01-20_Bid_Tabulation.pdf
PDF 108 KB Posted
- Attached to
- Small Scale Stormwater Improvement Project #6
- Solicitation number
- 01-20
- Issued by
- Volusia County, Florida
About this file
This is a bid tabulation form for Small Scale Stormwater Improvement Project No. 6 (Bid No. 01-20) in Florida, detailing construction costs for stormwater management and drainage improvements across multiple project locations. The project encompasses two main components: the Margarita Road and Sunrise Boulevard Drainage Improvements Project and the Hayman Court Pipeline Rehabilitation Project. Work items include mobilization and demobilization, survey and layout services, maintenance of traffic, dewatering and flow diversion, silt fence installation, stormwater pipe and underdrain systems, concrete work, turf installation, drain basins, and utility coordination activities. The tabulation presents bid pricing from three competing contractors across numerous line items with varying quantities measured in lump sum, linear feet, square yards, and individual units.
The bid tabulation presents three separate bid submissions with significantly varying price proposals. The Margarita Road and Sunrise Boulevard Drainage Improvements Project generated total bids of $84,637.83, $113,497.66, and $141,150.00, while the Hayman Court Pipeline Rehabilitation Project bids totaled $87,709.66, $63,550.00, and $156,232.00. The grand total bids across both projects ranged from $172,347.49 to $297,382.00, indicating substantial cost variation among bidders. Notable price discrepancies appear in high-value line items such as RICIP pipe lining for the Hayman Court project, where bids ranged from $52,000.00 to $139,500.00 for 558 linear feet, and drain basin installation items with bids spanning from $30,375.00 to $37,800.00 for nine units.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM - BID NO. 01-20 - Small Scale Stormwater Improvement Project No.6
TSC ALL TERRAIN GPS CIVIL
PAY ITEM NO. DESCRIPTION QTY. UNIT BID TOTAL BID TOTAL BID TOTAL
101-1 Moblization/Demobilization 1 LS 448.72 7,500.00 8,000.00
101-2 Survey, Layout and Certified As-Built 1 LS 3,205.13 5,800.00 4,400.00
900-1 As-Built Plans 1 LS 3,205.13 3,800.00 2,000.00
900-2 Indemnification 1 LS 615.38 1,750.00 1,300.00
102-1 Maintenance of Traffic 1 LS 1,089.74 4,500.00 9,000.00
104-1-1 Dewatering and Flow Diversion, Temporary Shoring 1 LS 7,051.28 8,250.00 19,000.00
104-13-1 Staked Silt Fence (Type III) 270 LF 692.31 445.50 810.00
104-'18 Inlet Protection System 3 EA 384.62 1,155.00 450.00
110-1 Clearing and Grubbing (Including Demolition) 1 LS 2,564.10 6,500.00 5,000.00
425-2-61 Manholes, P-8, < 10' 2 EA 6,410.26 14,355.86 9,000.00
440-1-30 Underdrain - Type III (6") 219 LF 19,166.67 10,731.00 26,280.00
440-73-1 Underdrain - Outlet Pipe (4") 38 LF 3,166.67 1,681.50 1,330.00
440-73-3 Underdrain - Outlet Pipe (8") 25 LF 2,564.10 875.00 1,000.00
522-1 Concrete Sidewalk (4") 190 SY 3,173.08 8,293.50 9,500.00
522-2 Concrete Driveway (6" thick) 38 SY 2,679.49 2,445.30 2,280.00
570-1-2 Performance Turf, Sod, Bahia 750 SY 6,490.38 3,240.00 3,000.00
561 No. 1 Drain Basin with Round Solid Cover (18" Diameter) Refer to
Detail on Sheet 11 of 13 - Construction Plans. 9 EA 21,153.85 30,375.00 37,800.00
1050-1 Utility Coordination Activities 1 LS 576.92 1,800.00 1,000.00
84,637.83 113,497.66 141,150.00
101-1 Moblization/Demobilization 1 LS 487.18 4,500.00 5,500.00
102-1 Maintenance of Traffic 1 LS 1,256.41 4,500.00 4,500.00
431-1-1 Furnish and Install RICIP Pipe Lining => 18" x 7.5 mm pipe for job size 501' to 1000' 558 LF 75,148.76 52,000.00 139,500.00
570-la Performance Turf, Sod, Bahia 250 SY 2,163.46 1,080.00 2,232.00
570-lb Performance Turf, Sod, Floratam St. Augustine 750 SY 8,653.85 1,470.00 4,500.00
87,709.66 63,550.00 156,232.00
172,347.49 177,047.66 297,382.00
Hayman Court Total
Grand Total
Margartia Road and Sunrise Boulevard Total
Margartia Road and Sunrise Boulevard Drainage Improvements Project
Hayman Court Pipeline Rehabilitation Project
File details come from the government source that posted it. Updated .