02 Attachment I Specification 14Aug25.pdf

PDF 212 KB Posted

Attached to
Repair Railroad Facilities, USAG Bavaria, Grafenwoehr Military Community
Solicitation number
W912PB26BA001
Issued by

About this file

This document is a Specification for Repairing Railroad Facilities at the United States Army Garrison Bavaria in Grafenwoehr and Vilseck, Germany. The specification details comprehensive railroad maintenance and repair services for tracks, bridges, culverts, switches, signaling facilities, and railroad crossings located both inside and outside military barracks areas.

The specification covers multiple detailed work items, including aluminothermic and build-up welding, repairing switch components, replacing railroad ties and track ballast, adjusting track gauges, and disposing of contaminated materials. Contractors must comply with Deutsche Bahn AG regulations, German safety standards, and environmental disposal guidelines. The work involves precise technical requirements such as using specific materials like hard white ware K I ballast, maintaining exact track measurements, and following strict safety and environmental protocols. The contract requires detailed documentation, daily reporting, and coordination with the Contracting Officer's Representative (COR) throughout the project.

View the file

Other files

File Type Posted
00 Cover letter with instructions.pdf PDF
W-14 Form-SAMPLE with fill-ins.pdf PDF
03 Attachment II Price Schedules.xlsx XLSX spreadsheet
01 Solicitation W912PB26BA001.pdf PDF
04 Attachment III Totals.xlsx XLSX spreadsheet
W-14 Form.pdf PDF
Bid Label.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 54 Pages Seite 1 von 54 Seiten

- 1 -

ATTACHMENT # I

DEPARTMENT OF THE ARMY

UNITED STATES ARMY GARRISON BAVARIA

DIRECTORATE OF PUBLIC WORKS

UNIT 28130

APO AE 09114-8130

14 August 2025

S P E C I F I C A T I O N

Repair Railroad Facilities, USAG Bavaria, Grafenwoehr Military Community

L E I S T U N G S B E S C H R E I B U N G

Reparieren von Bahnanlagen, USAG Bavaria, Grafenwöhr Military Community

In the event of a disagreement between the English text and the courtesy translation of this specification the English text shall govern.

Im Falle einer Unstimmigkeit zwischen dem englischen Text der Leistungsbeschreibung und der Gefälligkeitsübersetzung ist der englische Text maßgebend.

Internal code: I25RR_GV.docx, 15 Jan 2026,Fellner, last saved 14 Jan 2026 16:08:00, Fellner, Christoph LN USARMY IMCOM EUROPE (DEU)

- 2 -

TABLE OF CONTENTS

INHALTSANGABE

SUBJECT PAGE

TITEL SEITE

Cover Sheet Deckblatt 1

Table of Contents Inhaltsangabe 2

General Description Allgemeine Beschreibung 3

General Preamble Allgemeine Vorbemerkungen 4 - 29

Description of Specification Items Beschreibung der Positionen 30 - 54

- 3 -

GENERAL DESCRIPTION

The work specified includes the repair of railroad facilities such as tracks, bridges, culverts, ramps, switches, track gates, buffers, signaling facilities, technically protected and unprotected railroad crossings as well as facilities in accordance with the railroad signal regulations in Tower Barracks (Grafenwöhr) and Rose Barracks (Vilseck).

The railroad facilities are located inside and outside the fenced Barracks areas.

Most of the railroad facilities of the Tower Barracks are located outside the barracks at the Railway Station next to Gate 3. In Vilseck one track of the railroad facilities of the Rose Barracks is located outside the barracks and is the access track from the Railroad Station Vilseck into the Rose Barracks. This track is located parallel to the track of the DB Netz AG (Federal German Railway), which is the route from Nürnberg to Weiden.

ALLGEMEINE BESCHREIBUNG

Die beschriebenen Leistungen umfassen Reparaturarbeiten an den Bahnanlagen wie Gleise, Brücken, Durchlässe, Rampen, Weichen, Gleistore, Prellböcke, signaltechnische Anlagen, technisch gesicherte und ungesicherte Bahnübergänge sowie Anlagen gemäß der Eisenbahn Signalordnung in den Tower Barracks (Grafenwöhr) und Rose Barracks (Vilseck).

Die Baustellen liegen innerhalb und außerhalb der eingezäunten Kasernengelände. In Grafenwöhr liegt der größte Teil der Bahnanlagen außerhalb der Kaserne im Bahnhofsbereich bei Tor 3. In Vilseck liegt ein Gleis außerhalb der Kaserne. Dies ist das Zufahrtsgleis vom Bahnhof Vilseck in die Kaserne. Dieses Gleis liegt parallel zum DB Netz AG Gleis für die Route von Nürnberg nach Weiden.

- 4 -

General Preamble Allgemeine Vorbemerkungen

1. Regulations

The work to be accomplished and material to be furnished shall be in accordance with the following standards and regulations:

a. DIN standards (German Industry Standards) of German Construction Contract Procedures (VOB), Part C, identified below are governing:

DIN 18 299 General Regulations for all kinds of Construction Work DIN 18 325 Railroad Construction Work

b. Other regulations:

DGUV Regulation 77 Work in the area of tracks (German accident protection regulation)

Rules for prevention of accidents of Deutsche Bahn AG, DS 13203 Determinations for prevention against hazards from railroad work while working in area of tracks (accident protection regulation of German Railroads)

DGUV Regulation 101-024 Security measures while working in the area of tracks of railroads (German accident protection regulation)

Relevant regulations of the "Deutsche Bahn AG", Pamphlet DS 820 Oberbauvorschrift fuer Regelspurbahnen, including supplementary regulations to the Oberbauvorschrift (Regulation of German Railroads)

Guideline of the "Deutsche Bahn AG" 824.8001 Evaluate and accept superstructure work

Guideline of the "Deutsche Bahn AG" 824.8110 Accept new track work / repair track work

Guideline of the "Deutsche Bahn AG" 824.8210 Accept welding work Guideline of the "Deutsche Bahn AG" 824.8310 Accept rail grinding work Guideline of the "Deutsche Bahn AG" 826.1020 Qualification of firms for superstructure welding work at operational tracks Guideline of the "Deutsche Bahn AG" 826.1030 Tension compensation of gapless tracks - construction supervision for implementation of tension compensation

