0190-0491_Complete_SpecBook.pdf

PDF 5 MB Posted

Attached to
Fraser Industrial District S. A. D.
Solicitation number
0190-0491
Issued by
Macomb County, Flint City, Michigan

About this file

This document is a comprehensive set of contract documents for the City of Fraser's Industrial District Special Assessment District (S.A.D.) project, prepared by Anderson, Eckstein and Westrick, Inc. (AEW Project No. 0190-0491). The project involves the complete reconstruction of approximately 3 miles of roadways, including removal and replacement of existing concrete pavement with nonreinforced concrete pavement and integral curb on an aggregate base. Additionally, the project encompasses storm drainage replacement, sidewalk and sidewalk ramp reconstruction, driveway reconstruction, permanent pavement markings, and traffic signage. The project is divided into four phases, with work scheduled to be substantially completed between October 31, 2025, and September 30, 2026, and final completion by October 31, 2026. Sealed bids will be received until 10:00 a.m. on Wednesday, May 28, 2025, at the City of Fraser offices, with a mandatory pre-bid conference and site visit to be scheduled.

The contract is structured as a unit price contract with numerous line items covering various aspects of the infrastructure work. The total project budget and funding sources are not explicitly detailed in the documents. Bidders must be MDOT prequalified and provide a bid security of 5% of their maximum bid price. Liquidated damages are set at $2,000 per day for failing to meet substantial completion and final completion dates. The project will be awarded to the responsible bidder whose bid is in the best interests of the project, with the City of Fraser reserving the right to reject any or all bids. Additional requirements include providing detailed qualifications, a statement of qualifications, a list of subcontractors, and project references. The contract includes provisions for performance, payment, and maintenance bonds, as well as comprehensive insurance requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS AND CONTRACT DOCUMENTS

FOR THE

CITY OF FRASER

FRASER INDUSTRIAL DISTRICT S.A.D.

AEW PROJECT NO. 0190-0491

OWNER:

33000 GARFIELD ROAD

FRASER, MICHIGAN 48021

586.726.1234 www.aewinc.com

ISSUED FOR BIDS:

MAY 2025

ISSUED FOR CONSTRUCTION:

INDUSTRIAL PARK SAD RECONSTRUCTION

INDEX

Advertisement for Bids Page 1

Instructions to Bidders Pages 1 – 9

Supplementary Instructions to Bidders Pages 1 – 2

Bid Form Pages 1 – 10

Bid Bond Pages 1 – 2

Agreement Pages 1 – 8

MDOT Prequalification Page 1

Statement of Qualifications Pages 1 – 2

Subcontractor Listing Page 1

Project References Page 1

Bonds

Performance Bond Pages 1 – 3

Payment Bond Pages 1 – 3

Maintenance and Guarantee Bond Pages 1 – 2

General Conditions Pages 1 – 66

Supplementary Conditions Pages 1 – 6

General Requirements Pages GR1 – GR18

Special Provisions Pages 1 – 31

Supplementary Specifications

Water Main Specifications, Section 823 W1 – W11

Cleaning And Television Specifications Pages 1 – 9

Full Length Cured-In-Place Pipe Specifications (CIPP) Pages 1 – 8

A.- 1

ADVERTISEMENT FOR BIDS

RECEIPT OF BIDS

The City of Fraser will receive sealed bids until 10:00 a.m., local time on Wednesday, May

28, 2025, at the offices of the City Clerk, City of Fraser, 33000 Garfield Road, Fraser, Michigan 48026, at which time and place all bids will be publicly opened and read aloud.

