0190-0491_PlanSet_BidIssue_3_of_4.pdf

PDF 6 MB Posted

Attached to
Fraser Industrial District S. A. D.
Solicitation number
0190-0491
Issued by
Macomb County, Flint City, Michigan

About this file

The document is a staging and traffic management plan set for the Fraser Industrial District Special Assessment District (S.A.D.) project in the City of Fraser, Michigan, prepared by Anderson, Eckstein and Westrick, Inc. The plan details a phased traffic maintenance strategy for multiple roadways including Riviera Drive, James J. Pompo Drive, and Malyn Boulevard during a comprehensive road reconstruction project. The plan is divided into multiple stages (1A, 1B, 2A, 2B) and includes detailed drawings showing traffic flow modifications, barricade placements, road closures, and traffic control signage for each construction phase.

The staging plans utilize Type III barricades, lighted supplemental signage, and plastic drums spaced at 50-foot intervals to manage traffic during construction. Each roadway segment is strategically mapped to maintain partial traffic flow while allowing construction work to progress. The drawings include specific details about traffic routing, road closure areas, and temporary signage placement, ensuring minimal disruption to local traffic while facilitating the complete removal and replacement of existing concrete pavement, integral curbs, storm drainage systems, sidewalks, and associated infrastructure improvements. The comprehensive approach demonstrates careful planning to balance construction needs with ongoing community mobility requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00

+0

+0

10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00

+0

+0

SCALE:

106 RIVERA--5/5/2025 6:09:29 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

ESR MAV MARCH 2025

###### HORIZ.

1" = X' VERT.

SHEET TITLE:

COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

106 RIVERA--5/5/2025 6:09:30 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

Know what's below.

72 hours before you dig.

Call R

51301 Schoenherr Road Shelby Township, MI 48315

586.726.1234 | aewinc.com

Engineering Strong Communities

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

C R

O

SS

R O

A D

RIVIERA DRIVE

MAINTAINING

TRAFFIC PLAN

RIVIERA DRIVE

PHASE 2

M

AT

C H

L

IN

E

+0

(S

EE

S H

EE

T

7)

C R

O

SS

R O

A D

RIVIERA DRIVE

M

AT

C H

L

IN

E

+0

(S

EE

S H

EE

T

8)

LEGEND

Stage 1A & 1B

Stage 2A & 2B

TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4

TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4

THRU TRAFFIC

ROAD CLOSED

TO

R11-4

THRU TRAFFIC

ROAD CLOSED

TO

R11-4

PLASTIC DRUMS SPACED @50' APART

PLASTIC DRUMS SPACED @50' APART

STAGE 1A

STAGE 1B

Plastic Drum

Temporary Sign

Traffic Flow, This Stage

Type III Barricade, Lighted W/Supplemental Signage

Type III Barricade, Lighted

18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00

+0

+0

25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

SCALE:

107 REVERA 1A1B--5/5/2025 6:09:31 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

MAINTAINING

TRAFFIC PLAN

RIVIERA DRIVE

PHASE 2

ESR MAV MARCH 2025

1"=30' HORIZ.

15 30 60

SHEET TITLE:

COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

107 REVERA 1A1B--5/5/2025 6:09:31 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

Know what's below.

72 hours before you dig.

Call R

51301 Schoenherr Road Shelby Township, MI 48315

586.726.1234 | aewinc.com

Engineering Strong Communities

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

RIVIERA DRIVE RIVIERA DRIVE

M A

LY

N

B O

U

LE

VA

R

D

RIVIERA DRIVE

M

AT

C H

L

IN

E

SE

E

BO

TT

O

M L

EF

T

(S

EE

T H

IS

S

H

EE

T

M

AT

C H

L

IN

E

SE

E U

PP

ER

R

IG

H T

(S

EE

T H

IS

S

H

EE

T) M

AT

C

H L

IN

E

+0

(S

EE

S

H

EE

T

6)

LEGEND

Stage 1A

Stage 2A

TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4

THRU TRAFFIC

ROAD CLOSED

TO

R11-4

PLASTIC DRUMS SPACED @50' APART

PLASTIC DRUMS SPACED @50' APARTSEE SHEET 05 FOR DETAILS

SEE SHEET 05 FOR DETAILS

SEE SHEET 05 FOR DETAILS

Plastic Drum

Temporary Sign

Traffic Flow, This Stage

Type III Barricade, Lighted

Type III Barricade, LightedSTAGE 1A & 2A

18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00

+0

+0

25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

SCALE:

108 REVERA 2A2B--5/5/2025 6:09:32 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

MAINTAINING

TRAFFIC PLAN

RIVIERA DRIVE

PHASE 2

ESR MAV MARCH 2025

1"=30' HORIZ.

15 30 60

SHEET TITLE:

COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

108 REVERA 2A2B--5/5/2025 6:09:32 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

Know what's below.

72 hours before you dig.

Call R

51301 Schoenherr Road Shelby Township, MI 48315

586.726.1234 | aewinc.com

Engineering Strong Communities

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

RIVIERA DRIVE RIVIERA DRIVE

M A

LY

N

B O

U

LE

VA

R

D

RIVIERA DRIVE

M

AT

C H

L

IN

E

SE

E

BO

TT

O

M L

EF

T

(S

EE

T H

IS

S

H

EE

T

M

AT

C H

L

IN

E

SE

E U

PP

ER

R

IG

H T

(S

EE

T H

IS

S

H

EE

T) M

AT

C

H L

IN

E

+0

(S

EE

S

H

EE

T

6)

LEGEND

Stage 1B

Stage 2B

TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4

THRU TRAFFIC

ROAD CLOSED

TO

R11-4

PLASTIC DRUMS SPACED @50' APART

PLASTIC DRUMS SPACED @50' APART

SEE SHEET 05 FOR DETAILS

Plastic Drum

Temporary Sign

Traffic Flow, This Stage

Type III Barricade, Lighted W/Supplemental Signage

STAGE 1B & 2B

+0

+0

+0

+0

10+00

11+00 12+00 13+00 14+00

+00

+0

+0

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

SCALE:

109 JAMES 1A--5/5/2025 6:09:33 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

ESR MAV MARCH 2025

###### HORIZ.

1" = X' VERT.

SHEET TITLE:

COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

109 JAMES 1A--5/5/2025 6:09:33 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

Know what's below.

72 hours before you dig.

Call R

51301 Schoenherr Road Shelby Township, MI 48315

586.726.1234 | aewinc.com

Engineering Strong Communities

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

JA

M

ES

J

P O

M

PO

D R

IV

E

D O

R

EK

A D

R

IV

E

MAINTAINING

TRAFFIC PLAN

JAMES J POMPO ROAD

PHASE 2

MATCH LINE 17+00

(SEE SHEET 111)

LEGEND

Stage 1A

TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4

THRU TRAFFIC

ROAD CLOSED

TO

R11-4

PLASTIC DRUMS SPACED @50' APART

Plastic Drum

Temporary Sign

Traffic Flow, This Stage

Type III Barricade, Lighted W/Supplemental Signage

STAGE 1A

+0

+0

+0

+0

10+00

11+00 12+00 13+00 14+00

+00

+0

+0

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

SCALE:

110 JAMES 2A 2B--5/5/2025 6:09:34 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

ESR MAV MARCH 2025

###### HORIZ.

1" = X' VERT.

SHEET TITLE:

COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

110 JAMES 2A 2B--5/5/2025 6:09:34 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

Know what's below.

72 hours before you dig.

Call R

51301 Schoenherr Road Shelby Township, MI 48315

586.726.1234 | aewinc.com

Engineering Strong Communities

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

JA

M

ES

J

P O

M

PO

D R

IV

E

D O

R

EK

A D

R

IV

E

MAINTAINING

TRAFFIC PLAN

JAMES J POMPO ROAD

PHASE 2

MATCH LINE 17+00

(SEE SHEET 112)

LEGEND

Stage 1B

Stage 2B

TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4

THRU TRAFFIC

ROAD CLOSED

TO

R11-4

PLASTIC DRUMS SPACED @50' APART

SEE SHEET 05 FOR DETAILS

Plastic Drum

Temporary Sign

Traffic Flow, This Stage

Type III Barricade, Lighted W/Supplemental Signage

17+00

18+00

19+00 20+00 21+00 22+00 23+00 24+00

43+00

44+00

45+00

25+00 26+00 27+00 28+00 29+00 30+00

31+00

32+00

33+00

12+00

13+00

14+00

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

SCALE:

111 JAMES 1A1B--5/5/2025 6:09:35 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

MAINTAINING

TRAFFIC PLAN

JAMES J POMPO DRIVE

PHASE 2

ESR MAV MARCH 2025

1"=30' HORIZ.

15 30 60

SHEET TITLE:

COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

111 JAMES 1A1B--5/5/2025 6:09:35 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

Know what's below.

72 hours before you dig.

Call R

51301 Schoenherr Road Shelby Township, MI 48315

586.726.1234 | aewinc.com

Engineering Strong Communities

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

JAMES J POMPO

DRIVE

JAMES J POMPO DRIVE

M

ALYN ROAD

M

IKE C ROAD

JAMES J POMPO DRIVE

M

AT

C H

L

IN

E

SE

E

BO

TT

O

M L

EF

T

(S

EE

T H

IS

S

H

EE

T

M

AT

C H

L

IN

E

SE

E U

PP

ER

R

IG

H T

(S

EE

T H

IS

S

H

EE

T)

M

ATCH LINE 17+00

(SEE SHEET 109)

LEGEND

Stage 1A

Stage 2A

TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4

THRU TRAFFIC

ROAD CLOSED

TO

R11-4

PLASTIC DRUMS SPACED @50' APART

PLASTIC DRUMS SPACED @50' APART

SEE SHEET 05 FOR DETAILS

SEE SHEET 05 FOR DETAILS

Plastic Drum

Temporary Sign

Traffic Flow, This Stage

Type III Barricade, Lighted

17+00

18+00

19+00 20+00 21+00 22+00 23+00 24+00

43+00

44+00

45+00

25+00 26+00 27+00 28+00 29+00 30+00

31+00

32+00

33+00

12+00

13+00

14+00

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

SCALE:

112 JAMES 2A2B--5/5/2025 6:09:37 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

MAINTAINING

TRAFFIC PLAN

JAMES J POMPO DRIVE

PHASE 2

ESR MAV MARCH 2025

1"=30' HORIZ.

