007_APNDX-B_CD-REPORT_4Jul2020.pdf
PDF 95 KB Posted
- Attached to
- Barracks Restoration Project #11 - Bid Abstract Added Federal contract opportunity
- Solicitation number
- W912L9-20-B-0004
- Issued by
- Department of the Army National Guard
About this file
This federal solicitation notice is for renovation services for Barracks Project 11 at two buildings on an Army National Guard base. The single firm fixed-price contract will provide all labor, materials, equipment and supervision for interior and exterior renovations to correct mechanical, electrical and plumbing deficiencies. Renovations include selective demolition, installation of a new geo-thermal well ground loop system, fire suppression system, and facility controls. The contract duration is 240 days with a project magnitude between $1,000,000 to $5,000,000. The solicitation is set aside 100% for small businesses with a NAICS code of 236220 and size standard of $39,500,000. Interested contractors should register with SAM and check the beta.SAM website for solicitation documents and amendments. The pre-bid conference is in August 2020 with the bid opening on September 9, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract Signed Project 11.pdf | ||
| Solicitation Amendment 3 W912L920B00040003.pdf | ||
| Questions and Answers UPDATED 9-2-2020.pdf | ||
| Questions and Answers.pdf | ||
| Solicitation Amendment 2 W912L920B00040002.pdf | ||
| AF-66 Submittals_BP11.pdf | ||
| CAMP ATTERBURY BARRACKS AND BOQ RENOVATION -BP11 - 2020.0820.pdf | ||
| 20200819 SITE VISIT PREPROPOSAL CONFERENCE MEETING MINUTES COMBINED.pdf | ||
| 102113.19 FL - Plastic Toilet Compartments.pdf | ||
| Sign In Sheet Site Visit.pdf | ||
| Solicitation Amend W912L920B0004.pdf | ||
| Phase 2 Addendum No 01 BP11.pdf | ||
| Barracks Statement of Work 05-21-2020 BP-11.pdf | ||
| eCMRAMemo.pdf | ||
| DRAWINGS BP3 20200519.pdf | ||
| 003_Phase 2_Project Manual Vol 1of 2_19May20.pdf | ||
| Solicitation W912L9-20-B-0004 PROJECT 11.pdf | ||
| 004_Phase 2_Project Manual Vol 2 of 2_19May20.pdf | ||
| AF-66 Submittals_BP3.pdf | ||
| Barracks Statement of Work 05-21-2020 BP-3.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME and NUMBER
PAY APP NUMBER
LOCATION
DATE
DEBRIS
DIVERTED DIVERTED
FROM FROM
QUANTITY TONS LBS YARDS LANDFILL QUANTITY TONS LBS YARDS LANDFILL
(#) () () () (Y or N) (#) () () () (Y or N)
ABC‐Asphalt OD/I/M ‐ Insulation
ABC‐Brick OD/I/M ‐ OTHER (C&D Other)
ABC‐Concrete OD/I/M ‐ Paper
ABC‐OTHER (C&D Masonry/Asphalt) OD/I/M ‐ Plastic
ABC‐Stone OD/I/M ‐ Siding
Land‐Crushed Stone/Base Recycled C&D Debris
Land‐OTHER (C&D Land Clearing) Wood ‐ Finished
Land‐Soil, Lead‐Tainted, Non‐Hazardous Wood ‐ OTHER (C&D Wood)
Land‐Soil, Petroleum‐Tainted Wood ‐ Structural
Land‐Soil, Subsoil Wood ‐ Treated
Land‐Soil, Top
Land‐Vegetation/Timber (Tree Trunks & Limbs)
Metal‐Aluminum
Metal‐Copper
Metal‐Mixed Metal
Metal‐OTHER (C&D Metal) OTHER:
Metal ‐ Steel OTHER:
OD/I/M ‐ Ceiling Tile OTHER:
OD/I/M ‐ Composition Roof OTHER:
OD/I/M ‐ Doors/Windows/Stairs/Cabinets OTHER:
OD/I/M ‐ Glass OTHER:
OD/I/M ‐ Gypsum/Plaster OTHER:
Project Manager
Construction & Demolition Debris Report PROJECT: 2020‐008, Barracks Phase 2 APPENDIX B
File details come from the government source that posted it. Updated .