DESCRIPTION OF WORK

The approximate quantities of major items of work involved in this work are as follows:

Conc Pavt with Integral Curb, Nonreinf, 9 inch 62,820 Syd

Driveway, Nonreinf Conc, 8 inch 12,835 Syd

Station Grading 151 Sta

Aggregate Base, 10 inch 66,403 Syd

Pavt, Rem 62,861 Syd

Underdrain, Subgrade, 6 inch 29,966 Ft

Driveway Maintenance, Commercial 206 Ea

Dr Structure, 48 inch dia 75 Ea

Driveway, Rem 13,348 Syd

Water Main, DI, 8 inch, Tr Det F 835 Ft

Water Main, DI, 8 inch, Tr Det G 655 Ft

Sewer, Cl IV, 12 inch, Tr Det B 1,134 Ft together with related work.

PLANS AND SPECIFICATIONS

Plans and specifications may be obtained at www.bidnetdirect.com and copies may be viewed at the offices of the City of Fraser, 33000 Garfield Road, Fraser, Michigan 48026. Bids may be rejected unless made on the forms included with the bidding documents.

BID SECURITY

A certified check, bank draft, or satisfactory bid bond, executed by the bidder and a surety company on the form provided, payable to the City of Fraser, in an amount equal to five percent (5%) of the bid amount, shall be submitted with each bid.

http://www.bidnetdirect.com/

A.- 2

WITHDRAWAL OF BIDS

No bid may be withdrawn for a period of ninety (90) calendar days after receipt of bids.

This time frame may be adjusted through mutual agreement between the Owner and the Contractor.

AWARD OF CONTRACT

The City of Fraser reserves the right to reject any or all bids and/or to waive any irregularities in bidding. The successful bidder will be required to furnish satisfactory performance, payment, maintenance and guarantee bonds and insurance certificates.

BY: August Gitschlag, City Clerk

City of Fraser

33000 Garfield Road

Fraser Michigan 48026

DATED: MAY 2025

EJCDC® C-200, Instructions to Bidders for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

INSTRUCTIONS TO BIDDERS

FOR CONSTRUCTION CONTRACTS

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Copyright © 2013:

National Society of Professional Engineers

1420 King Street, Alexandria, VA 22314-2794

(703) 684-2882 www.nspe.org

American Council of Engineering Companies

1015 15th Street N.W., Washington, DC 20005

(202) 347-7474 www.acec.org

American Society of Civil Engineers

1801 Alexander Bell Drive, Reston, VA 20191-4400

(800) 548-2723 www.asce.org

The copyright for this EJCDC document is owned jointly by the three sponsoring organizations listed above. The National Society of Professional Engineers is the Copyright Administrator for the EJCDC documents; please direct all inquiries regarding EJCDC copyrights to NSPE.

NOTE: EJCDC publications may be purchased at www.ejcdc.org, or from any of the sponsoring organizations above.

http://www.nspe.org/ http://www.acec.org/ http://www.asce.org/ http://www.ejcdc.org/

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i

INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

Page ARTICLE 1 – Defined Terms

ARTICLE 2 – Copies of Bidding Documents

ARTICLE 3 – Qualifications of Bidders

ARTICLE 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

ARTICLE 5 – Bidder’s Representations

ARTICLE 6 – Pre-Bid Conference

ARTICLE 7 – Interpretations and Addenda

ARTICLE 8 – Bid Security

ARTICLE 9 – Contract Times

ARTICLE 10 – Liquidated Damages

ARTICLE 11 – Substitute and “Or-Equal” Items

ARTICLE 12 – Subcontractors, Suppliers, and Others

ARTICLE 13 – Preparation of Bid

ARTICLE 14 – Basis of Bid

ARTICLE 15 – Submittal of Bid

ARTICLE 16 – Modification and Withdrawal of Bid

ARTICLE 17 – Opening of Bids

ARTICLE 18 – Bids to Remain Subject to Acceptance

ARTICLE 19 – Evaluation of Bids and Award of Contract

ARTICLE 20 – Bonds and Insurance

ARTICLE 21 – Signing of Agreement

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1

ARTICLE 1 – DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office – The office from which the Bidding Documents are to be issued.

ARTICLE 2 – COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid.

