0190-0491_PlanSet_BidIssue_3_of_4.pdf
PDF 6 MB Posted
- Attached to
- Fraser Industrial District S. A. D.
- Solicitation number
- 0190-0491
- Issued by
- Macomb County, Flint City, Michigan
About this file
The document is a staging and traffic management plan set for the Fraser Industrial District Special Assessment District (S.A.D.) project in the City of Fraser, Michigan, prepared by Anderson, Eckstein and Westrick, Inc. The plan details a phased traffic maintenance strategy for multiple roadways including Riviera Drive, James J. Pompo Drive, and Malyn Boulevard during a comprehensive road reconstruction project. The plan is divided into multiple stages (1A, 1B, 2A, 2B) and includes detailed drawings showing traffic flow modifications, barricade placements, road closures, and traffic control signage for each construction phase.
The staging plans utilize Type III barricades, lighted supplemental signage, and plastic drums spaced at 50-foot intervals to manage traffic during construction. Each roadway segment is strategically mapped to maintain partial traffic flow while allowing construction work to progress. The drawings include specific details about traffic routing, road closure areas, and temporary signage placement, ensuring minimal disruption to local traffic while facilitating the complete removal and replacement of existing concrete pavement, integral curbs, storm drainage systems, sidewalks, and associated infrastructure improvements. The comprehensive approach demonstrates careful planning to balance construction needs with ongoing community mobility requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0190-0491_PlanSet_BidIssue_1_of_4.pdf | ||
| 0190-0491_PlanSet_BidIssue_2_of_4.pdf | ||
| 0190-0491_PlanSet_BidIssue_4_of_4.pdf | ||
| 0190-0491_Complete_SpecBook.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00
+0
+0
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00
+0
+0
SCALE:
106 RIVERA--5/5/2025 6:09:29 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
ESR MAV MARCH 2025
###### HORIZ.
1" = X' VERT.
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
106 RIVERA--5/5/2025 6:09:30 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
C R
O
SS
R O
A D
RIVIERA DRIVE
MAINTAINING
TRAFFIC PLAN
RIVIERA DRIVE
PHASE 2
M
AT
C H
L
IN
E
+0
(S
EE
S H
EE
T
7)
C R
O
SS
R O
A D
RIVIERA DRIVE
M
AT
C H
L
IN
E
+0
(S
EE
S H
EE
T
8)
LEGEND
Stage 1A & 1B
Stage 2A & 2B
TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4
TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4
THRU TRAFFIC
ROAD CLOSED
TO
R11-4
THRU TRAFFIC
ROAD CLOSED
TO
R11-4
PLASTIC DRUMS SPACED @50' APART
PLASTIC DRUMS SPACED @50' APART
STAGE 1A
STAGE 1B
Plastic Drum
Temporary Sign
Traffic Flow, This Stage
Type III Barricade, Lighted W/Supplemental Signage
Type III Barricade, Lighted
18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00
+0
+0
25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
SCALE:
107 REVERA 1A1B--5/5/2025 6:09:31 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
MAINTAINING
TRAFFIC PLAN
RIVIERA DRIVE
PHASE 2
ESR MAV MARCH 2025
1"=30' HORIZ.
15 30 60
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
107 REVERA 1A1B--5/5/2025 6:09:31 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
RIVIERA DRIVE RIVIERA DRIVE
M A
LY
N
B O
U
LE
VA
R
D
RIVIERA DRIVE
M
AT
C H
L
IN
E
SE
E
BO
TT
O
M L
EF
T
(S
EE
T H
IS
S
H
EE
T
M
AT
C H
L
IN
E
SE
E U
PP
ER
R
IG
H T
(S
EE
T H
IS
S
H
EE
T) M
AT
C
H L
IN
E
+0
(S
EE
S
H
EE
T
6)
LEGEND
Stage 1A
Stage 2A
TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4
THRU TRAFFIC
ROAD CLOSED
TO
R11-4
PLASTIC DRUMS SPACED @50' APART
PLASTIC DRUMS SPACED @50' APARTSEE SHEET 05 FOR DETAILS
SEE SHEET 05 FOR DETAILS
SEE SHEET 05 FOR DETAILS
Plastic Drum
Temporary Sign
Traffic Flow, This Stage
Type III Barricade, Lighted
Type III Barricade, LightedSTAGE 1A & 2A
18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00
+0
+0
25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
SCALE:
108 REVERA 2A2B--5/5/2025 6:09:32 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
MAINTAINING
TRAFFIC PLAN
RIVIERA DRIVE
PHASE 2
ESR MAV MARCH 2025
1"=30' HORIZ.