Standard of the "Deutsche Bahn AG" DBS 918254-1 Technical delivery conditions for rails

Standard of the "Deutsche Bahn AG" DBS 918061 Technical delivery conditions for ballast

Standard of the "Deutsche Bahn AG" DBS 918144 Technical delivery conditions for wooden ties

Construction Guidelines for Non-Federal Railways (Obri-NE) with Supplements to the Construction Guidelines for Non-Federal Railways (Obri- NE) (Regulation of German Railroads)

Bavarian waste instruction sheet No. 3.4/2 requirements to the utilization and removal of ballast and other dismantled material at tracks (ballast instruction sheet) from November 2017

Ordinance of Waste Wood (German ordinance on the management and disposal of waste wood)

German Waste Regulation 170204 Glass, plastic and wood that contain dangerous substances or are contaminated by dangerous substances

- 5 -

1. Vorschriften

Die auszuführenden Arbeiten und zu liefernden Materialien müssen den folgenden Bestimmungen und Vorschriften entsprechen:

a. DIN Bestimmungen der VOB, Teil C, wie nachfolgend aufgeführt, sind gültig:

DIN 18 299 Allgemeine Regelungen für Bauarbeiten jeder Art DIN 18 325 Gleisbauarbeiten

b. Sonstige Bestimmungen:

DGUV Vorschrift 77 Arbeiten im Bereich von Gleisen UVV der Deutschen Bahn AG, DS 13203 Bestimmungen zum Schutz gegen Gefahren aus dem Eisenbahnbetrieb bei Arbeiten im Bereich von Gleisen DGUV Regel 101-024 Sicherungsmaßnahmen bei Arbeiten im Gleisbereich von

Eisenbahnen Einschlägige Vorschriften der Deutschen Bahn AG, DS 820 "Oberbauvorschrift für Regelspurbahnen", einschließlich Ergänzungsbestimmungen zur Oberbauvorschrift.

Deutsche Bahn AG Richtlinie 824.8001 Oberbauarbeiten beurteilen und abnehmen Deutsche Bahn AG Richtlinie 824.8110 Gleisneubau-/Gleisumbauarbeiten abnehmen Deutsche Bahn AG Richtlinie 824.8210 Schweißarbeiten abnehmen Deutsche Bahn AG Richtlinie 824.8310 Schienenschleifarbeiten abnehmen Deutsche Bahn AG Richtlinie 826.1020 Qualifikation von Firmen für

Oberbauschweißarbeiten in Betriebsgleisen Deutsche Bahn AG Richtlinie 826.1030 Spannungsausgleich (SpA) lückenloser

Gleise - Bauleitung zur Durchführung des SpA Deutsche Bahn AG Standard DBS 918254-1 Technische Lieferbedingungen für

Schienen Deutsche Bahn AG Standard DBS 918061 Technische Lieferbedingungen für

Gleisschotter Deutsche Bahn AG Standard DBS 918144 Technische Lieferbedingungen für

Holzschwellen Oberbaurichtlinien für nichtbundeseigene Eisenbahnen (Obri-NE) mit Anhang zu den Oberbaurichtlinien für nichtbundeseigene Eisenbahnen (Obri-

NE)

Bayerisches Abfall- Merkblatt Nr. 3.4/2 Anforderungen an die Verwertung und Beseitigung von Gleisschotter und sonstigen Gleisausbaustoffen (Gleisschottermerkblatt) vom November 2017

Altholzverordnung (Verordnung über Anforderungen an die Verwertung und Beseitigung von Altholz)

Abfallverzeichnis-Verordnung 170204 Glas, Kunststoff und Holz, die gefährliche Stoffe enthalten oder durch gefährliche Stoffe verunreinigt sind

- 6 -

2. Authorization to Perform Work in Germany

a. Contractors performing work in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the contractor also shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Germany. The contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.

b. Contractor employees who:

(1) are not nationals of Germany or other European Union countries, and

(2) are not members of the force, the civilian component or their dependents, and

(3) do not have assimilated status under Articles 71, 72, or 73 of the

Supplementary Agreement to the NATO SOFA shall possess work and residence permits.

c. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable laws, codes, and regulations applicable to the performance of the work.

d. By acceptance of and performance under this contract and any task orders or delivery orders issued hereunder, the contractor affirms that it has complied with the requirements above. Compliance with this clause and German law is a material contract requirement. Noncompliance by the contractor or subcontractor at any tier shall be grounds for issuing a negative performance evaluation and terminating this contract, task order, or delivery order for default.

2. Befugnis in Deutschland zu arbeiten

a. Auftragnehmer, die in der Bundesrepublik Deutschland (BRD) Arbeitsleistungen erbringen, müssen deutsches Recht befolgen. Der Auftragnehmer muss ermitteln, ob die Ausführung der Arbeiten die Registrierung bei deutschen Behörden erfordert oder ob eine Genehmigung, Geschäfte zu tätigen, eingeholt werden muss, und - wenn dies der Fall ist - allen Anforderungen entsprechen. Gleichgültig, ob eine Registrierung oder die Genehmigung, Geschäfte zu tätigen, erforderlich ist, oder nicht, muss der Auftragnehmer ermitteln, welche Dokumente oder Autorisierungen seine eigenen Arbeitnehmer sowie sämtliche Arbeitnehmer von Subunternehmern besitzen müssen, um in Deutschland arbeiten zu dürfen. Der Auftragnehmer muss unbedingt sicherstellen, dass seine eigenen Arbeitnehmer und die Arbeitnehmer der Subunternehmer derartige Dokumente oder Autorisierungen besitzen.

b. Arbeitnehmer von Auftragnehmern, die:

(1) keine deutschen Staatsbürger oder keine Staatsbürger anderer Staaten der Europäischen Union sind, und

(2) keine Mitglieder der Streitkräfte, Zivilisten oder deren Familienangehörige sind, und

(3) über keinen gleichgestellten Rechtsstatus gemäß Artikel 71, 72, oder 73 der Zusatzvereinbarung zum NATO Truppenstatut verfügen (SOFA = Status of Forces Agreement), müssen Arbeits- und Aufenthaltsgenehmigungen besitzen.

