This document is a Fire Protection Outline for a federal contract opportunity related to replacing patient lifts at the James E. Van Zandt Veterans Administration Medical Center in Altoona, PA.
The key details are:
- The project involves replacing all patient lifts not scheduled for replacement under current projects at the main medical center and 5 community-based outpatient clinics. It is a critical project as the majority of lifts are past their serviceable life.
- The engineering services firm will provide design services, technical specifications, working drawings, cost estimates, as-built drawings, construction period services, and site visits.
- The contract is set-aside 100% for Service-Disabled Veteran-Owned Small Businesses under NAICS code 541330, with a $25.5 million small business standard.
- Submissions must include a Standard Form 330 and other required documents by 4:00 PM on December 10, 2024. The expected magnitude of construction is $2,962,701.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 004 TP01 CAD DELIVERABLES.pdf | ||
| 36C24425R0026.docx | DOCX document | |
| 003 TP01 ALERTCOS.pdf | ||
| 01 00 00 General Requirements.pdf | ||
| 002 01 33 23 Shop Dwgs Data and Samples.pdf | ||
| SCA 2015-4221 7.22.24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fire Protection Outline
Signature of Person(s) Completing Outline: Date:
Phone Number:
1.0 GENERAL
1.1 Total Project Cost:
1.2 Design Stage (%) :
1.3 What NFPA 101 Life Safety
Code Edition is being utilized?
1.4 Identify any existing
equivalencies for the space/building (FSES, standard, JCAHO). (See Chief Engineering)
1.5 Identify the type of
construction (NFPA 220).
1.6 Identify the primary
occupancy.
1.7 Identify (location and
type) any sub-occupancies.
1.8 Identify any fire rated
occupancy separations.
2.0 EGRESS
2.1 Identify the number of
exits per floor/space.
2.2 Identify the number of
horizontal exits utilized.
2.3 What is the occupant load
(per zone/ floor/ space)?
2.4 Where and what is the
maximum travel distance?
(Per floor)
2.5 Where and what is the maximum dead end? (Per
floor)
2.6 Where and what is the
maximum common path of travel? (Per floor)
2.7 Identify exit discharge
protection from the weather and that it leads to a public way.
2.8 Identify the location of
all power operated doors.
2.9 Identify which rooms
require egress through an intervening room before accessing a corridor.
2.10 Identify which rooms and
or suites are:
2.10.1 Used for an assembly
type Occupancy that are > 750 sq. ft.
2.10.2 Used for patient sleeping > 1000 sq. ft.
2.10.3 Used for other than
patient sleeping > 2500 sq.ft.
3.0 VERTICAL OPENINGS
3.1 What is the fire
resistive rating of the vertical opening enclosures? (All shafts including chutes)
3.2 What is the fire
resistance rating of the vertical opening protective devices?
4. 0 - HAZARDOUS AREAS
4.1 Identify the hazardous
areas (BY room) that require one hour fire resistance construction and 45 minute rated doors.
4.2 Identify the hazardous
areas (By room) that require floor to floor smoke resistant construction and self closing doors.
4.3 What is the NFPA 99
classification of the laboratory(s) per NFPA 99 NFPA 45 (Severe, Standard) or NFPA 45 (At B, C)?
5. 0 SMOKE ZONE DIMENSIONS
5.1 How many smoke zones are
shown on the drawings per floor.
5.2 Identify the total square
footage of each of the smoke zones.
5.3 Identify the square
footage required for the area of refuge for the occupants of each smoke zone.
5.4 What is the maximum
travel distance to a smoke barrier door in each smoke zone.
6.0 CORRIDOR WALLS AND PARTITIONS
6.1 Identify the fire
resistance rating of the corridor partitions.
6.2 Identify all spaces which
are open to the corridor and the code reference which permits this.
7.0 HVAC
7.1 What edition of NFPA 90A
is being utilized?
7.2 Identify where systems
other than fully ducted systems are used.
7.3 Identify HVAC drawings
where smoke dampers are installed.
7.4 Identify where automatic
shut down features are shown, including the detectors, for AHU's > 2,000 cfm.
7.5 Identify any shafts
enclosing environmental air ducts which also serve duct work other than environmental air.
(Vapors, fume, etc.)
7.6 If laboratories are NFPA 45 Ed.
addressed in this project, what code and NFPA 99 Ed.
edition is being utilized?
7.7 Identify any locations on
the drawings where ventilation systems involve anesthetizing locations.
7.8 Identify any locations an
the drawings where cooking equipment is installed.
7.9 What edition of NFPA 96
is being utilized?
8.0 PLUMBING (Medical Gases)
8.1 Identify the drawings
that show the location of any medical gas riser and sectional valves.
8.2 Identify the drawings
that show the location of the medical gas hiqh/low pressure alarm systems.
9.0 SPRINKLERS/STANDPIPES
9.1 What edition of NFPA 13
is being utilized?
