013323 Shop Drawings Product Data and Samples.pdf

PDF 190 KB Posted

Attached to
Z2DA--CFM - Rebalance HVAC System Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document contains specifications for shop drawings, product data, and sample submittals for a construction project. It defines submittal requirements and procedures, including definitions for various types of submittals such as shop drawings, product data, test reports, and operation and maintenance documentation. It requires submittals to be scheduled and approved prior to acquiring materials or equipment to avoid project delays. Approval of submittals by the Department of Veterans Affairs establishes that the general method, materials, and details are satisfactory but does not verify the absence of errors, for which the contractor is responsible.

The related federal contract opportunity is a solicitation by the Department of Veterans Affairs Veterans Health Administration to rebalance the HVAC system at a Veterans Integrated Service Network facility. The solicitation includes ninety-one attachments providing additional specification details.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--CFM - Rebalance HVAC System, newest first.
File Type Posted
OUT L08.pdf PDF
S02-EXHIBIT A PERFORMANCE RELEVANCY SURVEY v2.pdf PDF
PANAM 104.pdf PDF
03503-6EP103-M3.pdf PDF
OUT L06.pdf PDF
OUT L04.pdf PDF
OUT L03.pdf PDF
S02-EXHIBIT E SURETY FORM.pdf PDF
P15-M-2 DNT Building Existing AHU sequence.pdf PDF
AMS Research 348-8MH609.pdf PDF
P14-M-4 OP Building Existing AHU sequence.pdf PDF
P15-M-5 OP Building Existing DOAS sequence.pdf PDF
OUT L02.pdf PDF
VAV Research 352-8MH613.pdf PDF
RESEARCH 5 dixie penthouse.pdf PDF
INP L03.pdf PDF
DNT L02i F-G.pdf PDF
VAV DNT 02303-2MH628.pdf PDF
P12-AMS CEP 115-7MH608.pdf PDF
S02-XHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE v2.pdf PDF
VAV DNT 02305-2MH630.pdf PDF
DNT L05 G.pdf PDF
RESEARCH 4th mech plan.pdf PDF
CEP L03.pdf PDF
P12-000110 Table of Contents 4-7-20.pdf PDF
AMS TLR 03470-6MH604.pdf PDF
ICRA ILSM for CFM - Rebalance HVAC System.xlsx XLSX spreadsheet
013526 Safety Requirements.pdf PDF
VAV DNT 02302-2MH627.pdf PDF
PANAM 101.pdf PDF
DNT L06 D.pdf PDF
P12-230593 Testing Adjusting and Balancing for HVAC 4-7-20.pdf PDF
DNT L01i F-G.pdf PDF
VAV Research 353-8MH614.pdf PDF
AMS DNT 02288-2MH613.pdf PDF
014219 Reference Standards.pdf PDF
RESEARCH 3rd mech plan.pdf PDF
AMS DNT 02289-2MH614.pdf PDF
PANAM 102.pdf PDF
INP L04.pdf PDF
S05- AMENDMENT- 0001.pdf PDF
S02-EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT v2.pdf PDF
CEP L02.pdf PDF
DNT L02i D-E.pdf PDF
AMS IP 01414-1MH604.pdf PDF
P12-VAV PANAM 0252-9MH610.pdf PDF
INP L05.pdf PDF
VAV CON -00MH602.pdf PDF
CEP L01.pdf PDF
382-8EL105-P.pdf PDF
Show all 50

Z2DA--CFM - Rebalance HVAC System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05-01-17

01 33 23 - 1

SECTION 01 33 23

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

PART 1 – GENERAL

1.1 DESCRIPTION

A. This specification defines the general requirements and procedures for submittals. A submittal is information submitted for VA review to establish compliance with the contract documents.

B. Detailed submittal requirements are found in the technical sections of the contract specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective technical specifications at no additional cost to the government.

C. VA approval of a submittal does not relieve the Contractor of the responsibility for any error which may exist. The Contractor is responsible for fully complying with all contract requirements and the satisfactory construction of all work, including the need to check, confirm, and coordinate the work of all subcontractors for the project.

Non-compliant material incorporated in the work will be removed and replaced at the Contractor’s expense.

1.2 DEFINITIONS

A. Shop Drawings: Drawings, diagrams, and schedules specifically prepared to illustrate some portion of the work. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be integrated and coordinated.

B. Product Data: Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions, and brochures, which describe and illustrate size, physical appearance, and other characteristics of materials, systems, or equipment for some portion of the work.

C. Test Reports: Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work. Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

D. Manufacturer's Instructions: Pre-printed material describing installation of a product, system, or material, including special notices and MSDS concerning impedances, hazards, and safety precautions.

E. Manufacturer's Field Reports: Documentation of the testing and verification actions taken by manufacturer's representative at the job

05-01-17

01 33 23 - 2 site on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must indicate whether the material, product, or system has passed or failed the test.

F. Operation and Maintenance Data: Manufacturer data that is required to operate, maintain, troubleshoot, and repair equipment, including manufacturer's help, parts list, and product line documentation. This data shall be incorporated in an operations and maintenance manual.

G. Closeout Submittals: Documentation necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a phase of construction on a multi-phase contract.

1.3 SUBMITTAL SCHEDULING

A. Submittals are to be scheduled, submitted, reviewed, and approved prior to the acquisition of the material or equipment.

B. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow time for potential resubmittal.

C. No delay costs or time extensions will be allowed for time lost in late submittals or resubmittals.

D. All submittals are required to be approved prior to the start of the specified work activity.

1.4 OPERATION AND MAINTENANCE DATA

A. Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.

1.5 APPROVED SUBMITTALS

A. The VA approval of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing, and other information are satisfactory.

- - - E N D - - -