- 7 -

c. Der Auftragnehmer ist, ohne dass zusätzliche Kosten für den Auftraggeber entstehen, dafür verantwortlich, jegliche Erlaubnis einzuholen und sämtliche notwendige Genehmigungen zu besorgen, und sich an sämtliche, für die Arbeitsdurchführung maßgeblichen Gesetze, Vorschriften und Bestimmungen zu halten.

d. Mit der Zustimmung zu diesem Vertrag und der Ausführung von Leistungen im

Rahmen dieses Vertrages und sämtlicher hierunter erteilten Arbeits- oder Lieferaufträge, versichert der Auftragnehmer die Erfüllung der obigen Anforderungen. Die Einhaltung dieser Klausel und des deutschen Rechts ist eine wesentliche Vertragsbedingung. Eine Zuwiderhandlung seitens des Auftragnehmers oder Subunternehmers, gleich auf welcher Ebene, hat die Erteilung einer negativen Arbeitsbeurteilung und die Beendigung dieses Vertrages, Arbeitsauftrages oder Lieferauftrages wegen Nichterfüllung zur Folge.

3. German Accident Prevention Laws and Regulations

The contractor shall comply with FAR 52.236-13, Accident Prevention, the references contained therein (e.g. EM 385-1-1), and applicable Host Nation Safety Laws and Regulations. The requirements under FAR 52.236-13 and specifically of the EM 385- 1-1 include, but are not limited to the following:

a. Before initiation of work at the job site, an accident prevention plan, written by the contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1, will be approved by designated Government personnel. Specific requirements for development of the accident prevention plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1- 1 is available online at www.usace.army.mil.

b. Before beginning any work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, an activity hazard analysis (AHA) shall be prepared by the contractor (see paragraph 01.a.09 of EM 385-1-1).

c. The contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

d. The contractor shall discuss the plans in conferences convened by the contracting officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within 15 calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than 15 calendar days prior to initiation of work on each major phase.

e. In all areas where construction, demolition, alteration, building, or similar related activities take place, the contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:

(1) Short sleeve shirt.

(2) Long trousers.

(3) Steel-toed safety boots.

(4) Hard hat.

- 8 -

f. In addition to other requirements for accident prevention specified in this contract, the contractor is responsible for compliance with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. In particular, within the requirements of the German Safety and Health Protection Regulation for Construction Sites, Baustellenverordnung (BaustellV), dated 10 June 1998, the contractor is responsible for coordination of all work at the site, including development of plans and providing advance notices. The contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the contractor will assure that it complies with the non-exclusive list of duties described in this clause. If the contractor determines that additional activities are required to fully comply, the contractor shall assure that compliance with the laws is complete. The duties include:

(1) Conditions of construction and operational activities to be considered include but are not limited construction activities meeting the following criteria:

(a) The work is scheduled to last longer than 30 working days and on which more than 20 workers are occupied simultaneously, or

(b) The volume of work is scheduled to exceed 500 person days, or the work presents particularly hazardous tasks (e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater)).

(2) If the contractor determines that the BaustellV, dated 10 June 1998, applies, the contractor shall prepare a Safety and Health Protection Plan (SIGE) as required under that regulation. The SIGE shall be submitted two weeks prior to mobilization. In addition, the contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.

(a) The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:

(i) Maintenance of tools and equipment.

(ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.

(iii) Modifying performance periods for such work, taking into consideration the site conditions.

(iv) Organizing cooperation between different employers and contractors without employees.

(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.

- 9 -

(b) The contractor is responsible for completing and providing any safety notifications required by host nation authorities and will provide proof to the contracting officer that such notifications were made.

3. Deutsche Unfallverhütungsgesetze und -vorschriften

Der Auftragnehmer muss die FAR 52.236-13, Federal Acquisition Regulation, (Beschaffungsverordnung der US-Bundesbehörden) zur Unfallverhütung befolgen, sowie die darin enthaltenen Dienstvorschriften (zum Beispiel EM 385-1-1, Engineers Manual = Ingenieursdienstvorschrift) und die maßgeblichen Sicherheitsgesetze und Vorschriften des Gastgeberstaates. FAR 52.236-13 und besonders die Dienstvorschrift EM 385-1-1 umfassen unter anderem die nachfolgenden Anforderungen:

a. Noch vor Arbeitsbeginn auf der Baustelle, wird ein vom Auftragnehmer verfasster Unfallverhütungsplan für die spezielle Arbeit und die Gefahren des Vertrages, unter genauer Einhaltung der einschlägigen Anforderungen der Dienstvorschrift EM 385-1-1, von designiertem Regierungspersonal genehmigt. Die genauen Anforderungen für die Entwicklung des Unfallverhütungsplanes sind im Abschnitt 01.A und Anhang A der Dienstvorschrift EM 385-1-1 zu finden. Die Dienstvorschrift EM 385-1-1 ist online unter dem Link: www.usace.army.mil.

verfügbar.

b. Noch vor Beginn jeglicher Arbeiten, die Gefahren darstellen, welche in vorherigen Projektabläufen noch nicht vorkamen oder bei der ein neues Team oder Subunternehmer Arbeiten durchführen müssen, hat der mit der Tätigkeit betraute Auftragnehmer eine Tätigkeits-Gefahrenanalyse (AHA - activity hazard analysis) zu erstellen. (Siehe Paragraph 01.a.09 der EM 385-1-1)

c. Der Auftragnehmer hat seine Subunternehmer zu verpflichten, eine

Arbeitsablaufsplanung vorzulegen, die die beabsichtigten Maßnahmen für die Durchführung wichtiger Arbeitsphasen aufzeigt.

d. Noch bevor mit den Arbeiten für jede größere Arbeitsphase begonnen wird, muss der Auftragnehmer in vom Contracting Officer einberufenen Konferenzen seine Pläne besprechen. Die Pläne müssen alle relevanten Informationen enthalten, wie zum Beispiel Lagepläne für Transportstraßen, Zugangsstraßen, Ablagerungsflächen, elektrische Verteilungsleitungen, die Maßnahmen, die eine Gefährdung durch Überkopf-Lasten auf ein Minimum beschränken und die Art und Weise, wie die Arbeitsstätten erreicht werden können. Der Plan zur Verwirklichung der Arbeiten in der Anfangsphase muss innerhalb von 15 Kalendertagen nach Auftragsvergabe vorliegen. Pläne für größere, darauffolgende Arbeitsphasen müssen spätestens 15 Kalendertage vor dem Arbeitsbeginn jeder größeren Phase vorliegen.

