01_AIR_SPEC.docx

DOCX document 26 KB Posted

Attached to
FA821323R3016 - IDIQ TLX/SMDC Lines for F-16 and B-2 Aircraft
Solicitation number
FA821323R3016
Issued by

About this file

This document outlines specifications for an ammunition contract. It provides requirements for reporting shipment details in advance, contacting the Defense Contract Management Agency for transportation guidance on foreign military sales deliveries, and includes ammunition data card and item marking instructions. Hazard classification information, engineering change proposals, lot acceptance test requirements, and failure analysis reporting are also specified. The related solicitation is for an IDIQ contract to provide components for F-16 and B-2 aircraft to the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base.

View the file

Other files

File Type Posted
FA821323R3016_______0001 Amendment 1.pdf PDF
SPI_F014615481.pdf PDF
09b_EDL_F16.pdf PDF
SPI_F012501292.pdf PDF
09a_EDL_B2.pdf PDF
04_CADPAD_Item_Marking_Instruction.pdf PDF
SPI_F014998853.pdf PDF
FA821323R3016.pdf PDF
SPI_F012548612.pdf PDF
11_CDRLs.pdf PDF
12b_JHCS.pdf PDF
03_ADC_SOW.pdf PDF
Price Matrix Template.xlsx XLSX spreadsheet
10_Bid_Sets.pdf PDF
05_SOW_Packaging.pdf PDF
08b_F16_Item_Description.pdf PDF
SPI_F015150929.pdf PDF
SPI_F010639732.pdf PDF
SPI_F014615515.pdf PDF
08a_B2_Item_Description.pdf PDF
02_REPSHIP.pdf PDF
SPI_F011448481.pdf PDF
SPI_F015150933.pdf PDF
12a_JHCS.pdf PDF
06_Rework_Repair.pdf PDF
SPI_F010549950.pdf PDF
07_JFQR.pdf PDF
SPI_F014548835.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIRMUNITION SPECIFICATION

FD2020-22-51234

NSN: SEE NSN LIST

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office For transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides on information copy of the completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to:

AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.trasportation@us.af.mil

3. Department of Defense Identification Code (DODIC): SEE NSN LIST

4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)

5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.6, dates 06 MARCH 2023, reference attachment.

6. Shelf Life Code marking NOT required per MIL-STD-129R.

7. Hazard Classification Information: SEE ATTACHED DESKES/JHCS/IHC RECORDS Hazard Class/Division:

Storage Compatibility Group:

DOT Marking/EX Number:

DOT Shipping Label:

UN Serial No.:

Proper Shipping Name:

Net Explosive Weight per item (NEW):

NEW Unit of Measurement: POUNDS NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-1A. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639E)
NORs – CDRL (DI-SESS-80642E)
RFVs – CDRL (DI-SESS-80640E)

Distribution Statement: B, Reason: ADMINISTRATUVE OR OPERTATIONAL (ref. DoD 5230.24)

9. Item(s) must pass both gross and fine leak checks. MIL-STD-883L, Method 1014-18 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same. Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

10. Lot Acceptance Test Requirements are: CONTRACTOR in accordance with latest govt. approved ATP

11. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

12. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHJ, E-mail: quinn.tidewell@us.af.mil

13. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255B)

14. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

15. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).

16. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

17. Percussion primers shall have been certified/recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage, and through final installation in end item.

All primers shall be X-rayed in top and side views for critical defects prior to use.

18. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: see attached instructions for DCMA

19. The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have external cosmetic defects such as nicks, dings, scratches, paint blemishes, and small burrs. These units can be used as pre-selected production lot samples as long as the units do not create an interference with the test fixture. The selection of those samples shall be noted in a discrepancy report that shall identify the item part number, DODIC, contract, lot number, serial numbers of the pre-selected units, and the cosmetic defect of each serial number. DCAM shall be notified in advance by submission of the discrepancy report of the pre-selected production lot test samples with external cosmetic defects prior to the submission oof the production lot for random sample selection. LAT units preselected under this premise shall be noted in the Lot Acceptance Test Report.

20. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment #5, ES7034).

21. Contractor shall provide an Obsolescence Alert Notice that a pending and/or emergent obsolescence issue exists.

CDRL (DI-MGMT-81941)

22. Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives.

Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

File details come from the government source that posted it. Updated .