About this file
This is a Bid Form for the 2025 Lakeview Cemetery Infrastructure Project (Project Numbers 25Q0022 & 25U0007) issued by a local government entity in Colorado. The project encompasses comprehensive infrastructure improvements at Lakeview Cemetery, including constructing six columbarium footer foundations, performing civil work, and rehabilitating the cemetery's wrought iron fence and entrance gates. Key scope items include unclassified excavation, tree removal and relocation, concrete replacement, sedimentation control, aggregate base course installation, bench placement, and fence restoration. The bid form includes 18 base bid items and two add alternate items, with a total base bid amount of $8,500.00.
The bid pricing structure allows for unit price adjustments, with contractors required to include all necessary materials, labor, and associated costs for a complete project. The bid form specifies that quantities are estimates and may be increased, decreased, or omitted, with payment based on actual work performed. A force account line item of $8,500.00 is included, and the City retains sole discretion in selecting add alternate bid items. The project emphasizes long-term durability, specifically noting that fence components must withstand decades of use and allow for secure installation with easy removal for vehicle access.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 04_Lakeview Cemetery Fence Repair - Scope of Work.pdf | ||
| 05_Specifications_.docx | DOCX document | |
| 03_Project Plans - Lakeview Cemetery Columbariums.pdf | ||
| Lakeview Cemetery Bid Document Package.pdf | ||
| 02_Sample Construction Agreement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| BID FORM |
| 2025 Lakeview Cemetery Infrastructure (Columbarium & Fence Restoration) Project - 25Q0022 & 25U0007 |
| Round ALL unit prices to the nearest penny |
| All bids shall be submitted on this bid form provided. The quantities appearing in the bid form are estimates prepared for the comparison of proposals, and the quantities of work performed and materials to be furnished may be increased, decreased, or omitted. Payment will be based on the actual quantities of work performed. CONTRACTOR price must include all necessary material, labor and other appurtenances for a complete and working project per the project plans and specifications. |
| BASE BID |
| ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL COST |
| 1 | Mobilization & General Conditions (Not to Exceed 5% of Base Bid total) | LS | 1 | $ - 0 | |
| 2 | Unclassified Excavation (Dispose of sod & Dirt removed for subgrade prepration | LS | 1 | $ - 0 | |
| 3 | Remove Existing Trees | EA | 3 | $ - 0 | |
| 4 | Relocate existing sign | EA | 1 | $ - 0 | |
| 5 | Remove and replace existing concrete (6" thick) | SF | 130 | $ - 0 | |
| 6 | Sedimentation Control Log | LF | 75 | $ - 0 | |
| 7 | Columbarium Footing (111" L X 30" W X 59" D) | EA | 6 | $ - 0 | |
| 8 | 6" class agregate base course | SF | 940 | $ - 0 | |
| 9 | 6" Thick Concrete | SF | 940 | $ - 0 | |
| 10 | Bench (Cassidy Arched Back Bench by Barco Products or approved equal) | EA | 7 | $ - 0 | |
| 11 | Sod Disturbed Area | SF | 260 | $ - 0 | |
| 12 | Fence Restoration (Rehabilitation) | LF | 870 | $ - 0 | |
| 13 | Main Entrance Gate | EA | 1 | $ - 0 | |
| 14 | Pedestrian Entrance Gate | EA | 4 | $ - 0 | |
| 15 | Removalble Post modification for Vehicle Access | EA | 2 | $ - 0 | |
| 16 | Removable panel modifiectron for vehicles Access | EA | 3 | $ - 0 | |
| 17 | Temporary Fence | LS | 1 | $ - 0 | |
| 18 | Force Account | LS | 1 | $ 8,500.00 | $ 8,500.00 |
| TOTAL BASE BID | $ 8,500.00 | |
| Contractor Name: |
| ADD ALTERNATES | |||||
| DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL COST | |
| Alt #1 | N/A - Alternate #1 - completed by CCOB Staff | EA | 1 | $ - 0 | |
| Alt #2 | Relocate Existing Trees | EA | 1 | $ - 0 | |
| TOTAL LANDSCAPE ADD ALTERNATES | $ - 0 |
| BID SUMMARY | ||
| BASE BID | $ 8,500.00 | |
| BASE BID + ALT #2 | $ 8,500.00 |
| For Add Alternate Bid Items: |
| All schedules (bid items) must be bid. Add alternate bid item wil not be awarded independent of the Base Bid. Add alternate bid item(s), if accepted, individually, or as a group, shall be inlcuded in the contract and the amount shall be adjusted from the Base Bid at the time of award. The City shall have sole discretion in determining the selection of the add alternate bid item(s). The award will be based on the Base Bid plus selected alternate items. |