9.2 Where is the point of
connection to the water supply for fire protection?
9.3 What is the available
fire protection water supply? (Static pressure, residual pressure, capacity.) What is the source and date of the water supply information.
9.4 Where is it shown that
the sprinklers are coordinated with the smoke and fire alarm zones?
9.5 Identify locations where
any special systems are used. (Preaction, dry-pipe, antifreeze, etc..)
9.6. It is expected that
sprinklers will be installed throughout the facility. Identify any areas in this proj act where sprinklers will not be installed. (Crawl spaces etc..)
9.7 Identify locations on the
drawings where the sprinkler system drains terminate.
9.8 Where combined sprinkler
and standpipe systems are utilized, identify on the drawings the location of the riser isolation valves?
10. 0 ELECTRICAL
10.1 What edition of NFPA 70
is being utilized?
10.2 What edition of NFPA 99
is being utilized?
10.3 Are all circuits in this
building (essential and non essential) supplied by the emergency generator?
10.4 What in the total load on
the emergency generator?
10.5 What is the nameplate
rating of the emergency generator?
10.6 Identify the drawings
which show that the following items are an the life safety branch of the essential electrical system: Exit Signs, illumination of means of egress,, alarm and alerting systems , communication systems, generator set location, and elevator controls/signals.
10.7 Identify the location of
the GFCI circuits.
11.0 FIRE ALARM
11.1 What edition of NFPA 72
is being utilized?
11.2 Identify where it is
shown that the fire alarm zones are coordinated with the smoke and sprinkler zones.
11.3 Identify all types and
areas covered by each type of occupant notification signal(s) provided? (General evacuation/coded/voice)
11.4 Where in the documents is
the interface between the fire alarm system and the following systems provided:
11.4.1 Sprinkler (tamper, pump, flow switches)
11.4.2 Cooking hood
11.4.3 HVAC (detectors, shut-down
11.4.4 Elevator control
11.4.5 Door release
11.4.6 Power operated door
11.5 Where is the point of
connection to the existing fire alarm system?
11.6 What type of fire alarm
system exists? (Mfg., Model No.s of panels, initiating and audible devices.)
11.7 Identify location, other
than at smoke barrier doors and elevator lobbies, where smoke detectors are provided?
11.8 Identify location where
heat detectors are provided?
12.0 OPERATING FEATURES
12.1 Identify where in the
documents on phasing, the fire alarm fire suppression/standpipes, and means of egress are maintained,, put into operation, or otherwise affected.
12.2 What interim life safety
measures as required by the JCAHO have been established?
12.3 What drawings show the
locations of the fire extinguishers?
13. 0 SPECIFICATIONS
13.1 Identify where the class
of the interior finish for the exits and corridors is noted.
13.2 Identify where the class
of interior finish for rooms is noted.
13.3 Are the specifications
tailored to this project?
13.4 Have the dates been
updated in all specification sections for the applicable publications?
End
October 31, 2000 SAMPLE LETTER
COR
Fire Protection Outline--Directions
Architectural/Engineering Firm
1. The following directions are provided to assist the A/E in providing responses to the Fire Protection Outline.
2. Where the outline states to "identify" you are asked to direct the reviewer to the appropriate drawings and specification sections which will completely answer the statement or question.
Some questions ask for specific room number locations.
3. It is intended that you write the answers in the space provided. This form should be reproduced and multiple forms used in those circumstances where the questions look for answers on a per floor or per building basis and one form would not adequately handle the responses.
4. Where there are questions concerning subject matter which is not part of the project, simply place not applicable (NA) in the space provided.
S. After the outline is completed, the A/E shall have the appropriate personnel sign and date the outline and provide a phone number in the space provided.
6. If there are any questions as to the outline content, please contact the COR.
COR
FIRE AND SAFETY PROJECT REVIEW REPORT ATTACHMENT
Review By: Peter A. Larrimer, RSFPE Phone No: (412) 365-5466 Date: October 31, 2000 Page - 1 Facility: Altoona Project Title (%): This is a space for 165 characters of title. The font for the Date on Dwgs:
headings are CG Times (scalable) 12 pt and sized (ctr-F8) Project No: 503-01-101 superscripted. The line spacing is .75". October 31, 2000
ITEM NO: MANDATORY COMMENTS (* Indicates Advisory Comments) RESOLUTION (Provided by MC or A /E)
*93-1* This is a sample of the output from an eastern region project review report along with the type of font used. The type of font used in the header is critical although the type used for ones' individual comments is arbitrary. This in courier 12 cpi.
93-2 I have used call lack (function in the table settings) to allow the heading to be used s a fill in type form which protects the spaces which should not be changed such as "Review By:” etc.
93-3 The font used for the Item No, Mandatory Comments and RESOLUTIONS is cg times (scalable) 12 pt bold and a bold attribute. The Eastern Region… too.) Items in parenthesis are italicized.
SAMPLE
File details come from the government source that posted it. Updated .