15 30 60
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
108 REVERA 2A2B--5/5/2025 6:09:32 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
RIVIERA DRIVE RIVIERA DRIVE
M A
LY
N
B O
U
LE
VA
R
D
RIVIERA DRIVE
M
AT
C H
L
IN
E
SE
E
BO
TT
O
M L
EF
T
(S
EE
T H
IS
S
H
EE
T
M
AT
C H
L
IN
E
SE
E U
PP
ER
R
IG
H T
(S
EE
T H
IS
S
H
EE
T) M
AT
C
H L
IN
E
+0
(S
EE
S
H
EE
T
6)
LEGEND
Stage 1B
Stage 2B
TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4
THRU TRAFFIC
ROAD CLOSED
TO
R11-4
PLASTIC DRUMS SPACED @50' APART
PLASTIC DRUMS SPACED @50' APART
SEE SHEET 05 FOR DETAILS
Plastic Drum
Temporary Sign
Traffic Flow, This Stage
Type III Barricade, Lighted W/Supplemental Signage
STAGE 1B & 2B
+0
+0
+0
+0
10+00
11+00 12+00 13+00 14+00
+00
+0
+0
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
SCALE:
109 JAMES 1A--5/5/2025 6:09:33 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
ESR MAV MARCH 2025
###### HORIZ.
1" = X' VERT.
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
109 JAMES 1A--5/5/2025 6:09:33 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
JA
M
ES
J
P O
M
PO
D R
IV
E
D O
R
EK
A D
R
IV
E
MAINTAINING
TRAFFIC PLAN
JAMES J POMPO ROAD
PHASE 2
MATCH LINE 17+00
(SEE SHEET 111)
LEGEND
Stage 1A
TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4
THRU TRAFFIC
ROAD CLOSED
TO
R11-4
PLASTIC DRUMS SPACED @50' APART
Plastic Drum
Temporary Sign
Traffic Flow, This Stage
Type III Barricade, Lighted W/Supplemental Signage
STAGE 1A
+0
+0
+0
+0
10+00
11+00 12+00 13+00 14+00
+00
+0
+0
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
SCALE:
110 JAMES 2A 2B--5/5/2025 6:09:34 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
ESR MAV MARCH 2025
###### HORIZ.
1" = X' VERT.
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
110 JAMES 2A 2B--5/5/2025 6:09:34 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
JA
M
ES
J
P O
M
PO
D R
IV
E
D O
R
EK
A D
R
IV
E
MAINTAINING
TRAFFIC PLAN
JAMES J POMPO ROAD
PHASE 2
MATCH LINE 17+00
(SEE SHEET 112)
LEGEND
Stage 1B
Stage 2B
TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4
THRU TRAFFIC
ROAD CLOSED
TO
R11-4
PLASTIC DRUMS SPACED @50' APART
SEE SHEET 05 FOR DETAILS
Plastic Drum
Temporary Sign
Traffic Flow, This Stage
Type III Barricade, Lighted W/Supplemental Signage
17+00
18+00
19+00 20+00 21+00 22+00 23+00 24+00
43+00
44+00
45+00
25+00 26+00 27+00 28+00 29+00 30+00
31+00
32+00
33+00
12+00
13+00
14+00
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
SCALE:
111 JAMES 1A1B--5/5/2025 6:09:35 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
MAINTAINING
TRAFFIC PLAN
JAMES J POMPO DRIVE
PHASE 2
ESR MAV MARCH 2025
1"=30' HORIZ.
15 30 60
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
111 JAMES 1A1B--5/5/2025 6:09:35 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
JAMES J POMPO
DRIVE
JAMES J POMPO DRIVE
M
ALYN ROAD
M
IKE C ROAD
JAMES J POMPO DRIVE
M
AT
C H
L
IN
E
SE
E
BO
TT
O
M L
EF
T
(S
EE
T H
IS
S
H
EE
T
M
AT
C H
L
IN
E
SE
E U
PP
ER
R
IG
H T
(S
EE
T H
IS
S
H
EE
T)
M
ATCH LINE 17+00
(SEE SHEET 109)
LEGEND
Stage 1A
Stage 2A
TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4
THRU TRAFFIC
ROAD CLOSED
TO
R11-4
PLASTIC DRUMS SPACED @50' APART
PLASTIC DRUMS SPACED @50' APART
SEE SHEET 05 FOR DETAILS
SEE SHEET 05 FOR DETAILS
Plastic Drum
Temporary Sign
Traffic Flow, This Stage
Type III Barricade, Lighted
17+00
18+00
19+00 20+00 21+00 22+00 23+00 24+00
43+00
44+00
45+00
25+00 26+00 27+00 28+00 29+00 30+00
31+00
32+00
33+00
12+00
13+00
14+00
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
SCALE:
112 JAMES 2A2B--5/5/2025 6:09:37 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
MAINTAINING
TRAFFIC PLAN
JAMES J POMPO DRIVE
PHASE 2
ESR MAV MARCH 2025
1"=30' HORIZ.
