About this file

This Statement of Work (SOW) details a vault door replacement project for the Federal Emergency Management Agency (FEMA) at their MERS facility in Maynard, Massachusetts. The contractor will remove the existing vault door and install a new Overly Model No. C5V-IIL-K/Class 5 High Security Vault door and frame, ensuring compliance with engineering standards throughout the process. The scope of work includes site preparation, existing door removal, new door installation, and final cleanup and inspection, with all specifications subject to approval by the Contracting Officer's Representative (COR).

The project has a maximum performance period of 180 calendar days from contract award, with the work to be conducted at FEMA's MERS, VSAB, Building B. Security requirements mandate that the contractor submit names of prime and sub-contractors for FEMA security clearance prior to beginning work. FEMA personnel will conduct both scheduled and unscheduled inspections to oversee the construction progress, with final acceptance inspections to be performed by the COR and MERS Detachment management personnel.

View the file

Other files for this federal contract opportunity

Other files attached to Vault Door Replacement, newest first.
File Type Posted
02.04.01 - Attachment 3.pdf PDF
02.04.01 - Attachment 2.pdf PDF
02.04.01 - Attachment 4.pdf PDF
02.09.02 - Q&A - Admendment 0001.pdf PDF
02.04.01 - Attachment 1.pdf PDF
02.04.01 - Attachment 5.pdf PDF
02.02.01 - RFQ Combined Synopsis Solicitation - Vault Door Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Department of Homeland Security (DHS)

Federal Emergency Management Agency (FEMA)

1.0 PROJECT TITLE: Vault Door Replacement

2.0 SPECIFIC TASKS

• Contractor will remove existing vault door and frame and install one new Overly Model No. C5V-IIL-K/Class 5 High Security Vault door and frame

• Contractor will ensure all work to be conducted and to be performed in accordance with engineering standards.

2.1 Scope of Work

1. Site Preparation

• Contractor will perform site assessment and verify dimensions of existing vault door

• Contractor will coordinate with facility management to schedule downtime and access

• Contractor will protect surrounding area with appropriate coverings and signage to prevent damage and ensure safety

2. Removal of Existing Vault Door

• Contractor will safely remove the current vault door, frame, and associated hardware

• Contractor will dispose of old door and materials in accordance with local regulations and security protocols

3. Installation of New Vault Door

• Contractor will install new vault door as specified by manufacturer and project requirements

• Install new frame, hardware, lock mechanisms and access control

• Ensure door is properly aligned, operates smoothly, and is secure

4. Cleanup and final inspection

• Contractor will clean work and remove debris and materials

• Contractor will conduct final inspection with facility representative for sign-off

3.0 DELIVERABLES/INSPECTION SCHEDULE

3.1 Mechanical Work Inspection and Approval:

• All specifications, configuration, and plans for the replacement of vault door will be approved by the COR prior to start of the project.

• All mechanical work including modifications will be approved by the COR.

• After this section has been completed, the COR will inspect the work.

3.2 COR acceptance and final Inspection of all work to be performed:

• The COR and other management personnel from the MERS Detachment will conduct acceptance inspections of all construction work and materials.

FEMA personnel will be authorized to perform scheduled and un-scheduled inspection of the construction work to oversee the progress.

4.0 PLACE OF PERFORMANCE

• The contractor will perform the work at the FEMA, MERS, VSAB, Bldg.

B, located at 65 Old Marlboro Road, Maynard, MA 01754

5.0 SECURITY

• Contractor will submit the names of their prime and sub-contractors to the COR before the start of the project so that they can be cleared by FEMA Security to work on the premises.

6.0 PERIOD OF PERFORMANCE

• The period of performance for this award shall not exceed 180 calendar days from contract award date.

2.0 SPECIFIC TASKS
2.1 Scope of Work
3.0 DELIVERABLES/INSPECTION SCHEDULE
3.1 Mechanical Work Inspection and Approval:
3.2 COR acceptance and final Inspection of all work to be performed:
FEMA personnel will be authorized to perform scheduled and un-scheduled inspection of the construction work to oversee the progress.
4.0 PLACE OF PERFORMANCE
6.0 PERIOD OF PERFORMANCE