This document is an HVAC air terminal unit and fan coil unit schedule for a VA medical center renovation project. It provides specifications for 91 single duct air terminal units to be installed on various floors of the building, including required sizes, maximum and minimum airflow capacities, water flow rates, and control types. It also schedules 4 fan coil units for the basement level and specifies control types for computer room air conditioners and additional fan coil units on floors 1 through 6. Notes provide references to other drawings for schedule capacities and sound attenuator requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--CFM - Rebalance HVAC System, newest first.
File Type Posted
VAV DNT 02303-2MH628.pdf PDF
P12-AMS CEP 115-7MH608.pdf PDF
S02-XHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE v2.pdf PDF
VAV DNT 02305-2MH630.pdf PDF
DNT L05 G.pdf PDF
RESEARCH 4th mech plan.pdf PDF
CEP L03.pdf PDF
P12-000110 Table of Contents 4-7-20.pdf PDF
AMS TLR 03470-6MH604.pdf PDF
ICRA ILSM for CFM - Rebalance HVAC System.xlsx XLSX spreadsheet
013526 Safety Requirements.pdf PDF
VAV DNT 02302-2MH627.pdf PDF
PANAM 101.pdf PDF
DNT L06 D.pdf PDF
P12-230593 Testing Adjusting and Balancing for HVAC 4-7-20.pdf PDF
DNT L01i F-G.pdf PDF
VAV Research 353-8MH614.pdf PDF
AMS DNT 02288-2MH613.pdf PDF
014219 Reference Standards.pdf PDF
RESEARCH 3rd mech plan.pdf PDF
AMS DNT 02289-2MH614.pdf PDF
PANAM 102.pdf PDF
INP L04.pdf PDF
S05- AMENDMENT- 0001.pdf PDF
S02-EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT v2.pdf PDF
CEP L02.pdf PDF
DNT L02i D-E.pdf PDF
AMS IP 01414-1MH604.pdf PDF
INP L05.pdf PDF
VAV CON -00MH602.pdf PDF
CEP L01.pdf PDF
382-8EL105-P.pdf PDF
VAV Research 351-8MH612.pdf PDF
AMS Research 340-8MH601.pdf PDF
RESEARCH 3 5 mech plan.pdf PDF
OUT L08.pdf PDF
S02-EXHIBIT A PERFORMANCE RELEVANCY SURVEY v2.pdf PDF
PANAM 104.pdf PDF
03503-6EP103-M3.pdf PDF
OUT L06.pdf PDF
OUT L04.pdf PDF
OUT L03.pdf PDF
S02-EXHIBIT E SURETY FORM.pdf PDF
P15-M-2 DNT Building Existing AHU sequence.pdf PDF
AMS Research 348-8MH609.pdf PDF
P14-M-4 OP Building Existing AHU sequence.pdf PDF
P15-M-5 OP Building Existing DOAS sequence.pdf PDF
OUT L02.pdf PDF
VAV Research 352-8MH613.pdf PDF
RESEARCH 5 dixie penthouse.pdf PDF
Show all 50

Z2DA--CFM - Rebalance HVAC System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES:

1. FOR SYMBOL LISTS, ABBREVIATIONS, AND GENERAL

NOTES THAT APPLY TO ALL DRAWINGS SEE THE

9MH-0 SERIES OF DRAWINGS.

2. FOR GENERAL DETAILS SEE THE 9MH-5 SERIES OF

DRAWINGS.

3. FOR CONTROL DIAGRAMS SEE THE 9MH-8 SERIES OF

DRAWINGS.

4. FOR VALVE INFORMATION SEE NOTE 27 ON 9MH002.

SLVHCS

REPLACEMENT MEDICAL CENTER

PROJECT

629-HS2-401

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLE

ARCHITECT/ENGINEERS:CONSULTANTS: OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

NEW ORLEANS, LOUISIANA

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N E E

IG

H T I N C H O N E F O O T

O N E Q U A R T E R I N C H O N E F O O T

O N E H A L F I N C H O N E F O O T

T H R E E Q U A R T E R S I N C H O N E F O O T

T H R E E I N C H E S O N E F O O T

O N E I N C H F O R T Y F E E T

FULLY SPRINKLERED

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECHANICAL, ELECTRICAL & PLUMBING