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five (5) days of Owner’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:

A. An itemized list of the Bidder’s equipment available for use on the proposed Contract.

B. A list of Bidder’s key personnel who would be assigned to the Project, including their experience. Additionally, identify the likely project manager and superintendent responsible for making project decisions.

C. A listing of the major parts of the work which are proposed to be sub-let along with reference information for each subcontractor.

D. A proposed construction schedule based upon starting construction within ten (10) days of receiving the Notice to Proceed.

E. Such additional information that will enable the Owner to determine whether or not the Bidder is adequately prepared to fulfill the obligations of the Contract.

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

4.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify:

a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.

b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. technical data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify technical data, the default definition of technical data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.

C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3

4.03 Site Visit and Testing by Bidders

A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.

B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.

D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.04 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.

4.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

5.01 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4 drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;

E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;

F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;

H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;

and

J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 6 – PRE-BID CONFERENCE

6.01 A pre-Bid conference, if any, will be held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Attendance may be mandatory as stated in the Invitation or Advertisement to Bid. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda, mailed, delivered, sent via facsimile, or transmitted electronically, to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5

7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.

ARTICLE 8 – BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five (5%) percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within ten (10) days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and exercise its rights under the Bid Bond. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or the bid acceptance period, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.

ARTICLE 9 – CONTRACT TIMES

9.01 The number of days within which, or the dates by which, milestones, if any, are to be achieved and the Work is to be substantially completed and ready for final payment are set forth in the Agreement.

ARTICLE 10 – LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, if any, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.

11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6

ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.

12.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for various portions of the Work.

If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, without an increase or Bid Price.

12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.

ARTICLE 13 – PREPARATION OF BID

13.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.

13.03 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.

13.04 A Bid by an individual shall show the Bidder’s name and official address.

13.05 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7

13.06 All names shall be printed in ink below the signatures.

13.07 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

13.08 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.

13.09 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.

ARTICLE 14 – BASIS OF BID

14.01 Lump Sum

A. Bidders shall submit a Bid on a lump sum basis as set forth in the Bid Form.

14.02 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

ARTICLE 15 – SUBMITTAL OF BID

15.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 7 of the Bid Form.

15.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to the Owner’s office as identified in the Bid Form.

15.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8

ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.

16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.

ARTICLE 17 – OPENING OF BIDS

17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder whose Bid is in the best interests of the Project.

19.03 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

C. Bid prices will be compared after adjusting for differences in time of Substantial Completion (total number of calendar days to substantially complete the Work) designated by Bidders.

The adjusting amount will be determined at the rate set forth in the Agreement for liquidated

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9 damages for failing to achieve Substantial Completion, or such other amount that Owner has designated in the Bid Form.

1. The method for calculating the lowest bid for comparison will be the summation of the Bid price shown in the Bid Form plus the product of the Bidder-specified time of Substantial Completion (in Calendar Days) times the rate for liquidated damages (in dollars per day).

19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 20 – BONDS AND INSURANCE

20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.

ARTICLE 21 – SIGNING OF AGREEMENT

21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Engineer in accordance with the instructions provided in the Notice of Award. Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

R:\General\Admin\BrendaGail\Specs\Specs Most Frequently Used\Instructions To Bidders_230309.docx

Supplementary Instructions to Bidders i

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

ARTICLE 3 – QUALIFICATION OF BIDDERS

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

ARTICLE 15 – SUBMITTAL OF BID

ARTICLE 19 – EVALUATION OF BIDS AND AWARDS OF CONTRACT

Supplementary Instructions to Bidders

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

These Supplementary Instructions to Bidders amend or supplement the Instructions to Bidders (No. C-200, 2002 Edition) as indicated below. All provisions which are not so amended or supplemented remain in full force and effect.

The terms used in these Supplementary Instructions to Bidders have the meanings stated in the General Conditions.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

I-3.01 Add the following language after I-3.01E:

Prequalification

Bidder must have at least five (5) years’ experience in the Scope of Work described here in these Specifications in order to be considered a qualified Bidder.

