01 PWS_Skid_Assembly_2025.pdf
PDF 99 KB Posted
- Attached to
- F-15 Wing Skid Fabrication
- Solicitation number
- FA860425QB002
About this file
This Performance Work Statement (PWS) details painting services for the Air Force Packaging and Engineering Facility (AFLCMC/EZPAA) involving 12 steel skid assemblies. The project requires painting 4 lots of 3 skid assemblies, specifically weldments including Skid Weldment, Cradle Outboard/Inboard/Lateral Weldments, Accessory Box, and Bracket Weldment. Each lot must be finished and ready for customer pickup within 15-20 business days of part delivery to the paint facility.
The contract period of performance is from 1 June 2025 through 31 May 2026, with work to be performed at a contractor's facility located within 70 miles of Wright Patterson AFB. The government will deliver and retrieve parts using base transportation services. The PWS notes that AFLCMC/EZPAA lacks in-house painting capabilities, necessitating external painting services to complete the project. Detailed painting and masking specifications are referenced in a separate document titled "Skid Assembly Paint Pkg 2025.pdf".
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
AFLCMC/EZPAA - Air Force Packaging and Engineering Facility (AFPTEF)
14 April 2025
1.0 Description of Service: This Performance Work Statement (PWS) provides details for painting of 4 lots of 3 skid assemblies to support the completion of a total of 12 skid assemblies.
1.1 Lot Details
Lots 1-4: Weldments for three assemblies
(P/Ns Skid Weldment & Cradle Outboard Weldment & Cradle Inboard Weldment & Cradle Lateral Weldment & Accessory Box & Bracket Weldment)
Each lot of parts shall be finished (including cure time, as required) and ready for customer pickup within 15 – 20 business days of delivering parts to the paint facility.
2.0 Background: AFLCMC/EZPAA does not have in-house painting capabilities. The parts and assemblies for fabrication require painting in order to complete the project.
3.0 Scope: The scope of this effort includes painting the parts and assemblies for twelve total assemblies. The painting and masking details for each individual part and assembly are included in the documents shown below:
“Skid Assembly Paint Pkg 2025.pdf”
4.0 Period of Performance:
The period of performance for this contract will cover 1 June 2025 thru 31 May 2026.
5.0 Hours of Operation/Principle Place of Performance: Work in support of this PWS shall be performed at the contractor’s facility within 70 miles of Wright Patterson AFB. The government will deliver and pick up parts to the contractor’s facility using base transportation services.
File details come from the government source that posted it. Updated .