e. In allen Bereichen, in denen Bau-, Abbruch- und Änderungsarbeiten durchgeführt, Bauwerke erstellt oder ähnliche, damit in Verbindung stehende Aktivitäten stattfinden, muss der Auftragnehmer als Mindesterfordernis für jeden Arbeiter oder Besucher die im Folgenden beschriebene, persönliche Schutzkleidung und Ausrüstungsteile zur Verfügung stellen:

(1) Kurzärmeliges Hemd

(2) Lange Hose

(3) Sicherheitsschuhe mit Stahlkappen

(4) Schutzhelm

- 10 -

f. Zusätzlich zu weiteren Anforderungen an die in diesem Vertrag aufgeführten Unfallverhütungsmaßnahmen, ist der Auftragnehmer für die Einhaltung aller Bundes-und Staatsvorgaben, die für den Sicherheits- und Gesundheitsschutz auf Baustellen maßgeblich sind, sowie anderer zutreffender berufsbezogener Sicherheitsvorschriften, verantwortlich. Im Besonderen innerhalb der Anforderungen der deutschen Verordnung über Sicherheit und Gesundheitsschutz auf Baustellen (Baustellenverordnung - BaustellV), vom 10 Juni 1998, ist der Auftragnehmer für die Koordination aller Arbeiten auf der Baustelle, sowie für die Planentwicklung und die Erbringung von Vorabmitteilungen verantwortlich. Der Auftragnehmer muss seinen Plan zur Einhaltung anzeigen unter Berücksichtigung der Arbeiten, welche im Design und im technischen Angebot beschrieben sind, der operativen Aufgaben der Regierung oder anderer im Arbeitsbereich, die Bestimmung des Koordinators und die Anwendung aller Unfallverhütungsmaßnahmen dieses Vertrages. Zur Einhaltung der Gesetze und Vorschriften des Gastgeberstaates stellt der Auftragnehmer sicher, dass er die nicht-exklusive Liste der in dieser Klausel beschriebenen Verpflichtungen befolgt.

Wenn der Auftragnehmer feststellt, dass zusätzliche Maßnahmen zur vollständigen Einhaltung notwendig sind, muss er sicherstellen, dass die Gesetze eingehalten werden. Die Verpflichtungen beinhalten:

(1) Die einzuhaltenden Konditionen für bauliche und betriebliche

Tätigkeiten beinhalten - unter anderem - Baumaßnahmen, die folgende Kriterien erfüllen:

(a) Die voraussichtliche Dauer der Arbeiten beträgt mehr als 30

Arbeitstage und es werden mehr als 20 Arbeiter gleichzeitig beschäftigt, oder

(b) Der Umfang der Arbeiten übersteigt 500 Personentage, oder die

Arbeit beinhaltet besonders gefährliche Tätigkeiten (z.B. Erdaushub in einer Tiefe von mehr als 5 Metern, Arbeiten in einer Höhe von über 7 Meter, Umgang mit gefährlichen chemischen oder biologischen Substanzen, Arbeiten in einem Abstand von weniger als 5 Meter von Hochspannungsleitungen, Tiefbau- oder Tunnelarbeiten, Gefahr zu ertrinken, Arbeiten mit Tauchgeräten, Arbeiten mit Druckluft, Arbeiten mit ionisierender Strahlung, Sprengstoff oder Arbeiten die den Aufbau bzw. Abbau von schweren Fertigbauteilen beinhalten (10 Tonnen oder mehr)).

(2) Stellt der Auftragnehmer fest, dass die BaustellV vom 10 June 1998, zutreffend ist, muss er gemäß dieser Verordnung einen Sicherheits- und Gesundheitsschutzplan (SIGE) erstellen. Der „SIGE“ muss zwei Wochen vor der Baustelleneinrichtung eingereicht werden. Außerdem muss der Auftragnehmer einen qualifizierten Sicherheitsbeauftragten bestimmen, der sicherstellt, dass alle Sicherheitsmaßnahmen während der Baumaßnahme umgesetzt werden. In Übereinstimmung mit der Rechtsordnung des Gastgeberstaates muss der Sicherheitsbeauftragte ein Mindestmaß an Training und die notwendigen Erfahrungen aufweisen.

(a) SIGE wird in umfassender Form geschrieben und in einer von den

Arbeitern verständlichen Sprache erklärt und soll mindestens folgende Informationen enthalten:

(i) Instandhaltung der Arbeitsmittel.

(ii) Vorkehrungen zur Lagerung und Entsorgung der Arbeitsstoffe und Abfälle, insbesondere umweltgefährdende Materialien und Gefahrstoffe.

(iii)Anpassen der Ausführungszeiten für die Arbeiten unter Berücksichtigung der Gegebenheiten auf der Baustelle.

(iv) Zusammenarbeit zwischen verschiedenen Arbeitgebern und Auftragnehmern ohne Beschäftigte.

- 11 -

(v) Wechselwirkungen zwischen den Arbeiten auf der Baustelle und anderen betrieblichen Tätigkeiten auf dem Gelände, auf dem oder in dessen Umgebung die erstgenannten Arbeiten ausgeführt werden.

Dabei sind die Anweisungen und Empfehlungen des Koordinators sowie der Sicherheits- und Gesundheitsschutzplan zu berücksichtigen.

(b) Der Auftragnehmer ist verantwortlich für die Erstellung und

Bereitstellung jeglicher, von der zuständigen Behörde des Gastgeberlandes geforderten, Sicherheitsbekanntmachungen und muss dem Contracting Officer einen Nachweis darüber liefern.

4. Instructions for Contractor's Quality Control Plan

a. The contractor will coordinate with the COR (or receiving activity, if no COR has been appointed) to establish a contractor's Quality Control Plan (CQCP).

b. The contractor will provide a copy of the CQCP annotated with the contract number to the COR at least one week after contract start date. The COR will submit an approved copy to the contracting officer at the below listed address not later than three weeks after contract start date:

Regional Contracting Office Bavaria Building 542, Lager 92655 Grafenwöhr

c. In addition to any requirements in the specification or statement of work, the contractor's quality control plan must have as a minimum:

(1) Identification and clearly defined authority of key personnel under the contractor's organization.

