005-RFB-2942-2027 - MPCF Building 20 Automated Valve Refit.pdf
PDF 226 KB Posted
- Solicitation number
- 005-RFB-2942-2027
- Issued by
- Harrison County, Iowa
About this file
This is a Request for Bids (RFB) issued by the Iowa Department of Administrative Services for welding and mechanical services at the Mount Pleasant Correctional Facility. The project involves retrofitting Building 20 at the facility with new automated valves to heat the MLO Building, which houses approximately 100-150 minimum security incarcerated individuals. The scope of work includes demolition and removal of existing steam pressure-reducing valves and associated piping, fabrication and installation of a new 4-inch steam header with six 2-inch threaded outlets, installation of new 2-inch steam actuated valves, installation of a 4-inch steam relief line routed to the building exterior, water heater steam tie-in work, testing and commissioning of all components, and provision of as-built drawings and documentation. A site visit is scheduled for Monday, August 11th, 2026 at 11:30 a.m. Central Time at the facility located at 1200 East Washington Street, Mount Pleasant, Iowa 52641, though attendance is not mandatory. Work commencement begins upon receipt of the fully executed contract, with completion occurring upon agency acceptance of testing and commissioning and delivery of the invoicing package.
The RFB requires bidders to provide all supervision, labor, materials, tools, equipment, and transportation necessary to complete the work in compliance with applicable codes and standards. All work must meet mechanical code requirements and comply with the Siemens drawing specifications provided by the owner. The contract includes a one-year warranty period from service commencement, during which the contractor must repair or replace any defective materials or workmanship at no additional cost to the agency. Bidders must submit an Exceptions Form identifying any deviations from the RFB requirements. The document does not specify a bid due date, award date, or pricing structure in the provided content.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 005-RFB-2942-2027 - Addendum 2.pdf | ||
| 005-RFB-2942-2027 - Drawing.pdf | ||
| 005-RFB-2942-2027 - Addendum 1.pdf | ||
| 1418681-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
005-RFB-2942-2027 – MPCF - Building 20 Automated Valve Refit
1 | P a g e
005-RFB-2942-2027
Mount Pleasant Correctional Facility Building 20 Automated Valve Refit
SECTION 1 – INTRODUCTION
1.1 Background Information
This RFB is designed to provide Bidders with the information necessary for the preparation of competitive Bids. The RFB process is for the Lead Agency’s and Participating Agencies’ benefit and is intended to provide the Lead Agency with competitive information to assist in the selection process. It is not intended to be comprehensive. Each Bidder is responsible for determining all factors necessary for submission of a comprehensive Bid.
The Iowa Department of Administrative Services (DAS) is soliciting bids to provide welding services to refit Building 20 at the Mount Pleasant Correctional Facility (MPCF) with new automated valves to heat the MLO Building (which houses around 100-150 minimum incarcerated individuals).
MPCF is located at 1200 E Washington St., Mt Pleasant, IA. 52641. The facility spans approximately 152 acres and is a minimum-security facility focused on re-entry, cognitive-behavioral programming, and community integration.
1.2 Contract Term
Commencement of the Work of the Contract shall be the day of receipt by the selected Contractor of the fully executed contract. Completion of the Work of the contract shall follow Agency acceptance of testing and commissioning of the valves and the invoicing package has been delivered.
1.3 Site Visit
A site visit will be conducted for this solicitation. The meeting location(s), date(s), time(s), and directions are provided below.
While the site visit is not mandatory, it is highly encouraged.
Date: Monday, August 11th, 2026 Time: 11:30am CT Location: Mount Pleasant Correctional Facility Address: 1200 E Washington St. Mt Pleasant, IA. 52641 (Directions may be requested if needed)
2 | P a g e
Section 2 - Scope of Work - Steam Valve and Piping Rework Project
All items listed in this Section are Bid Specifications. A successful Bidder must be able to satisfy all these specifications to be deemed a Responsible Bidder.