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

COMMUNICATIONS DESIGN GROUP / LOW VOLTAGE

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

123456

F

B

A

D

C

E

F

Construction Documents 1

O N E S

IX

T E E N T H I N C H O N E F O O T

O N E A N D O N E H A L F I N C H E S O N E F O O T

BUILDING NUMBER

9MH610

BLDG 9 HVAC AIR TERMINAL UNIT AND FAN COIL

UNIT SCHEDULE

TA RPBJUNE 7, 2011

EWP_03

SINGLE DUCT AIR TERMINAL UNIT SCHEDULE (FLOOR 1)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE Max CFM Min CFM GPM (Flow)

CONTROL

TYPE

CONTROL

SEQUENCE Remarks

S-1 09-1Q E 1100 350 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-2 09-1Q D 750 350 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-3 1Q133 09-1Q B 650 650 0.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-4 1Q-C06 09-1Q C 650 650 1.0 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-5 09-1Q B 450 450 0.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-6 1Q-C04 09-1Q D 1000 1000 1.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-7 1Q-C04 09-1Q D 800 800 1.5 CV DETAIL 3 ON 9MH804 NOTE (2)

S-8 1Q-C05 09-1Q D 800 800 1.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-9 1Q130 09-1Q E 1100 350 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-10 1Q130 09-1Q D 750 350 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-11 1Q146 09-1Q C 800 800 1.0 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-12 1Q102 09-1Q C 1500 950 1.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-13 1Q122 09-1Q F 1500 825 1.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-14 1Q115 09-1Q B 200 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-15 1Q114D 09-1Q E 1050 550 1.25 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-16 1Q114 09-1Q G 1750 1750 3.0 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-17 1Q114A 09-1Q F 1500 900 1.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-18 1Q114A 09-1Q B 400 400 .75 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-19 1Q139 09-1Q D 800 800 1.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-20 1Q108B 09-1Q B 500 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-21 1Q100 09-1Q E 1200 350 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-22 09-1Q D 875 875 1.25 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-23 1Q102 09-1Q G 1800 950 1.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-24 1Q100 09-1Q E 900 350 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-25 1Q123B 09-1Q C 300 150 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-26 09-1Q B 375 150 0.5 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-27 1Q107 09-1Q B 400 150 0.5 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-28 1Q144 09-1Q B 950 475 0.5 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-29 1Q115 09-1Q C 600 225 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-30 1Q123B 09-1Q C 400 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

SINGLE DUCT AIR TERMINAL UNIT SCHEDULE (FLOOR 2)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE Max CFM Min CFM GPM (Flow)

CONTROL

TYPE

CONTROL

SEQUENCE Remarks

S-1 2Q138 09-2Q G 2000 750 1.25 VCV DETAIL 4 ON 9MH804 NOTE (1),(2),(3)

S-2 2Q138 09-2Q C 600 300 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-3 2Q138 09-2Q D 800 375 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-4 2Q127 09-2Q E 1000 525 1.25 VCV DETAIL 4 ON 9MH804 NOTE (1),(2),(3)

S-5 2Q127 09-2Q C 500 250 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-6 2Q123 09-2Q B 400 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-7 2Q-C01 09-2Q C 600 300 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-8 2Q121 09-2Q C 525 300 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-9 2Q121 09-2Q E 1300 1300 2.25 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-10 2Q121 09-2Q D 750 275 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-11 2Q121 09-2Q C 600 300 0.75 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-12 2Q128 09-2Q A 200 200 0.5 CV DETAIL 3 ON 9MH804 NOTE (2)

S-13 2Q126 09-2Q A 150 75 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-14 2Q101 09-2Q F 1650 1650 2.75 CV DETAIL 3 ON 9MH804 NOTE (2)

S-15 2Q-C01 09-2Q E 1000 350 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-16 2Q-C03 09-2Q B 325 175 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-17 2Q-C01 09-2Q E 1000 350 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-18 2Q101 09-2Q D 800 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-19 2Q109 09-2Q E 950 350 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-20 2Q-C01 09-2Q E 1000 350 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-21 2Q110 09-2Q C 800 800 1.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-22 2Q108 09-2Q B 225 125 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-23 2Q103 09-2Q D 750 750 1.25 CV DETAIL 3 ON 9MH804 NOTE (2)

S-24 2Q108 09-2Q B 400 400 1.0 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-25 2Q106 09-2Q B 250 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-26 2Q104 09-2Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-27 2Q102 09-2Q B 300 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