(2) A quality inspection system covering all general and specific tasks included in the contract scope of work. It should specify tasks or areas to be inspected on either a scheduled or unscheduled basis, and the manner in which inspections are to be conducted.

(3) The names of firms or individuals tasked to perform inspections and the extent of their authority. This may be in the form of an organization chart or other form approved by the contracting officer's representative (COR).

(4) Proposed test methods, including names of technicians or qualified testing laboratories to be used, if applicable. Tests must be specified.

(5) A method of identifying deficiencies in the quality of services or construction performed before the level of performance becomes unacceptable.

(6) A method of documenting and enforcing quality control operations of both prime and subcontractor work, including inspection and testing.

(7) Key control, internal control or security procedures, if applicable.

(8) Any winterization plans and procedures for outdoor and exposed contractor and Government furnished equipment, if applicable.

(9) A method of identifying deficiencies in the quality of manufacturing, services, or construction performed before the level of performance becomes unacceptable.

(10) Detailed information specifying the types of action the contractor will take to correct deficiencies and prevent their recurrence.

(11) Detailed information on the inspection methods used and proposed test methods, including names of technicians or qualified testing laboratories to be used, if applicable. Tests shall be specified.

- 12 -

4. Qualitätskontrollplan des Auftragnehmers

a. Der Auftragnehmer muss in Abstimmung mit dem COR (oder, falls kein COR ernannt wurde, mit dem Leistungsempfänger) einen annehmbaren Fertigungs- /Gütekontrollplan (CQCP) erstellen.

b. Eine Kopie des genehmigten Fertigungs-/Gütekontrollplans, unter Angabe der Vertragsnummer, muss spätestens eine Woche nach Vertragsbeginn beim Vertreter des Contracting Officers (COR) vorliegen. Der Vertreter des Contracting Officers hat den genehmigten Fertigungs-/Gütekontrollplans dem Contracting Officer spätestens drei Wochen nach Vertragsbeginn unter folgender Adresse einzureichen.

Regional Contracting Office Bavaria Building 542, Lager 92655 Grafenwöhr

c. Außer den Anforderungen des Leistungsverzeichnisses bzw. der Arbeitsbeschreibung, muss der Fertigungs-/Gütekontrollplan mindestens folgendes beinhalten:

(1) Benennung des verantwortlichen Schlüsselpersonals (Bauleiter etc.) und dessen Befugnisse innerhalb der Organisation des Vertragsnehmers.

(2) Alle speziellen Erfordernisse, die den Umfang der Arbeit ausmachen, müssen durch das Fertigungs-/Gütekontrollsystem abgedeckt sein. Die Art der Kontrolle/Inspektion, planmäßig oder außerplanmäßig, sowie die Arbeit/Arbeitsbereiche selber müssen genau dargelegt werden.

(3) Die Namen der Firmen oder Einzelpersonen, die damit beauftragt wurden, die Fertigungs-/Gütekontrollen durchzuführen und deren klare Befugnisse. Dies kann in der Form einer Organisationsübersicht oder eines anderen, vom Vertreter des Contracting Officers (COR) genehmigten Vorschlages erfolgen.

(4) Die beabsichtigten Prüfungsmethoden, unter Angabe der Namen der Techniker bzw. der Testlaboratorien, die dafür vorgesehen sind (falls zutreffend). Die Tests müssen ausführlich beschrieben werden.

(5) Eine Methode zur Feststellung von Mängeln im Arbeits-/ Leistungsablauf, die eine Nichtabnahme/-annahme seitens des Auftraggebers vorbeugend verhindert.

(6) Ein Nachweis- bzw. Ausführungsverfahren der Fertigungs-/ Gütekontrollmethoden von Leistungen des Hauptunternehmers als auch aller Subunternehmer, einschließlich der vorgesehenen Inspektionen und Tests.

(7) Alle wesentlichen und innerbetrieblichen Kontrollen sowie alle Sicherheitsmaßnahmen (falls zutreffend).

(8) Alle Pläne und Verfahren zur Winterfestmachung von ungeschützten Ausrüstungsgegenständen des Vertragsnehmers oder -gebers.

(9) Eine Methode zur Feststellung von Qualitätsmängeln in der Produktion, im Dienstleistungsbetrieb oder bei den Bauarbeiten, die eine Nichtabnahme/-annahme seitens des Auftraggebers vorbeugend verhindert.

(10) Ausführliche Informationen welche Maßnahmen der Auftragnehmer ergreifen wird um Mängel zu korrigieren und ihre Wiederholung zu verhindern.

(11) Ausführliche Informationen über die angewandten Inspektionsmethoden und die beabsichtigten Testmethoden, unter Angabe der Namen der Techniker bzw. der Testlaboratorien, die dafür vorgesehen sind (falls zutreffend). Die Tests müssen ausführlich beschrieben werden.

- 13 -

5. Disposal of Debris

a. The Sanitary Landfill Grafenwöhr will not accept material, such as ballast, old railroad ties, asphalt, concrete, wood, construction debris, metal, branches, rootstocks, cardboard, hazardous waste (cleaning agents, paints etc.), dismantled material (cables, pipes, installation material etc.) or soil excavation. This material becomes property of the contractor and shall be disposed of in accordance with German laws and regulations (for example Closed Cycle and Waste Management Act, Ordinance of Waste Wood Management, Guideline 3.4/1 of the Bavarian Water Board for tar debris, etc.).

If applicable, the contractor must commission a certified laboratory to analyze representative samples for classification. Sampling and chemical analysis of the excavated soil shall be executed according to LAGA PN 98 (German Interstate Working Party on Waste Processing - Ordinance for the procedure for physical, chemical and biological analyses in connection with recycling/removal of waste). If the sample analysis shows contamination classifications not included in any of the specification items, an appropriate contract modification may be issued.

b. Waste wood resulting from demolition work shall be disassembled individually and stored separate from other debris. The disposal shall be in compliance with the German Ordinance on the Management of Waste wood ("Altholzverordnung"). Waste wood shall be categorized and disposed of based on the Ordinance on the Management of Waste wood.

c. A copy of the waste consignment document shall be provided to the COR.

d. The dismantled material shall be stored in water-tight covered containers until removal. Alternatively, they can also be stored on paved areas and covered water-tight. Storing of dismantled material in the range of waters is not allowed.

e. Within USAG Bavaria, Grafenwöhr Military Community there is a separate sewer system for rain water and waste water. Therefore, accumulated waste water shall be disposed of via waste water duct in coordination with the COR.

