(01) Statement of Work (2).pdf
PDF 272 KB Posted
- Attached to
- 2611 ODP 2116 Polk Emission Testing
- Solicitation number
- 6100064822
- Issued by
- Washington County, Pittsburgh City, Pennsylvania
About this file
This is a Statement of Work issued by the Pennsylvania Department of Human Services (DHS) for emissions testing services at Polk Center, a state facility located in Polk, Pennsylvania. The Commonwealth is seeking a contractor to provide emissions testing for a 1.2 MW generator in compliance with Pennsylvania Department of Environmental Protection requirements. The contractor must submit a test protocol to DEP at least 90 days in advance of testing, provide an electronic draft test plan to DHS and the Facility within five business days of the purchase order issuance, and submit a final test plan for regulatory submission. All emissions testing must follow procedures outlined in Title 25, Chapter 139 of the Pennsylvania Code. A mandatory site visit is required for all bidders, which can be arranged by contacting Mr. Heathcliff Kalac at 814-432-0221 or Mr. Dana Kellogg at 814-432-0474. Questions regarding the IFB must be submitted to RA-pwbidquestions@pa.gov by January 20, 2026 at 10:00 AM, with answers posted by January 23, 2026. The contract term is one year from the purchase order issuance date, with options to renew for up to four additional one-year terms, with unit prices not to exceed 5% increases at each renewal. The Commonwealth may extend the contract by up to three months at its sole discretion.
Award will be made to the lowest responsible and responsive bidder. Bidders must submit proof of site visit, liability insurance, Workers Protection and Investment Certification, and proof of Air Emission Testing Body (AETB) accreditation with their proposals. The contractor will be reimbursed only for services performed and accepted by the Commonwealth upon submission of an invoice on company letterhead containing required information. The electronic draft report must be submitted within two weeks of completing onsite testing or within two business days of receiving laboratory results and must include an introduction, results and discussion, methodology, sample calculations, field data, laboratory data, quality control data, and process operating/control system data. Service completion will be verified through a Service Receipt sent to DHS - Polk Center's Accounting Department at 100 Lakewood Circle, Polk, Pennsylvania 16342.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (02)Proof of Visit (1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 4 Revision Date: July 14, 2023
DHS/ Polk Center
Statement of Work
IFB 6100064822 Emissions Testing
I. Objective
The Commonwealth of Pennsylvania (“Commonwealth”), Department of Human Services (“DHS”) is seeking a contractor to provide emissions testing services for Polk Center (“Facility”), located at 100 Lakewood Circle, Polk, Pennsylvania 16342.
II. Background
DHS is contractor to provide emissions testing as outlined below in Section IV, Scope of Work, to maintain compliance with Commonwealth of Pennsylvania, Department of Environmental Protection (“DEP”) requirements.
III. Term of Service
The term of this service will commence upon issuance of a purchase order to the selected contractor and will expire after one year, unless it is terminated earlier pursuant to the terms of the purchase order.
Further, the parties hereto may agree to renew the PO for up to four additional one-year renewal terms, upon the same terms and conditions as set forth in the PO. At the time of each renewal the Department and Contractor shall negotiate the PO unit price not to exceed a maximum of 5% over the unit price in effect at the time of each renewal term. The term of this Project may be extended by and at the sole option of the Commonwealth for up to 3 months upon the same terms and conditions where a continued needed exists for the services of the selected contractor and there has been no termination under the terms of the Contract or Purchase Order.
IV. Scope of Work
1. The selected contractor shall submit a test protocol to the DEP at least 90 days in advance of the emissions testing.
Page 2 of 4 Revision Date: July 14, 2023
2. The selected contractor shall submit an electronic draft test plan to DHS and the Facility for review within five business days following the receipt of a purchase order or other notice to proceed.
3. The selected contractor shall submit an electronic copy of the final test plan to DHS and the Facility to be submitted to the regulatory agency.
4. The selected contractor shall perform emissions testing following procedures for the sampling and testing in accordance with the provisions of Title 25, Chapter 139 of the Pennsylvania Code. A copy of this chapter can be found in the attachments of this IFB.
5. The selected contractor shall submit an electronic draft report within two weeks following the completion of onsite testing, or, if sample analyses are required, within two business days following the receipt of laboratory results. The selected contractor shall include the following gin the final test report:
A. Introduction – Brief discussion of project scope of work and activities.
B. Results and Discussion – A summary of test results and process or control system operational data with comparison to regulatory requirements or vendor guarantees along with a description of process conditions, testing deviations, or both, that may have affected the testing results.
C. Methodology – A description of the sampling and analytical methodologies.
D. Sample Calculations – Example calculations for each target parameter.
E. Field Data – Copies of actual handwritten or electronic field data sheets.
F. Laboratory Data – Copy of laboratory reports and chains of custody.
G. Quality Control Data – Copies of all instrument calibration data, calibration gas certificates, or both.
H. Process Operating/Control System Data – Process operating, control system.
Continuous Emissions Monitoring System (“CEMS”) data (as provided by DHS and the Facility), or all, to support the test results.
V. Specific Requirements
1. Mandatory Site Visit. Contractors wishing to place a bid must first complete a site visit and include the signed Proof of Site Visit form with their bid submission. The site visit may be arranged by contacting Mr. Heathcliff Kalac at 814-432-0221 or Mr.
Dana Kellogg at 814-432-0474.
Page 3 of 4 Revision Date: July 14, 2023
2. Required Experience. The selected contractor shall conduct the sampling and testing under the direct supervision of persons qualified, by training and experience, to conduct the sampling and testing.
VI. Bid Requirements
Contractors’ electronic submission must include the following as attachments. Failure to submit these items when they are needed may result in the rejection of the Contractor’s submission.
1. Proof of Visit.
2. Liability Insurance;
3. Workers Protection and Investment Certification; and
4. Proof of Accreditation as an Air Emission Testing Body (“AETB”).
VII. Questions and Answers
All questions regarding the IFB must be submitted via the RA-pwbidquestions@pa.gov email address. All questions must be received by 1/20/2026, 10:00 AM. Include the IFB bid number in the subject of the email.
All questions and answers are considered an addendum to the IFB. Answers will be post by 01/23/2026.
VIII. Contract Award
Award will be made based on lowest responsible and responsive bidder.
IX. Estimated Quantities
The quantities are estimated only and may increase or decrease dependent upon the needs of the Facility.
X. Contact Information
Heath Kalac 100 Lakewood Circle Polk, PA 16342 814 432-0221
XI. Confirmation of Service
A Service Receipt will be used to verify that work has been completed.
A Service Receipt should be sent to:
mailto:RA-pwbidquestions@pa.gov
Page 4 of 4 Revision Date: July 14, 2023
DHS – Polk Center Attn: Accounting Dept.
100 Lakewood Circle
Polk, PA 16342
XII. Payment Provisions:
The selected Contractor will be reimbursed only for commodities/services performed and accepted by the Commonwealth of Pennsylvania.
Failure to submit invoices in compliance with the following instructions will result in the invoices being returned to the contractor and will substantially delay processing of payments. The contractor shall be paid upon satisfactory delivery/completion of work performed and submission of an invoice on the contractor’s letterhead.
The invoice should contain at minimum the information listed on the sample invoice – Supplier Sample Invoice can be found at:
http://www.dgsweb.state.pa.us/comod/CurrentForms/SampleSupplierInvoice.doc http://www.dgsweb.state.pa.us/comod/CurrentForms/SampleSupplierInvoice.doc
File details come from the government source that posted it. Updated .