SINGLE DUCT AIR TERMINAL UNIT SCHEDULE (FLOOR 4)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE Max CFM Min CFM GPM (Flow)

CONTROL

TYPE

CONTROL

SEQUENCE Remarks

S-1 4Q102 09-4Q B 375 125 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-2 4Q104 09-4Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-3 4Q-C01 09-4Q B 300 300 0.75 CV DETAIL 3 ON 9MH804 NOTE (2)

S-4 4Q108 09-4Q A 150 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-5 4Q106 09-4Q B 300 300 0.75 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-6 4Q-C01 09-4Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-7 4Q118 09-4Q D 700 700 1.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-8 4Q120 09-4Q B 200 200 0.5 CV DETAIL 3 ON 9MH804 NOTE (2)

S-9 4Q101J 09-4Q C 450 225 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-10 4Q-C01 09-4Q B 350 150 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-11 4Q124 09-4Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-12 4Q130 09-4Q C 600 325 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-13 4Q130 09-4Q D 725 725 1.75 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-14 4Q130B 09-4Q A 150 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-15 4Q132 09-4Q B 200 200 0.5 CV DETAIL 3 ON 9MH804 NOTE (2)

S-16 4Q134 09-4Q B 300 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-17 4Q138 09-4Q C 450 225 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-18 4Q142 09-4Q B 300 300 0.75 CV DETAIL 3 ON 9MH804 NOTE (2)

S-19 4Q144 09-4Q B 300 125 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-20 4Q139 09-4Q B 300 150 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-21 4Q-C03 09-4Q C 475 225 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-22 4Q135 09-4Q B 400 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-23 4Q125 09-4Q C 600 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-24 4Q123 09-4Q C 600 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-25 4Q123 09-4Q B 200 200 0.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-26 4Q141 09-4Q D 775 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-27 4Q117 09-4Q E 1025 350 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-28 4Q109 09-4Q D 700 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-29 4Q101G 09-4Q B 375 375 1.0 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-30 4Q101G 09-4Q C 600 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-31 4Q101H 09-4Q B 225 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

SINGLE DUCT AIR TERMINAL UNIT SCHEDULE (FLOOR 5)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE Max CFM Min CFM GPM (Flow)

CONTROL

TYPE

CONTROL

SEQUENCE Remarks

S-1 5Q141 09-5Q E 1200 375 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-2 5Q141 09-5Q A 200 125 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-3 5Q141 09-5Q C 450 175 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-4 5Q-C03A 09-5Q B 400 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-5 5Q132 09-5Q E 1200 375 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-6 5Q-C02 09-5Q B 325 175 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-7 5Q133 09-5Q C 475 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-8 5Q129 09-5Q E 975 350 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-9 5Q-C03A 09-5Q C 500 375 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-10 5Q126 09-5Q B 300 175 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-11 5Q126 09-5Q D 975 975 1.75 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-12 5Q122 09-5Q B 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-13 5Q118 09-5Q B 325 325 0.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-14 5Q116 09-5Q B 300 175 0.5 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-15 5Q121 09-5Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-16 5Q114 09-5Q B 300 175 0.5 VCV DETAIL 4 ON 9MH805 NOTE (2)

S-17 5Q112 09-5Q D 900 900 1.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-18 5Q142 09-5Q B 300 150 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-19 5Q113 09-5Q C 650 300 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-20 5Q111 09-5Q C 575 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-21 5Q108 09-5Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-22 5Q142 09-5Q A 225 125 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-23 5Q100A 09-5Q F 1650 525 1.0 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-24 5Q-C01 09-5Q C 600 325 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-25 5Q100A 09-5Q D 850 425 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

SINGLE DUCT AIR TERMINAL UNIT SCHEDULE (FLOOR BQ)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE Max CFM Min CFM GPM (Flow)

CONTROL

TYPE

CONTROL

SEQUENCE Remarks

S-1 BQ110 09-BQ H 2700 1125 2.0 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-2 BQ110 09-BQ H 2700 1125 2.0 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-3 BQ110 09-BQ E 1400 1400 2.25 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-4 BQ110 09-BQ D 700 700 1.25 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-5 BQ110 09-BQ G 1800 1800 3.0 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-6 BQ110 09-BQ E 1000 1000 1.75 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-7 BQ138 09-BQ C 650 650 1.0 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-8 BQ106 09-BQ E 1100 1100 1.75 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-9 BQ106 09-BQ H 3000 3000 5.0 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