5. Bauschuttabfuhr

a. Material, wie Gleisschotter, Altschwellen, Teeraufbruch, Beton, Holz, Bauschutt, Metall, Äste, Wurzelstöcke, Kartonagen, Sondermüll (Reiniger, Farben, etc.), ausgebaute Materialien (Kabel, Rohre, Installationsmaterialien, etc.) oder Erdaushub werden nicht an der Mülldeponie im Lager Grafenwöhr angenommen. Diese Materialien werden Eigentum des Auftragnehmers und sind gemäß deutschen Gesetzen und Vorschriften (zum Beispiel Kreislaufwirtschaftsgesetz, Altholzverordnung, Merkblatt 3.4/1 des Bayerischen Landesamt für Wasserwirtschaft für Teeraufbruch, etc.) zu entsorgen.

Gegebenenfalls muss der Auftragnehmer ein zertifiziertes Labor beauftragen, repräsentative Proben zu untersuchen und entsprechend einzustufen. Die Probenahme und Analytik des Bodenaushubs muss nach der Richtlinie LAGA PN 98 (Länderarbeitsgemeinschaft Abfall - Richtlinie für das Vorgehen bei physikalischen, chemischen und biologischen Untersuchungen im Zusammenhang mit der Verwertung / Beseitigung von Abfällen) erfolgen. Falls die Probeuntersuchung eine Einstufung der Kontamination aufweist, die nicht in irgendeiner Position der Leistungsbeschreibung beinhaltet ist, kann eine entsprechende Vertragsmodifikation erstellt werden.

- 14 -

b. Fallen im Zuge der Abbrucharbeiten Holzabfälle an, sind diese separat zurück zu bauen und von den übrigen Abfällen getrennt zur Entsorgung bereit zu stellen.

Die Entsorgung ist in der Altholzverordnung geregelt. Der anfallende Holzabfall ist gemäß den Kategorien der Altholzverordung einzuteilen und zu entsorgen.

c. Eine Kopie des jeweiligen Entsorgungsnachweises muss dem COR ausgehändigt werden.

d. Bauabfälle sind bis zur Abfuhr in wasserdicht abgedeckten Containern zu lagern. Alternativ können diese auch auf befestigten Flächen gelagert und wasserdicht abgedeckt werden. Eine Lagerung von Bauabfällen im Bereich von Gewässern ist nicht erlaubt.

e. Im Bereich der USAG Bavaria, Grafenwöhr Military Community besteht ein Trennsystem für Regenwasser und Schmutzwasser. Anfallendes Schmutzwasser muss deshalb nach Angabe des COR über den Schmutzwasserkanal entsorgt werden.

6. Disposal of Contaminated Ballast

a. Follow the Bavarian waste instruction sheet No. 3.4/2 for the disposal of contaminated ballast.

b. Organoleptically conspicuous removed ballast shall be lab-examined for contamination according to the criteria of LAGA (Working Group of the Federal States on Waste) and the German landfill ordinance.

Sampling shall be performed in accordance with the LAGA-information 32 – PN 98.

The contractor shall take as many individual samples as necessary in order to achieve the full number of composite samples in accordance with table 2 of PN 98.

The installation classes shall be determined in accordance with the identified parameters of the respective classification values and the material shall be disposed of accordingly.

c. The contractor shall coordinate with the COR the sampling needed for the analysis and test report.

d. A copy of the waste consignment document, accompanying papers and weight certificate shall be provided to the COR.

6. Entsorgung von kontaminiertem Gleisschotter

a. Bei der Entsorgung von kontaminiertem Gleisschotter ist das Bayerische Abfall-Merkblatt Nr. 3.4/2 zu beachten.

b. Organoleptisch auffälliger, ausgebauter Schotter muss auf Kontamination gemäß LAGA-Kriterien (Länderarbeitsgemeinschaft Abfall) und der Deponieverordnung untersucht werden.

Die Probenahme hat gemäß der LAGA-Mitteilung 32 – PN 98 zu erfolgen. Es sind so viele Einzelproben zu entnehmen, dass die vollständige Anzahl von Mischproben gemäß Tabelle 2 der PN 98 erreicht wird.

Nach den ermittelten Parametern der Zuordnungswerte sind die Einbauklassen festzulegen und das Material entsprechend zu entsorgen.

c. Zur Entnahme der Proben durch den Auftragnehmer für die Erstellung der Analyse und des Testberichtes hat der Auftragnehmer mit dem COR Kontakt aufzunehmen.

- 15 -

d. Eine Kopie des Entsorgungsnachweises, Begleitscheins und Wiegescheins muss dem COR ausgehändigt werden.

7. Job Site Equipment and Storage

The contractor shall be responsible for the safe storage of materials and equipment. Upon approval from the COR and at their own risk the contractor may be authorized to erect containers for personnel and construction equipment/materials according to current German workplace ordinance. These containers must be a minimum of 25 meters away from any building occupied by 10 or more personnel.

Construction materials and other equipment shall not be stored in U.S. buildings.

Upon completion of work the contractor shall clean up the storage area and return it to its original condition.

7. Baustelleneinrichtung und Materiallagerung

Der Auftragnehmer ist für eine sichere Lagerung der Materialien und Geräte selbst verantwortlich. Er darf mit Genehmigung des COR und auf eigene Gefahr Container für Personal und Baugeräte/Material gemäß der Arbeitstättenverordnung aufstellen.

Diese Container müssen mindestens 25 m von allen Gebäuden entfernt sein, in denen sich zehn oder mehr Personen aufhalten. Baumaterial und sonstige Gegenstände dürfen nicht in U.S. Gebäuden gelagert werden. Nach Beendigung der Arbeiten ist der Lagerplatz zu reinigen und wieder in den ursprünglichen Zustand zu versetzen.

8. Electromagnetic Compatibility Directive (Germany)

The contractor certifies that all electrical and electronic equipment and appliances furnished are in compliance with the Electromagnetic Compatibility Directive 2014/30/EU. For radio transmitting and telecommunication devices furnished in the Federal Republic of Germany, the contractor certifies that all such items have been approved by the Bundesamt für Zulassungen. Any penalties for noncompliance imposed by the Government of the European country where the equipment or appliances are delivered or product liability claims caused by interference generated by furnished appliances or equipment are solely the responsibility of the contractor.

