches completion or termination.
Failure to return passes may result in the withholding of final contract payments.
8.0 SAFETY & OCCUPATIONAL HEALTH
8.1 Safety Compliance
The Contractor shall ensure strict compliance with Public Law 91-596, the Occupational Safety and
Health Act (OSHA), applicable Code of Federal Regulations (CFR), and relevant Air Force Instructions.
Ensuring personnel safety and protecting building occupants, base personnel, and visitors near the work site remains exclusively the Contractor's legal responsibility.
8.2 Safety and Health Plan
The Contractor shall draft and submit a comprehensive Safety and Health Plan to the Contracting Officer for review and formal acceptance by the Installation Safety Office prior to contract award, in accordance with AFI 91-202 (AFMC Supplement). The plan shall detail:
• Hazard tracking, mitigation, and prompt correction protocols;
http://www.dhs.gov/
• Equipment operator training verification;
• Site-specific mishap reporting procedures for injuries or property damage.
8.3 Personal Protective Equipment (PPE)
The Contractor shall furnish, at its own expense, all required PPE (including, but not limited to, steel-toe footwear, safety eyewear, respirators, protective headwear, and high-visibility gloves) for its employees in compliance with OSHA standards.
8.4 Personnel Screening & Security Restrictions
The Government reserves the right to restrict access to any Contractor employee deemed a risk to health, safety, general welfare, or mission readiness. The Contractor shall conduct pre-employment criminal history evaluations at its own expense to guarantee that no assigned employee has a record of convictions for sexual offenses or crimes against children.
8.5 Professional Appearance and Uniforms
Contractor personnel shall maintain a neat, clean, and professional appearance. Personnel shall wear distinctive corporate attire clearly displaying the company name and/or visibly exhibit laminated photo badges displaying the employee name and company name.
8.6 Mishap and Accident Reporting
The Contractor shall record and immediately report all incidents involving personnel injury or property damage to the Base Safety Office and 7 CS/SCXP. The Contractor shall secure and preserve accident scenes and damaged materials until released by designated investigative authorities. The Contractor shall cooperate fully with any Government-led safety investigations.
8.7 Permit-Required Confined Space Operations
Contractor and subcontractor personnel entering confined spaces on Dyess AFB shall comply with OSHA standard 29 CFR 1910.146.
• The Contractor must implement a certified Confined Space Entry Program.
• All confined space activities shall be coordinated in advance with the Wing Safety Office and 7
CS/SCXP.
• The prime Contractor maintains full legal and operational responsibility for subcontractor compliance during confined space entries.