SINGLE DUCT AIR TERMINAL UNIT SCHEDULE (FLOOR 3)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE Max CFM Min CFM GPM (Flow)

CONTROL

TYPE

CONTROL

SEQUENCE Remarks

S-1 3Q140 09-3Q B 225 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-2 3Q140 09-3Q E 1300 650 1.25 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-3 3Q140 09-3Q C 500 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-4 3Q144 09-3Q D 800 300 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-5 3Q140 09-3Q A 200 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-6 3Q140 09-3Q C 500 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-7 3Q138 09-3Q B 225 125 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-8 3Q123 09-3Q A 275 275 0.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-9 3Q123 09-3Q C 600 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-10 3Q119 09-3Q D 725 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-11 3Q134 09-3Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-12 3Q128A 09-3Q B 225 125 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-13 3Q128A 09-3Q D 800 800 1.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-14 3Q111 09-3Q C 600 300 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-15 3Q128 09-3Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (1),(2)

S-16 3Q126 09-3Q C 600 300 0.75 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-17 3Q-C02 09-3Q D 850 275 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-18 3Q126 09-3Q D 775 775 1.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-19 3Q101A 09-3Q C 600 200 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-20 3Q122 09-3Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-21 3Q101G 09-3Q C 600 225 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-22 3Q112 09-3Q A 225 225 0.5 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-23 3Q108 09-3Q C 450 250 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-24 3Q104 09-3Q B 300 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-25 3Q114 09-3Q A 200 100 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-26 3Q106 09-3Q A 150 150 0.5 CV DETAIL 3 ON 9MH804 NOTE (2)

S-27 3Q101-1 09-3Q C 500 500 1.25 CV DETAIL 3 ON 9MH804 NOTE (1),(2)

S-28 3Q101J 09-3Q B 350 150 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

S-29 3Q101K 09-3Q C 450 150 0.5 VCV DETAIL 4 ON 9MH804 NOTE (2)

FAN COIL UNIT/ COMPUTER ROOM AC SCHEDULE (FLOOR BQ)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE

CONTROL

TYPE CONTROL SEQUENCE Remarks

FCU-1 BQ105 09-BQ A1 CV DETAIL 2 ON 9MH804 NOTE (1)

FCU-2 BQ106 09-BQ E1 CV DETAIL 1 ON 9MH804 NOTE (1)

FCU-3 09-BQ B1 CV DETAIL 2 ON 9MH804 NOTE (1)

FCU-4 09-BQ B1 CV DETAIL 2 ON 9MH804 NOTE (1)

FAN COIL UNIT/ COMPUTER ROOM AC SCHEDULE (FLOOR 1)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE

CONTROL

TYPE CONTROL SEQUENCE Remarks

CAC-1 09-1Q H2 CV DETAIL 1 ON 9MH805 NOTE (1)

CAC-2 1Q-C05 09-1Q H1 CV DETAIL 1 ON 9MH805 NOTE (1)

CAC-3 1Q112 09-1Q H1 CV DETAIL 1 ON 9MH805 NOTE (1)

CAC-4 1Q112 09-1Q H1 CV DETAIL 1 ON 9MH805 NOTE (1)

FCU-1 1Q-C03 09-1Q E1 CV DETAIL 1 ON 9MH804 NOTE (1)

FCU-2 1Q126 09-1Q F1 CV DETAIL 1 ON 9MH804 NOTE (1)

FCU-3 1Q117 09-1Q F1 CV DETAIL 1 ON 9MH804 NOTE (1)

FCU-4 1Q117 09-1Q F1 CV DETAIL 1 ON 9MH804 NOTE (1)

FAN COIL UNIT/ COMPUTER ROOM AC SCHEDULE (FLOOR 2)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE

CONTROL

TYPE CONTROL SEQUENCE Remarks

CAC-1 2Q-C01 09-2Q H1 CV DETAIL 1 ON 9MH805 NOTE (1)

FCU-1 2Q-C03 09-2Q E1 CV DETAIL 1 ON 9MH804 NOTE (1)

FAN COIL UNIT/ COMPUTER ROOM AC SCHEDULE (FLOOR 3)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE

CONTROL

TYPE CONTROL SEQUENCE Remarks

CAC-1 3Q-C01A 09-3Q H1 CV DETAIL 1 ON 9MH805 NOTE (1)