8. Elektromagnetische Verträglichkeit (Deutschland)

Der Auftragnehmer bescheinigt, dass alle gelieferten elektrischen und elektronischen Betriebsmittel und Geräte mit der Richtlinie über die elektromagnetische Verträglichkeit 2014/30/EU übereinstimmen. Für Funkgeräte und Fernmeldeeinrichtungen, die in der Bundesrepublik Deutschland verwendet werden, bescheinigt der Auftragnehmer, dass diese vom Bundesamt für Zulassungen genehmigt wurden. Alle Strafen für die Nichteinhaltung dieser Bestimmungen, welche von Behörden des europäischen Landes erlassen werden, in die die Betriebsmittel oder Geräte geliefert wurden oder Produkthaftungsansprüche wegen Störungen, die durch die gelieferten Geräte oder Betriebsmittel verursacht wurden, gehen allein zu Lasten des Auftragnehmers.

- 16 -

9. Traffic Control

The contractor shall ensure that traffic flow interruptions, due to construction work, will be kept to a minimum. No construction work shall impede traffic between 0630 and 0730 hours and between 1530 and 1630 hours. The contractor is responsible for traffic control; if necessary, traffic lights shall be used.

9. Verkehrsregelung

Der Auftragnehmer hat dafür Sorge zu tragen, dass die Bauarbeiten den fließenden Verkehr nicht übermäßig behindern. Deshalb sind zwischen 06.30 und 07.30 Uhr und zwischen 15.30 und 16.30 Uhr Bauarbeiten, die den Verkehr behindern, zu unterbrechen. Für die Verkehrsregelung ist Sorge zu tragen, notfalls mit einer Ampelanlage.

10. Construction Performance

The contractor is responsible for locating underground electrical, heating, water and telephone lines by means of cable searching devices or similar equipment.

Damage caused by the contractor shall be repaired by the contractor at their own expense.

10. Bauausführung

Der Auftragnehmer ist dafür verantwortlich, die Elektro-, Heizungs-, Wasser- und Telefonleitungen im Erdreich mittels Kabelsuchgeräten oder ähnlichem zu lokalisieren. Eventuelle Beschädigungen müssen von ihm auf seine Kosten behoben werden.

11. Water and Electrical Power Supply

Water and electrical power are not available at job sites. If required, water and electrical power shall be provided by the contractor (e. g. emergency power generator, water containers).

11. Wasser- und Baustromversorgung

Wasser und Baustrom sind an den Baustellen nicht vorhanden. Falls erforderlich, muss beides vom Auftragnehmer gestellt werden (z. B. Notstromaggregat, Wasserbehälter).

12. Welding and Cutting Work

Contractors who are responsible for welding and cutting work shall coordinate with the COR in writing in order to attend the mandatory safety briefing at the local Fire Station prior to start of work. After the briefing, a Hot Work Permit (DA Form 5383) will be issued to the welders.

For the performance of the welding work at rail material/superstructure parts, the qualifications and requirements stated under paragraph 18. "Special Qualifications" below shall be considered.

- 17 -

12. Schweiß- und Schneidarbeiten

Auftragnehmer, die für Schweiß- und Schneidarbeiten zuständig sind, werden vom COR angewiesen, einer Sicherheitsbesprechung bei der örtlichen U. S. Feuerwehr beizuwohnen. Nach der Besprechung wird ein Erlaubnisschein für Schweißarbeiten (Hot Work Permit, DA Form 5383) an die Schweißer ausgegeben.

Für die Ausführung von Schweißarbeiten an Schienenwerkstoffen/Oberbauteilen müssen die in Paragraph 18 "Spezielle Qualifikationen" beschriebenen Qualifikationen und Erfordernisse berücksichtigt werden.

13. Spill reporting procedures for contractors working within the Training Area/Tower Barracks and Rose Barracks

a. Applicability: In accordance with USAG Bavaria’s Environmental Management System (EMS) the following procedures shall be followed in the event of a spill of hazardous substances caused by vehicles or equipment of contractors working within the Training Area/Tower Barracks or Rose Barracks

b. Hazards for humans and environment:

- Release of hazardous substances during accidents (mainly Petroleum, Oil and

Lubricant (POL)products);

- Release of hazardous substances caused by equipment failure (mainly POL products)

- Release of hazardous substances during transportation of hazardous materials/waste (excluding Class 1, explosives).

c. Protective Measures and Procedures: The following requirements must be met when operating a vehicle within the Training Area/Tower Barracks or Rose Barracks.

- Valid driving license appropriate for the vehicle;

- Valid hazardous cargo driver’s license for the transportation of hazardous material/hazardous waste;

- Follow the Road Traffic Regulation:

- Road Traffic Law (Straßenverkehrsgesetz - StVG);

- Road Traffic Regulation (Straßenverkehrsordnung - StVO)Federal Motor Vehicle

Safety Standards (Straßenverkehrs-Zulassungs-Ordnung - StVZO);

- European Agreement concerning the international carriage of dangerous goods by road (Accord europeen relatif au transport international des marchandises Dangereuses par Route - ADR);

- Load safety according to VDI 2700 and ADR

- Spill equipment shall be kept on hand (e.g. absorbent, absorbent pads etc.).

d. The following procedures shall be followed should hazardous situations arise:

- Immediately notify the COR and the local US Fire Department under the following number: 09641 – 83 8303 if hazardous substances (diesel, hydraulic fluid etc.), including hazardous waste, are released due to failure of vehicles or construction equipment;

- The contractor shall take immediate protective measures to prevent spilled material from spreading;

- 18 -

- The necessary spill clean-up shall be performed by the contractor or their subcontractors.

e. Emergency Procedures – First Aid:

- Secure scene of the accident;

- Inform the COR and the local U.S. Fire Department at 09641-83-8303 (emergency number: 09641-83-112);

- Provide first aid to injured individuals

f. Refueling, Maintenance, Disposal:

- To avoid impacting the environment, appropriate precautionary measures shall be taken during refueling of construction vehicles / equipment;

- Maintenance of vehicles and equipment shall only be conducted on paved surfaces connected to an oil/water separator (such as maintenance hardstands/refueling pads);

- The contractor is responsible for the disposal of hazardous substances and contaminated soil caused by accidents or failure of vehicles/equipment. Proof of proper disposal shall be provided to the COR (Entsorgungsnachweis).

