This is a plan and scope of work document prepared by Pegasus Engineering, LLC for the State of Florida, related to Small Scale Stormwater Improvement Project No. 6 (Bid No. 01-20), specifically for pipeline rehabilitation work in the Hayman Court area of the Summerhaven subdivision. The project involves the rehabilitation of existing storm water pipes showing signs of failure through the installation of resin-impregnated cured-in-place pipe (RICIPP) liners. The work encompasses approximately 578 linear feet of 18-inch HDPE pipeline rehabilitation distributed across four sections, with lengths of approximately 75, 240, 63, and 180 linear feet. The scope requires contractors to furnish all labor, materials, equipment, and tools necessary for the rehabilitation work, including pre-installation cleaning, video inspection, bypass pumping, obstruction removal, and post-installation testing. The document represents 90% plans prepared in June 2019 and sealed by David W. Hamstra, P.E. (Registration No. 38652).

The contractor is responsible for performing all installation work using either hydraulic head inversion or pull-and-inflate methods, with curing accomplished through hot water circulation or other approved methods to ensure a continuous, watertight, and properly formed finished pipe. Additional required services include reestablishment of services, pre- and post-installation television inspection, connections, testing, and final inspections. The project is identified as Bid Package #5 within the broader Small Scale Stormwater Improvement initiative. No specific pricing information, set-asides, award dates, or contract term details are provided in this technical document; those details would be contained in the separate bid documents and contract specifications referenced in the solicitation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET OF

RE

V.

DA

TE

DE

SC

RIP

TIO

N

DATE:

APPROVED BY:

DRAWN BY:

DESIGNED BY:

JOB NO.:

Pegasus Engineering, LLC 301 West SR 434, Suite 309

Winter Springs, Florida 32708 Office 407-992-9160 Fax 407-358-5155

State of Florida Board of Professional Engineers Certificate of Authorization No. 27770

NOT A FINAL PLAN UNLESS

SIGNED AND SEALED

DATE:

EXISTING STORM PIPES

EXHIBITING SIGNS OF FAILURE

BEGIN PIPELINE

REHABILITATION

END PIPELINE

REHABILITATION

+/- 75 LF ~ 18" HDPE

+/- 240 LF ~ 18" HDPE

+/- 63 LF ~ 18" HDPE

+/- 180 LF ~ 18" HDPE

BRICK

MAILBOX

LIGHT POLE AND

ELECTRICAL

TRANSFORMER

BRICK

MAILBOX

PALM

TREES

PALM

TREES

LIGHT

POLE WATER METER AND

ELECTRICAL

TRANSFORMER

BRICK

MAILBOX

SUMMERHAVEN

SUMMERHAVEN

GA

MS

D R

HAYMAN CT

DOLPHIN COVE CT

WHITECAP COVE CT

ANNEZ WAY

HAYMAN CT HAYMAN CT

AN

NE

Z W

AY

580570

580560

565555

SM

AL

L S

CA

LE

S

TO

RM

W

AT

ER

X4

JUNE 2019

DWH

GAT

GAT

DYC-22001

BI

D

PA

CK

AG

E

#5

HA

YM

AN

C

OU

RT

(S

UM

ME

RH

AV

EN

0' 30'

1" = 30'

DAVID W. HAMSTRA, P.E.

REGISTRATION No. 38652

ST

OR

M

PI

PE

R

EP

AI

RS

(P

RO

JE

CT

2)

90% PLANS

JUNE 11, 2019

SCOPE OF WORK FOR PIPELINE REHABILITATION

The Contractor shall furnish all labor, materials, equipment, and tools necessary for the Rehabilitation of storm water lines by the installation of a resin-impregnated flexible felt tube, which is inverted into the existing conduit by use of hydraulic head. Where inversion is not appropriate, a pull and inflate method will be acceptable.

Curing shall be accomplished by circulating hot water (or other approved method) within the liner tube to cure the encapsulated resin system.

When cured, the finished pipe will be continuous, watertight, and formed to the original conduit.

Cleaning and inspections of conduits, bypass pumping, line obstruction removal, reestablishment of services, pre-installation video recording, installation of Resin Impregnated Cured-in-Place Pipe (RICIPP) including installation television inspection, post-installation video recording, connections, testing and final inspections are all part of this work.