FCU-1 3Q101-1 09-3Q E1 CV DETAIL 1 ON 9MH804 NOTE (1)

FCU-2 3Q125 09-3Q G2 CV DETAIL 1 ON 9MH804 NOTE (1)

FAN COIL UNIT/ COMPUTER ROOM AC SCHEDULE (FLOOR 4)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE

CONTROL

TYPE CONTROL SEQUENCE Remarks

CAC-1 4Q-C01 09-4Q H1 CV DETAIL 1 ON 9MH805 NOTE (1)

FCU-1 4Q-C03 09-4Q E1 CV DETAIL 1 ON 9MH804 NOTE (1)

FCU-2 4Q131 09-4Q G1 CV DETAIL 1 ON 9MH804 NOTE (1)

FAN COIL UNIT / COMPUTER ROOM AC SCHEDULE (FLOOR 5)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE

CONTROL

TYPE CONTROL SEQUENCE Remarks

CAC-1 5Q-C01 09-5Q H1 CV DETAIL 1 ON 9MH805 NOTE (1)

FCU-1 09-5Q E1 CV DETAIL 1 ON 9MH804 NOTE (1)

FAN COIL UNIT / COMPUTER ROOM AC SCHEDULE (FLOOR 6)

MARK LOCATION

AREA AND/OR

BLDG SERVED SIZE

CONTROL

TYPE CONTROL SEQUENCE Remarks

FCU-1 09-6Q C1 CV DETAIL 2 ON 9MH804 NOTE (1)

FCU-2 09-6Q C1 CV DETAIL 2 ON 9MH804 NOTE (1)

FCU-3 09-6Q D1 CV DETAIL 2 ON 9MH804 NOTE (1)

FCU-4 09-6Q D1 CV DETAIL 2 ON 9MH804 NOTE (1)

NOTE: (1) INTEGRAL SOUND ATTENUATING DEVICE NOT REQUIRED.

(2) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR VCV AND CV.

(3) REFER TO DRAWING 9MH603 FOR DOWNSTREAM SOUND ATTENUATOR REQUIREMENT.

NOTE: (1) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR FCU AND CAC.

NOTE: (1) INTEGRAL SOUND ATTENUATING DEVICE NOT REQUIRED.

(2) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR VCV AND CV.

(3) REFER TO DRAWING 9MH603 FOR DOWNSTREAM SOUND ATTENUATOR REQUIREMENT.

NOTE: (1) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR FCU AND CAC.

NOTE: (1) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR FCU AND CAC.

NOTE: (1) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR FCU AND CAC.

NOTE: (1) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR FCU AND CAC.

NOTE: (1) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR FCU AND CAC.

NOTE: (1) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR FCU AND CAC.

NOTE: (1) INTEGRAL SOUND ATTENUATING DEVICE NOT REQUIRED.

(2) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR VCV AND CV.

(3) REFER TO DRAWING 9MH603 FOR DOWNSTREAM SOUND ATTENUATOR REQUIREMENT.

NOTE: (1) INTEGRAL SOUND ATTENUATING DEVICE NOT REQUIRED.

(2) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR VCV AND CV.

(3) REFER TO DRAWING 9MH603 FOR DOWNSTREAM SOUND ATTENUATOR REQUIREMENT.

NOTE: (1) INTEGRAL SOUND ATTENUATING DEVICE NOT REQUIRED.

(2) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR VCV AND CV.

(3) REFER TO DRAWING 9MH603 FOR DOWNSTREAM SOUND ATTENUATOR REQUIREMENT.

NOTE: (1) INTEGRAL SOUND ATTENUATING DEVICE NOT REQUIRED.

(2) REFER TO DRAWING 9MH607 FOR SCHEDULE CAPACITIES FOR VCV AND CV.

(3) REFER TO DRAWING 9MH603 FOR DOWNSTREAM SOUND ATTENUATOR REQUIREMENT.

1 Addendum # 1 06/17/11

3 Addendum # 3 07/01/11

RFI:00847 -Air Terminal Unit sizing incorrect and should meet the criteria on the Air Terminal Unit Schedule on drawing

9MH605.

RFI-847.1, 5TH

FLOOR S-12 SIZE

SHOULD BE "C"

File details come from the government source that posted it. Updated .