13. Verhaltensregeln für Auftragnehmer bei Freisetzung von Gefahrstoffen auf dem Truppenübungsplatz/Tower Barracks (Grafenwöhr) bzw. Rose Barracks (Vilseck)

a. Geltungsbereich: Gemäß dem Umweltmanagementsystem (Environmental Management System – EMS) von USAG Bavaria, wird im Folgenden das Verhalten bei Freisetzung von Gefahrstoffen während des Betriebs von Baufahrzeugen von auf dem Truppenübungsplatz/Tower Barracks bzw. in der Rose Barracks tätigen Auftragnehmern beschrieben.

b. Gefahren für Mensch und Umwelt:

- Freisetzen von Gefahrstoffen bei Unfällen (in der Regel Mineralöle).

- Freisetzen von Gefahrstoffen durch defekte Maschinen (in der Regel Mineralöle).

- Freisetzen von Gefahrstoffen bei Gefahrstofftransporten/Sondermülltransporten

(ausgenommen Klasse 1, Sprengstoffe)

c. Schutzmaßnahmen und Verhaltensregeln: Voraussetzung für das Führen eines Fahrzeuges auf dem Truppenübungsplatz/Tower Barracks bzw. in der Rose Barracks:

- Gültige Fahrerlaubnis für das entsprechende Fahrzeug.

- Gültiger Gefahrgutführerschein beim Transport von Gefahrgut/Sondermüll.

- Einhalten der Vorschriften des Straßenverkehrsrechts:

- Straßenverkehrsgesetz (StVG)

- Straßenverkehrsverordnung (StVO)

- Straßenverkehrs-Zulassungs-Ordnung (StVZO)

- Europäisches Abkommen zum internationalen Transport von Gefahrgütern auf

Straßen (Accord europeen relatif au transport international des marchandises Dangereuses par Route - ADR).

- Ladungssicherung entsprechend VDI 2700 und ADR

- Ausrüstung zur Bekämpfung von Ölunfällen ist für den Notfall bereitzuhalten

(z.B. Bindemittel, Ölbindematten etc.).

- 19 -

d. Verhalten bei Störungen und im Gefahrfall:

- Bei Freisetzen von Gefahrstoffen (auch Sondermüll) oder Betriebsmitteln

(Hydrauliköl, Diesel usw.) durch Defekte an Fahrzeugen bzw. Baumaschinen sind sofort der COR und die Standortfeuerwehr unter der Telefonnummer 09641-83-8303 zu verständigen.

- Der Auftragnehmer hat dafür zu sorgen, dass geeignete Sofortmaßnahmen getroffen werden um ein Ausbreiten zu verhindern.

- Die anfallenden Reinigungsarbeiten sind vom Auftragnehmer bzw. Subunternehmer durchzuführen.

e. Verhalten bei Unfällen - Erste Hilfe:

- Unfallstelle sichern.

- COR und Standortfeuerwehr unter 09641-83-8303 (Notruf: 09641-83-112) verständigen.

- Verletzte versorgen.

f. Betanken, Instandhaltung, Entsorgung:

- Beim Betanken von Baustellenfahrzeugen / Baumaschinen sind geeignete

Vorsichtsmaßnahmen zu treffen, um Umweltschäden zu vermeiden.

- Instandhaltungsarbeiten an Fahrzeugen und Baumaschinen sind grundsätzlich nur auf befestigtem Untergrund mit Anschluss an einen Ölabscheider durchzuführen (z.B. Wartungs- und Betankungsflächen).

- Die Entsorgung von ausgelaufenen Substanzen oder von verunreinigtem Boden als Folge von Unfällen oder durch defekte Fahrzeuge/Baumaschinen ist vom Auftragnehmer selbst durchzuführen. Dem COR ist ein Entsorgungsnachweis vorzulegen.

14. Anti-Terrorism/Operations Security (AT/OPSEC) Requirements

Contractors and subcontractors shall comply with the following marked AT/OPSEC requirements:

☒ a. Access and General Protection/Security Policy and Procedures. The contractor and all associated subcontractor employees will comply with applicable installation, facility, and area commander installation/facility access and local security policy and procedures (provided by Government representative). The contractor will also provide all information required for background checks to meet installation-access requirements to be accomplished by the installation provost marshal office, director of emergency services, or security office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

☒ b. Suspicious Activity Reporting Program Training. The contractor and all associated subcontractors will brief all employees on the local Suspicious Activity Reporting Program (training standards provided by the requiring activity AT officer). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct

- 20 -employees to report suspicious activity to the COR. This training will be completed within 30 calendar days after the contract is awarded and within 5 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded.

☒ c. Antiterrorism Level 1 Training. The contractor and all associated subcontractors will brief all employees on the local AT Level 1 program (training standards provided by the requiring activity AT officer). This locally developed training may change based on local threat at which time the AT officer will provide updated materials for the briefing. This training will be completed within 30 calendar days after the contract is awarded and within 5 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded.

☒ d. OPSEC Training. The contractor and all associated subcontractors will brief all employees on the local OPSEC program (training standards provided by the requiring activity AT officer). This locally developed training may change based on local threat at which time the AT officer will provide updated materials for the briefing. This training will be completed within 30 calendar days after the contract is awarded and within 5 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded.

14. Vorschriften zur Sicherheit und Anti-Terrormaßnahmen (AT/OPSEC)

Auftragnehmer und Subunternehmer sollen die folgenden markierten AT/OPSEC Vorschriften erfüllen:

☒ a. Vorschriften und Regelungen für den Zutritt zum Gelände und allgemeine Schutzmaßnahmen. Der Auftragnehmer und alle Subunternehmer müssen die gültigen Vorschriften und Anweisungen für den Zutritt zum Gelände und allgemeine Sicherheitsregeln befolgen (werden von einem Vertreter der US Armee ausgehändigt).

Der Auftragnehmer muss alle Unterlagen zur Durchführung einer Sicherheitsüberprüfung vorlegen, damit die…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .