Attachment 2 - AS-NG Pricing Workbook 05262026.xlsx
XLSX spreadsheet 42 KB Posted
- Attached to
- FDIC Acquisition System Next Generation (AS-NG)
- Solicitation number
- 0167
- Issued by
-
Federal Deposit Insurance Corporation
About this file
This is a pricing workbook template for the FDIC Acquisition System Next Generation (AS-NG) contract, designed to capture Fixed-Price (FFP) Agile Team pricing across multiple contract periods. The workbook is pre-populated with formulas to facilitate pricing submission by offerors and consists of four primary tabs: FFP Agile Team Pricing, FFP Agile Team Roles, Detailed Charges, and Pricing Summary.
Offerors must enter biweekly charges for Agile Team sizes ranging from 1 to 10 Full-Time Equivalents (FTEs) across a Base Period and three Option Periods. The FFP Agile Team Roles tab requires offerors to specify anticipated roles and FTE allocations for each team size, with total FTEs matching the requested team size. The Detailed Charges tab allows offerors to propose specific team sizes for each two-week sprint and Contract Line Item Number (CLIN), spanning 26 sprints in the Base Period (October 2026 through September 2027), 26 sprints in Option Period 1 (September 2027 through September 2028), and 32 sprints in Option Period 2 (September 2028 through December 2029). Four CLINs are included: Discovery, Contract Writing, Contract File, and Early Acquisition Planning. The workbook automatically calculates charges by referencing the FFP Agile Team pricing table, and all formulas and data are unlocked to allow offerors to propose alternative pricing structures. The Pricing Summary tab provides aggregate totals by CLIN and period, with the total proposed price displayed in a single cell. All proposed pricing must be rounded to the nearest cent and free of errors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - AS-NG Pricing Workbook 06252026.xlsx | XLSX spreadsheet | |
| Attachment 1 AS-NG Q and A Responses 06172026.xlsx | XLSX spreadsheet | |
| CORHQ-26-R-0167-Amendment 1 - AS NG Solicitation 6172026.pdf | ||
| Attachment 1 AS-NG Q and A Responses 06172026.xlsx | XLSX spreadsheet | |
| Attachment 2 - AS-NG Pricing Workbook.xlsx | XLSX spreadsheet | |
| Attachment 1 - AS NG Q and A Template.xlsx | XLSX spreadsheet | |
| CORHQ-26-R-0167 -- AS NG Soliciation 05222026.pdf | ||
| Attachement 3 - Past Performance Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| 1. General Instructions |
| This Excel file is pre-populated with formulas to expedite pricing entry on the part of the Offeror. Offerors shall enter data in the light-blue shaded cells. |
| The formulas and tabs, however, are not protected and may be altered by Offerors wishing to propose alternative pricing. |
| Offerors shall ensure any updates made to the pricing workbook are free of errors and that proposed pricing is rounded to the nearest cent. |
| 3. "FFP Agile Team Pricing" Tab |
| This tab requests charges for various Agile Team sizes that can be ordered under this contract. |
| Offeror shall enter biweekly charges per Team Size (1-10 Full-Time Equivalents) across the Base and Option Periods. |
| 4. "FFP Agile Team Roles" Tab |
| This tab requests Offeror's anticipated roles per Agile Team size. Not all roles must be full time, however, the total FTE count must sum to the requested Agile Team size. |
| 5. "Detailed Charges" Tab |
| This tab requests Offeror's proposed team sizes for each Sprint and CLIN. While the FDIC has pre-populated team sizes, Offerors may change those team sizes and sprints to fit their proposed solutions. |
| Charges will be automatically calculated by referencing the corresponding FFP Agile Team pricing entered on the first tab. |
| 6. "Pricing Summary" Tab |
| No Offeror input required. This tab displays the summary charges for each CLIN and period. |
| The total proposed price is shown in Cell G7. |
FFP Agile Team Pricing FFP Agile Team Pricing
| FTE Count | Biweekly Charges | |||
| Base Period | Option Period 1 | Option Period 2 | Option Period 3 | |
| 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
FFP Agile Team Roles
| Anticipated Roles per Agile Team Size | |||||||||
| 1 FTE Team | 2 FTE Team | 3 FTE Team | 4 FTE Team | 5 FTE Team | |||||
| Role | FTE | Role | FTE | Role | FTE | Role | FTE | Role | FTE |
| e.g. Developer | 0.75 | ||||||||
| e.g. Architect | 0.25 |
| Total FTEs | 1.00 | Total FTEs | 0.0 | Total FTEs | 0.0 | Total FTEs | 0.0 | Total FTEs | 0.0 |
| 6 FTE Team | 7 FTE Team | 8 FTE Team | 9 FTE Team | 10 FTE Team | |||||
| Role | FTE | Role | FTE | Role | FTE | Role | FTE | Role | FTE |
Total FTEs 0.0 Total FTEs 0.0 Total FTEs 0.0 Total FTEs 0.0 Total FTEs 0.0
Detailed Charges Proposed Team Sizes Per Sprint and CLIN
| Period | Start | End | Sprint # | CLIN 1 - Discovery | CLIN 2 - Contract Writing | CLIN 3 - Contract File | CLIN 4 - Early Acquisition Planning | Total Charges | ||||||||
| Team Size | Concat | Charges | Team Size | Concat | Charges | Team Size | Concat | Charges | Team Size | Concat | Charges | |||||
| Base | 10/1/26 | 10/14/26 | Sprint 1 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 10/15/26 | 10/28/26 | Sprint 2 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 10/29/26 | 11/11/26 | Sprint 3 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 11/12/26 | 11/25/26 | Sprint 4 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 11/26/26 | 12/9/26 | Sprint 5 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 12/10/26 | 12/23/26 | Sprint 6 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 12/24/26 | 1/6/27 | Sprint 7 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 1/7/27 | 1/20/27 | Sprint 8 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 1/21/27 | 2/3/27 | Sprint 9 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 2/4/27 | 2/17/27 | Sprint 10 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 2/18/27 | 3/3/27 | Sprint 11 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 3/4/27 | 3/17/27 | Sprint 12 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 3/18/27 | 3/31/27 | Sprint 13 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 4/1/27 | 4/14/27 | Sprint 14 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 4/15/27 | 4/28/27 | Sprint 15 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 4/29/27 | 5/12/27 | Sprint 16 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 5/13/27 | 5/26/27 | Sprint 17 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 5/27/27 | 6/9/27 | Sprint 18 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 6/10/27 | 6/23/27 | Sprint 19 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 6/24/27 | 7/7/27 | Sprint 20 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 7/8/27 | 7/21/27 | Sprint 21 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 7/22/27 | 8/4/27 | Sprint 22 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 8/5/27 | 8/18/27 | Sprint 23 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 8/19/27 | 9/1/27 | Sprint 24 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 9/2/27 | 9/15/27 | Sprint 25 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| Base | 9/16/27 | 9/29/27 | Sprint 26 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | $ - 0 | ||||
| OP1 | 9/30/27 | 10/13/27 | Sprint 27 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 10/14/27 | 10/27/27 | Sprint 28 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 10/28/27 | 11/10/27 | Sprint 29 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 11/11/27 | 11/24/27 | Sprint 30 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 11/25/27 | 12/8/27 | Sprint 31 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 12/9/27 | 12/22/27 | Sprint 32 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 12/23/27 | 1/5/28 | Sprint 33 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 1/6/28 | 1/19/28 | Sprint 34 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 1/20/28 | 2/2/28 | Sprint 35 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 2/3/28 | 2/16/28 | Sprint 36 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 2/17/28 | 3/1/28 | Sprint 37 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 3/2/28 | 3/15/28 | Sprint 38 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 3/16/28 | 3/29/28 | Sprint 39 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 3/30/28 | 4/12/28 | Sprint 40 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 4/13/28 | 4/26/28 | Sprint 41 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 4/27/28 | 5/10/28 | Sprint 42 | 1 | OP11 | $ 2,000.00 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ 2,000.00 | |||
| OP1 | 5/11/28 | 5/24/28 | Sprint 43 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 5/25/28 | 6/7/28 | Sprint 44 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 6/8/28 | 6/21/28 | Sprint 45 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 6/22/28 | 7/5/28 | Sprint 46 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 7/6/28 | 7/19/28 | Sprint 47 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 7/20/28 | 8/2/28 | Sprint 48 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 8/3/28 | 8/16/28 | Sprint 49 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 8/17/28 | 8/30/28 | Sprint 50 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 8/31/28 | 9/13/28 | Sprint 51 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP1 | 9/14/28 | 9/27/28 | Sprint 52 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | OP1 | $ - 0 | $ - 0 | ||||
| OP2 | 9/28/28 | 10/11/28 | Sprint 53 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 10/12/28 | 10/25/28 | Sprint 54 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 10/26/28 | 11/8/28 | Sprint 55 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 11/9/28 | 11/22/28 | Sprint 56 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 11/23/28 | 12/6/28 | Sprint 57 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 12/7/28 | 12/20/28 | Sprint 58 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 12/21/28 | 1/3/29 | Sprint 59 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 1/4/29 | 1/17/29 | Sprint 60 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 1/18/29 | 1/31/29 | Sprint 61 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 2/1/29 | 2/14/29 | Sprint 62 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 2/15/29 | 2/28/29 | Sprint 63 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 3/1/29 | 3/14/29 | Sprint 64 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 3/15/29 | 3/28/29 | Sprint 65 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 3/29/29 | 4/11/29 | Sprint 66 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 4/12/29 | 4/25/29 | Sprint 67 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 4/26/29 | 5/9/29 | Sprint 68 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 5/10/29 | 5/23/29 | Sprint 69 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 5/24/29 | 6/6/29 | Sprint 70 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 6/7/29 | 6/20/29 | Sprint 71 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 6/21/29 | 7/4/29 | Sprint 72 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 7/5/29 | 7/18/29 | Sprint 73 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 7/19/29 | 8/1/29 | Sprint 74 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 8/2/29 | 8/15/29 | Sprint 75 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 8/16/29 | 8/29/29 | Sprint 76 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 8/30/29 | 9/12/29 | Sprint 77 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 9/13/29 | 9/26/29 | Sprint 78 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 9/27/29 | 10/10/29 | Sprint 79 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 10/11/29 | 10/24/29 | Sprint 80 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 10/25/29 | 11/7/29 | Sprint 81 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 11/8/29 | 11/21/29 | Sprint 82 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 11/22/29 | 12/5/29 | Sprint 83 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 | ||||
| OP2 | 12/6/29 | 12/19/29 | Sprint 84 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | OP2 | $ - 0 | $ - 0 |
Summary
| AS-NG Services Summary Pricing | |||||
| Period | CLIN 1 | CLIN 2 | CLIN 3 | CLIN 4 | Period Total |
| Base Period | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OP1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OP2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLIN Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Drops
| FTEs | ||
| 1 | Base1 | $ - 0 |
| 2 | Base2 | $ - 0 |
| 3 | Base3 | $ - 0 |
| 4 | Base4 | $ - 0 |
| 5 | Base5 | $ - 0 |
| 6 | Base6 | $ - 0 |
| 7 | Base7 | $ - 0 |
| 8 | Base8 | $ - 0 |
| 9 | Base9 | $ - 0 |
| 10 | Base10 | $ - 0 |
| OP11 | $ - 0 | |
| OP12 | $ - 0 | |
| OP13 | $ - 0 | |
| OP14 | $ - 0 | |
| OP15 | $ - 0 | |
| OP16 | $ - 0 | |
| OP17 | $ - 0 | |
| OP18 | $ - 0 | |
| OP19 | $ - 0 | |
| OP110 | $ - 0 | |
| OP21 | $ - 0 | |
| OP22 | $ - 0 | |
| OP23 | $ - 0 | |
| OP24 | $ - 0 | |
| OP25 | $ - 0 | |
| OP26 | $ - 0 | |
| OP27 | $ - 0 | |
| OP28 | $ - 0 | |
| OP29 | $ - 0 | |
| OP210 | $ - 0 |
File details come from the government source that posted it. Updated .