15 30 60

SHEET TITLE:

COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

112 JAMES 2A2B--5/5/2025 6:09:37 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_2.DWG

Know what's below.

72 hours before you dig.

Call R

51301 Schoenherr Road Shelby Township, MI 48315

586.726.1234 | aewinc.com

Engineering Strong Communities

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

JAMES J POMPO

DRIVE

JAMES J POMPO DRIVE

M

ALYN ROAD

M

IKE C ROAD

JAMES J POMPO DRIVE

M

AT

C H

L

IN

E

SE

E

BO

TT

O

M L

EF

T

(S

EE

T H

IS

S

H

EE

T

M

AT

C H

L

IN

E

SE

E U

PP

ER

R

IG

H T

(S

EE

T H

IS

S

H

EE

T)

M

ATCH LINE 17+00

(SEE SHEET 110)

LEGEND

Stage 1B

Stage 2B

TWO (2) TYPE III BARRICADES W/ ONE (1) R11-4

THRU TRAFFIC

ROAD CLOSED

TO

R11-4

PLASTIC DRUMS SPACED @50' APART

PLASTIC DRUMS SPACED @50' APART

Plastic Drum

Temporary Sign

Traffic Flow, This Stage

Type III Barricade, Lighted W/Supplemental Signage

+0

+0

17+00

18+00

19+00

20+00

21+00

22+00 23+00

24+00

25+00

+0

0 SCALE:

113 MALYN 1A1B--5/5/2025 6:09:45 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_3.DWG

MAINTAINING

TRAFFIC PLAN

MALYN BOULEVARD

PHASE 3

ESR MAV MARCH 2025

1"=30' HORIZ.

15 30 60

SHEET TITLE:

COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

113 MALYN 1A1B--5/5/2025 6:09:45 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_3.DWG

Know what's below.

72 hours before you dig.

Call R

51301 Schoenherr Road Shelby Township, MI 48315

586.726.1234 | aewinc.com

Engineering Strong Communities

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

MALYN

BOULEVARD

C O

M M

ER

C

E R

O A

D

MALYN

BLVD.

RIVIERA DR.

M

AT

C H

L

IN

E

SE

E

BO

TT

O

M L

EF

T

(S

EE

T H

IS

S

H

EE

T

M

ATC

H

LIN

E SEE U

PPER

R

IG

H T

(SEE TH

IS SH

EET)

LEGEND

Stage 1A

Stage 2A

TWO TYPE III BARRICADES W/ ONE (1) R11-4

THRU TRAFFIC

ROAD CLOSED

TO

R11-4

PLASTIC DRUMS SPACED @50' APART

PLASTIC DRUMS SPACED @50' APART

SEE SHEET 05 FOR DETAILS

Plastic Drum

Temporary Sign

Traffic Flow, This Stage

Type III Barricade, Lighted

+0

+0

17+00

18+00

19+00

20+00

21+00

22+00 23+00

24+00

25+00

+0

SCALE:

114 MALYN 2A2B--5/5/2025 6:09:47 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_3.DWG

MAINTAINING

TRAFFIC PLAN

MALYN BOULEVARD

PHASE 3

ESR MAV MARCH 2025

1"=30' HORIZ.

15 30 60

SHEET TITLE:

COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

114 MALYN 2A2B--5/5/2025 6:09:47 AM

M:\0190\0190-0491\CAD\DRAWINGS\CONSTRUCTION\CIVIL\05_STAGING_3.DWG

Know what's below.

72 hours before you dig.

Call R

51301 Schoenherr Road Shelby Township, MI 48315

586.726.1234 | aewinc.com

Engineering Strong Communities

0190-0491

FRASER INDUSTRIAL

DISTRICT S.A.D.

CITY OF FRASER

MALYN

BOULEVARD

C O

M M

ER

C

E R

O A

D

MALYN

BLVD.

RIVIERA DR.

M

AT

C H

L

IN

E

SE

E

BO

TT

O

M L

EF

T

(S

EE

T H

IS

S

H

EE

T

M

ATC

H

LIN

E SEE U

PPER

R

IG

H T

(SEE TH

IS SH

EET)

LEGEND

Stage 1B

Stage 2B

PLASTIC DRUMS SPACED @50' APART

PLASTIC DRUMS SPACED @50' APART SEE SHEET 05 FOR DETAILS

SEE SHEET 05 FOR DETAILS

Plastic Drum

Temporary Sign

Traffic Flow, This Stage

Type III Barricade, Lighted W/Supplemental Signage

File details come from the government source that posted it. Updated .