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

I-7.01 Amend the third sentence of Paragraph 7.01 to read as follows:

Questions received less than five days prior to the date for opening of bids may not be answered.

ARTICLE 15 – SUBMITTAL OF BID

I-15.01 Amend the last sentence to read as follows:

The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the following data:

A. MDOT Prequalification B. Statement of Qualifications C. Project References D. Subcontractor Listing

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

I-19.06 Add the following language at the end of I-19.05.

If, at the time that this contract is to be awarded, the selected bid exceeds the amount of funds available to finance the contract, the Owner reserves the right to delete portions of the project to produce a new amount which is within the limit of available funds.

EJCDC® C-410, Bid Form for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i

BID FORM

BID SUBMITTED BY: ___________________________

Company Name

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page ii

Page

Article 1 – Bid Recipient

Article 2 – Bidder’s Acknowledgements

Article 3 – Bidder’s Representations

Article 4 – Bidder’s Certification

Article 5 – Basis of Bid

Article 6 – Time of Completion

Article 7 – Attachments to this Bid

Article 8 – Defined Terms

Article 9 – Bid Submittal

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1

ARTICLE 1 – BID RECIPIENT

1.01 This Bid is submitted to:

August Gitschlag, City Clerk City of Fraser 33000 Garfield Road Fraser, Michigan 48026

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

ARTICLE 3 – BIDDER’S REPRESENTATIONS

3.01 In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:

Addendum No. Addendum, Date

B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site, if any, and all drawings of physical conditions relating to existing surface or subsurface structures at the Site, if any, that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2

E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.

F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder.

I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.

J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

K. Bidder is aware that the Owner’s decision to proceed with the Project is subject to Owner’s determination that all legal, financial and grant approvals, conditions and requirements have been received or met and the funding necessary to complete the project is in hand, and that if all of the foregoing has not been received, the Owner may elect not to proceed with the project in which case no bidder shall have a claim of any kind in contract, tort, equity or otherwise, against the Owner.

L. Bidders acknowledge that Owner retains the unrestricted right not to proceed with the project and to reject all Bids received. In either case, Owner shall not be liable to any Bidder under any theory including contract, tort, equity or otherwise.

M. Bidder acknowledges that the unexpected presence and location of existing underground utilities and resulting conflicts with such utilities are ordinarily encountered and generally recognized as inherent in subsurface sewer and appurtenant work in areas that have been previously developed.

ARTICLE 4 – BIDDER’S CERTIFICATION

4.01 Bidder certifies that:

A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3

B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and

D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:

1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;

2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;

3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and

4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4

ARTICLE 5 – BASIS OF BID

5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

CITY OF FRASER

FRASER INDUSTRIAL DISTRICT S.A.D.

