007100_Attch1_Airfield Construction Waiver.pdf

PDF 192 KB Posted

Attached to
Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
Solicitation number
FA813726R0043
Issued by

About this file

This is an Airfield Construction Waiver Application Form used by the U.S. Air Force to request temporary waivers from airfield construction standards outlined in UFC 3-260-01. The form is a template designed for government civil engineering use and contractor coordination related to construction activities at military installations.

Requesters must complete blocks 1, 2, and 4-6, 8, 10, and 11, with "N/A" entered for any non-applicable sections. Key required information includes the project or work order number, contract number, a detailed map depicting the construction location, a description of construction activities, the facility number closest to the work, specific criteria being waived with reference to UFC 3-260-01 chapters and paragraphs, and location/height data including ground elevation, tallest equipment height, and total height calculations. The form requires justification for why the temporary waiver is needed and detailed risk mitigation measures for each violation or waiver, such as special painting, obstruction lighting, barricades, marshallers, flagging, and safety procedures. Point of contact information must include the CEC project manager and contractor details with phone and email. Coordination must be completed with multiple Air Force offices including the Airfield Manager (72 OSS/OSAM), Airfield Operations (72 OSS/OSA), TERPS (HQ AFMC/A3), Flight Safety (72 ABW/SEF), Ground Safety (72 ABW/SEG), Logistics (72 LRS/DD), Communications (72 CS/SCX), and Security Forces (72 SFS/S5S). Final approval authority rests with the Installation Commander, or the Base Civil Engineer in emergency situations per UFC 3-260-01, B1-2.5.4.7.

View the file

Other files

File Type Posted
240176_ATT02_STATEMENT OF WORK_Admendment 2.pdf PDF
Solicitation - FA813726R0043.pdf PDF
240176_ATT09_SOW.pdf PDF
240176_STATEMENT OF WORK-Amendment 1.pdf PDF
240176_ATT 11_Submittal Register.xlsx XLSX spreadsheet
240176_ATT 10_Design Narrative.pdf PDF
Industrial Waste Lines 1969.pdf PDF
WWYK143004_CU507.pdf PDF
WWYK143004_CU503.pdf PDF
WWYK143004_CU500.pdf PDF
WWYK143004_CU504.pdf PDF
Pages from 910139.pdf PDF
20010298.pdf PDF
710237.pdf PDF
430515.pdf PDF
2025 TAFB Electrical Standards - Signed.pdf PDF
01 78 00.pdf PDF
UMRL.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
dafi21-101.pdf PDF
dafi13-213.pdf PDF
afman40-201.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
tinkerafbi21-100.pdf PDF
007200_Attch13_AF487.pdf PDF
007200_Attch7a_AF3952.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
240176_ATT 11_Submittal Register.pdf PDF
240176_Final_ Plan Set.pdf PDF
WWYK143004_CU502.pdf PDF
WWYK143004_CU513.pdf PDF
WWYK143004_CU501.pdf PDF
WWYK143004_CU505.pdf PDF
20090026A.pdf PDF
B02119.txt TXT text file
690255.pdf PDF
480211.pdf PDF
Combined As-Built Record Dwgs.pdf PDF
FIRE SUPPRESSION GEODESIC SHOP DRAWINGS AS-BUILTS.pdf PDF
2025 TAFB Mechanical Standard_Signed.pdf PDF
01 33 00.pdf PDF
01 33 16.00 10.pdf PDF
01 32 16.00 20.pdf PDF
tinkerafb_INRMP.pdf PDF
afman32-7003.pdf PDF
afman48-148.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS: Requester MUST complete blocks 1, 2, 4-6, 8,10,11, if not applicable put N/A in the block.

4.

5.

6.

7.

8.

9.

10.

Phone & Email:CEC (THDR, Alutiq,etc.) Project Manager:

Phone & Email:

Construction End Date:

11.

12.

LOGISTICS

COMMUNICATIONS

Installation Commander approval authority. If waiver is an emergency the Base Civil Engineer may approve according to UFC 3-260-01, B1-2.5.4.7.

72 OSS/OSAM

72 OSS/OSA

HQ AFMC/A3

72 ABW/SEF

72 ABW/SEG

72 LRS/DD

72 CS/SCX

AIRFIELD OPERATIONS

TERPS

FLIGHT SAFETY

GROUND SAFETY

Describe risk mitigation measures that will be taken for each violation/waiver. (eg. Special painting, obstruction lighting, barricades, marshallers, flagging, safety plan/recall procedures, etc.)

AIRFIELD MANAGER

COORDINATION COMPLETED (Government Civil Engineering Use Only):

Point of Contact Data:

AIRFIELD CONSTRUCTION WAIVER APPLICATION FORM

N

CRITERIA TO BE WAIVED (Government Use Only- State Chapter, paragraph, table number, etc. from UFC 3-260-01 or other):

Include a map with a detailed depiction of the construction location and submit with this form.

Description of Construction Activity: Include description of construction with notes pertaining to the work that will be done.

Location and Height Data of Construction Activity:

SECURITY FORCES 72 SFS/S5S

Why is the temporary waiver required?

h of construction.

Facility Number (Closest to Construction Activity):

Form Date: April 2018

13. APPROVAL (Government Use Only)

Installation Commander

Contractor (Executing the work):

Construction Start Date:

1. Project or Work Order # 2. Contract # 3.Waiver # (Government Use Only)

Longitude:

Latitude: W

A) Construction Activity Ground Elevation (Average Mean Sea Level):

B) Tallest Construction Equipment Height (Crane Height, etc):

Ft.

Ft.

Total Height (A+B): Ft.

(Base Civil Engineer if Emergency)

1405266233C Highlight

Text5:
Text9:
Text8:
Text10:
Text11:
Text12:
Text13:
Text14:
Text15:
Text16:
Text17:
Text18:
Text19:
Text20:
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Text31:
Text32:
Contract #:
Project or Work Order #:
Text1:

File details come from the government source that posted it. Updated .