15 30 60
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
112 JAMES 2A2B--5/5/2025 6:09:37 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
JAMES J POMPO
DRIVE
JAMES J POMPO DRIVE
M
ALYN ROAD
M
IKE C ROAD
JAMES J POMPO DRIVE
M
AT
C H
L
IN
E
SE
E
BO
TT
O
M L
EF
T
(S
EE
T H
IS
S
H
EE
T
M
AT
C H
L
IN
E
SE
E U
PP
ER
R
IG
H T
(S
EE
T H
IS
S
H
EE
T)
M
ATCH LINE 17+00
(SEE SHEET 110)
LEGEND
Stage 1B
Stage 2B
TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4
THRU TRAFFIC
ROAD CLOSED
TO
R11-4
PLASTIC DRUMS SPACED @50' APART
PLASTIC DRUMS SPACED @50' APART
Plastic Drum
Temporary Sign
Traffic Flow, This Stage
Type III Barricade, Lighted W/Supplemental Signage
+0
+0
17+00
18+00
19+00
20+00
21+00
22+00 23+00
24+00
25+00
+0
0 SCALE:
113 MALYN 1A1B--5/5/2025 6:09:45 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_3.DWG
MAINTAINING
TRAFFIC PLAN
MALYN BOULEVARD
PHASE 3
ESR MAV MARCH 2025
1"=30' HORIZ.
15 30 60
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
113 MALYN 1A1B--5/5/2025 6:09:45 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_3.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
MALYN
BOULEVARD
C O
M M
ER
C
E R
O A
D
MALYN
BLVD.
RIVIERA DR.
M
AT
C H
L
IN
E
SE
E
BO
TT
O
M L
EF
T
(S
EE
T H
IS
S
H
EE
T
M
ATC
H
LIN
E SEE U
PPER
R
IG
H T
(SEE TH
IS SH
EET)
LEGEND
Stage 1A
Stage 2A
TWO TYPE III BARRICADES W/ ONE (1) R11-4
THRU TRAFFIC
ROAD CLOSED
TO
R11-4
PLASTIC DRUMS SPACED @50' APART
PLASTIC DRUMS SPACED @50' APART
SEE SHEET 05 FOR DETAILS
Plastic Drum
Temporary Sign
Traffic Flow, This Stage
Type III Barricade, Lighted
+0
+0
17+00
18+00
19+00
20+00
21+00
22+00 23+00
24+00
25+00
+0
SCALE:
114 MALYN 2A2B--5/5/2025 6:09:47 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_3.DWG
MAINTAINING
TRAFFIC PLAN
MALYN BOULEVARD
PHASE 3
ESR MAV MARCH 2025
1"=30' HORIZ.
15 30 60
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
114 MALYN 2A2B--5/5/2025 6:09:47 AM
M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_3.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
0190-0491
FRASER INDUSTRIAL
DISTRICT S.A.D.
CITY OF FRASER
MALYN
BOULEVARD
C O
M M
ER
C
E R
O A
D
MALYN
BLVD.
RIVIERA DR.
M
AT
C H
L
IN
E
SE
E
BO
TT
O
M L
EF
T
(S
EE
T H
IS
S
H
EE
T
M
ATC
H
LIN
E SEE U
PPER
R
IG
H T
(SEE TH
IS SH
EET)
LEGEND
Stage 1B
Stage 2B
PLASTIC DRUMS SPACED @50' APART
PLASTIC DRUMS SPACED @50' APART SEE SHEET 05 FOR DETAILS
SEE SHEET 05 FOR DETAILS
Plastic Drum
Temporary Sign
Traffic Flow, This Stage
Type III Barricade, Lighted W/Supplemental Signage
File details come from the government source that posted it. Updated .