AEW PROJECT NO. 0190-0491

Item No. Description

Estimated Quantity Unit Bid Unit Price Bid Price

1. _Reimbursed Permit Fees 10,000 Dlr

2. Mobilization, Max1130000 1 LS

3. Dr Structure, Rem 68 Ea

4. Sewer, Rem, Less than 24 inch 1,697 Ft

5. Sewer, Rem, 24 inch to 48 inch 50 Ft

6. Curb, Rem 196 Ft

7. Pavt, Rem 62,861 Syd

8. Sidewalk, Rem 191 Syd

9. Exploratory Investigation, Vertical 100 Ft

10. _Patio Blocks 28 Sft

11. _Driveway, Rem 13,348 Syd

12. Subgrade Undercutting, Type IV 1,135 Cyd

13. _Station Grading 151 Sta

14. Erosion Control, Inlet Protection, Fabric Drop 77 Ea

15. Project Cleanup 1 LS

16. Aggregate Base, 10 inch 66,403 Syd

17. Maintenance Gravel 4,000 Ton

18. Driveway Maintenance, Commercial 206 Ea

19. Intersection Maintenance 5 Ea

20. Geotextile, Stabilization 66,403 Syd

21. Sewer, Cl IV, 12 inch, Tr Det B 1,134 Ft

22. Sewer, Cl IV, 15 inch, Tr Det B 701 Ft

23. Sewer, Cl IV, 18 inch, Tr Det B 198 Ft

24. Sewer, Cl IV, 24 inch, Tr Det B 16 Ft

25. Sewer, Cl IV, 30 inch, Tr Det B 26 Ft

26. Sewer, Cl IV, 36 inch, Tr Det B 6 Ft

27. Sewer Tap, 12 inch 1 Ea

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5

CITY OF FRASER

FRASER INDUSTRIAL DISTRICT S.A.D.

AEW PROJECT NO. 0190-0491

Item No. Description

28. Video Taping Sewer and Culv Pipe 2,450 Ft

29. _Sewer, Cl IV, 21 inch, Tr Det B 27 Ft

30. _Sewer, Cl IV, 42 inch, Tr Det B 6 Ft

31. _Sewer, Cl IV, 48 inch, Tr Det B 3 Ft

32. _Sewer, Pre-Construction, Clean and

CCTV, 08 inch 100 Ft

33. _Sewer, Pre-Construction, Clean and

CCTV, 10 inch 100 Ft

34. _Sewer, Pre-Construction, Clean and

CCTV, 12 inch 1,350 Ft

35. _Sewer, Pre-Construction, Clean and

CCTV, 15 inch 1,250 Ft

36. _Sewer, Pre-Construction, Clean and

CCTV, 18 inch 1,200 Ft

37. _Sewer, Pre-Construction, Clean and

CCTV, 24 inch 2,200 Ft

38. _Sewer, Pre-Construction, Clean and

CCTV, 27 inch 675 Ft

39. _Sewer, Pre-Construction, Clean and

CCTV, 30 inch 2,500 Ft

40. _Sewer, Pre-Construction, Clean and

CCTV, 36 inch 850 Ft

41. _Sewer, Pre-Construction, Clean and

CCTV, 42 inch 2,500 Ft

42. _Sewer, Pre-Construction, Clean and

CCTV, 48 inch 550 Ft

43. _Sewer, PVC, 6 inch, Tr Det A 16 Ft

44. _Sewer, PVC, 6 inch, Tr Det B 12 Ft

45. _Storm Sewer, CIPP Lining, 36 inch 316 Ft

46. Cut Service Lead Protrusion 50 Ea

47. Remove Mineral Deposit 50 Ea

48. Deliverables 1 Ls

49. Dr Structure Cover, Adj, Case 1 3 Ea

50. Dr Structure Cover, Adj, Case 2 10 Ea

51. Dr Structure, 48 inch dia 75 Ea

52. Dr Structure, 72 inch dia 1 Ea

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6

CITY OF FRASER

FRASER INDUSTRIAL DISTRICT S.A.D.