2. Dormitory Basement
The Contractor shall provide the following:
2.1. General Requirements
The Contractor shall provide all supervision, labor, materials, tools, equipment, and transportation necessary to complete the rework of steam reducing valves, associated piping, and actuated valves located in the basement of the dormitory. All work shall comply with applicable codes, standards, and the Owner’s requirements.
The Contractor shall verify all dimensions and field conditions prior to initiating work. Any discrepancies shall be reported to the Owner before proceeding.
2.2. Demolition and Removal
Remove all existing steam pressure-reducing valves (PRVs), associated piping, fittings, actuated valves, and related components.
Dispose of all removed materials in accordance with local, state, and federal regulations.
Protect existing adjacent systems and structures from damage during demolition.
2.3. Installation of New Steam PRV Station
Construct a new steam PRV station along the designated wall as shown in the Siemens drawing provided by the Owner. The Contractor shall reference the specific drawing number and revision.
Provide all supports, brackets, anchors, and accessories required for a code-compliant installation.
2.4. Steam Header Fabrication
Fabricate and install a new 4-inch steam header. Weld six (6) 2-inch threaded outlets (thread-o-lets) into the header, providing connection points for six (6) new 2-inch steam actuated valves. Ensure all welds meet applicable welding codes and standards. Testing certificates shall be provided upon request.
2.5. Relief Piping Installation
Install a new 4-inch steam relief line routed to the building exterior.
Create wall penetrations as required, including coring or drilling.
Seal the penetration to maintain building envelope integrity, including weatherproofing, fire rating, and insulation as applicable.
3 | P a g e
2.6. Valve Installation and Maintenance Provisions
Install unions and isolation valves on both the inlet and outlet sides of each reducing valve and automatic valve. Ensure valves are installed in accessible locations to allow for future maintenance and inspection.
2.7. Piping Supports
Support all new piping from the ceiling using appropriately rated hangers and support systems. Ensure supports comply with mechanical codes, manufacturer requirements, and Owner standards.
2.8. Water Heater Steam Tie-In
Tie the water heater into both the high-pressure and low-pressure steam systems.
Install new isolation valves on each connection.
Rework piping as needed to establish a clean, functional, and code-compliant layout.
2.9. Steam Backfeed Re-Integration
Reincorporate the existing steam backfeed piping as currently configured unless otherwise noted by the Owner. Ensure compatibility with the new PRV station and steam header layout.
2.10. Testing and Commissioning
Perform pressure testing, leak testing, and operational testing of all new steam piping, valves, and components. Coordinate with Siemens or the facility’s controls vendor for integration and functionality checks of all actuated valves. Demonstrate proper steam pressure reduction, valve operation, relief line function, and system performance to the Owner.
2.11. Documentation and Close-Out Requirements
The Contractor shall provide:
As-built drawings reflecting all final piping and valve configurations.
Manufacturer data sheets and O&M manuals for all newly installed valves, actuators, and components. A written commissioning report documenting all tests performed and results obtained. A clean and orderly work area upon completion, including removal of debris and restoration of any affected surfaces.
2.12. Warranty
Bidders shall warranty all work performed under this contract award for a period of one (1) year from service. If during that one (1) year period of warranty, any part installed under the contract fails or does not function properly due to any fault in material or workmanship, the Bidder shall, under notice from the Agency representative, promptly proceed to repair or replace the faulty item without the Agency incurring any additional expense. If the Bidder fails to repair or replace the faulty item within a reasonable time after notice, the Agency may hire another vendor to repair or replace the faulty item and charge the cost to the Bidder.
4 | P a g e
Attachment 1 Exceptions Form
Please list any and all exceptions to this RFB in this section. Include section and reason for exception:
(Make additional pages if necessary)
Section Exception
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
| 005-RFB-2942-2027 |
| Mount Pleasant Correctional Facility |
| Building 20 Automated Valve Refit |
| SECTION 1 – INTRODUCTION |
| Section 2 - Scope of Work - Steam Valve and Piping Rework Project |