AEW PROJECT NO. 0190-0491

Item No. Description

53. Dr Structure, Tap, 12 inch 12 Ea

54. Dr Structure, Tap, 15 inch 12 Ea

55. Dr Structure, Tap, 18 inch 3 Ea

56. Dr Structure, Tap, 24 inch 1 Ea

57. _Catch Basin Cover, Fraser 75 Ea

58. _Dr Structure, Adj, Case 1 18 Ea

59. _Dr Structure, Adj, Case 2 5 Ea

60. _External Structure Wrap, 18 inch 85 Ea

61. _Sanitary Manhole Cover, Adj, Case 1 17 Ea

62. _Sanitary Manhole Cover, Adj, Case 2 5 Ea

63. _Sanitary Manhole Cover, Fraser 22 Ea

64. _Sanitary Manhole, 48 inch dia 1 Ea

65. _Storm Manhole Cover, Fraser 5 Ea

66. _Storm Manhole Cover, MCPWO 1 Ea

67. Underdrain, Subgrade, 6 inch 29,966 Ft

68. Conc Pavt, Misc, Nonreinf, 7 inch 30 Syd

69. Conc Pavt with Integral Curb, Nonreinf, 9 inch 62,820 Syd

70. Joint, Expansion, E2 700 Ft

71. Joint, Plane-of-Weakness, W 54,000 Ft

72. Pavt Gapping 5,000 Ft

73. Joint, Plane-of-Weakness, W, Intersection 1,500 Ft

74. Joint, Expansion, Erg 200 Ft

75. Driveway, Nonreinf Conc, 8 inch 12,835 Syd

76. Detectable Warning Surface 45 Ft

77. Curb Ramp Opening, Conc 60 Ft

78. Sidewalk, Conc, 4 inch 1,384 Sft

79. _Curb Ramp, Conc, 8 inch 390 Sft

80. Post, Mailbox 84 Ea

81. Guardrail, Type A, 72 inch Post 36 Ft

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7

CITY OF FRASER

FRASER INDUSTRIAL DISTRICT S.A.D.

AEW PROJECT NO. 0190-0491

Item No. Description

82. Post, Steel, 3 pound 560 Ft

83. Sign, Type III, Rem 39 Ea

84. Sign, Type IIIA 261 Sft

85. Sign, Type IIIB 41 Sft

86. Barricade, Type III, High Intensity, Double Sided, Lighted, Furn 20 Ea

87. Barricade, Type III, High Intensity, Double Sided, Lighted, Oper 20 Ea

88. Pedestrian Type II Barricade, Temp 4 Ea

89. Channelizing Device, 42 inch, Fluorescent, Furn 100 Ea

90. Channelizing Device, 42 inch, Fluorescent, Oper 100 Ea

91. Lighted Arrow, Type C, Furn 2 Ea

92. Lighted Arrow, Type C, Oper 2 Ea

93. Minor Traf Devices 1 LS

94. Part Width Intersection Construction 5 Ea

95. Plastic Drum, Fluorescent, Furn 400 Ea

96. Plastic Drum, Fluorescent, Oper 400 Ea

97. Sign, Type B, Temp, Prismatic, Furn 1,000 Sft

98. Sign, Type B, Temp, Prismatic, Oper 1,000 Sft

99. Sign, Type B, Temp, Prismatic, Spec, Furn 50 Sft

100. Sign, Type B, Temp, Prismatic, Spec, Oper 50 Sft

101. Traf Regulator Control 1 LS

102. _Irrigation Pipe 10,000 Ft

103. _Sprinkler Head 1,000 Ea

104. _Fire Hydrant Assembly 5 Ea

105. Gate Valve, 8 inch 3 Ea

106. Gate Valve, 12 inch 2 Ea

107. Gate Well, Rem 2 Ea

108. Hydrant, Rem 3 Ea

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8

CITY OF FRASER

FRASER INDUSTRIAL DISTRICT S.A.D.

AEW PROJECT NO. 0190-0491

Item No. Description

109. Water Main, DI, 8 inch, Tr Det F 835 Ft

110. Water Main, DI, 8 inch, Tr Det G 655 Ft

111. Water Main, DI, 12 inch, Tr Det F 67 Ft

112. Water Main, DI, 12 inch, Tr Det G 52 Ft

113. Water Serv 9 Ea

114. Water Serv, Long 7 Ea

115. Gate Well, 60 inch dia 5 Ea

116. Water Main Conflict, 8 inch 1 Ea

117. _Water Main, PVC, 8 inch, Pipe Burst 368 Ft

118. _Gate Well Cover, Adj, Case 1 9 Ea

119. _Gate Well Cover, Adj, Case 2 3 Ea

120. _Gate Well Cover, Fraser 15 Ea

121. _Water Main Connection, 8 inch 4 Ea

122.