00245-2AS271 ED Ramp South Side.pdf
PDF 2 MB Posted
- Solicitation number
- 629-25-4-8563-0225
About this file
This architectural engineering drawing set depicts exterior elevations for a VA medical facility project focusing on emergency department (ED) exterior spaces, specifically ramps, decks, blast doors, and canopy areas. The drawings are part of a suicide mitigation project for the Veterans Health Administration (VISN 16), featuring detailed elevations of Building 02 with multiple view perspectives including South, East, and North facing sides.
The technical drawings include specific architectural details such as precast concrete bollards (specification 03 48 13), blast pressure area considerations, and ramp configurations. Numerous Request for Information (RFI) notations are present, indicating design modifications including changes to bollard materials (from precast to steel), door swing configurations, opening heights, and security-related adjustments. The drawings were prepared by multiple consulting engineering firms including Schrenk & Peterson, KORDA/NEMETH Engineering, and BR+A Consulting Engineers, with the document dated January 25, 2013, and bearing the project code R2AS271 for the VA Office of Construction and Facilities Management in New Orleans, Louisiana.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02-L1
100' - 0"
02-L2
119' - 0"
ED
F
ED
G
ED
H
EDIED J
ED
K
ED
L
ED
M
ED
N
ED
O
PRECAST CONCRETE BOLLARDS
03 48 13
02-L1
100' - 0"
02-L2
119' - 0"
ED
D
ED
C
ED
F
02-L2
119' - 0"
02-L3
138' - 0"
02 5 02 7
3.7 02 6
ED
2.1
ED
3.3
ED
4.7
ED
5.9 02 8
R2AS272
_______________ 2
R2AS272
02 4
D1
R0AS560
BLAST PRESSURE
AREA: E
02-L1
100' - 0"
02-L2
119' - 0"
02-L1
100' - 0"
02-L2
119' - 0"
02-L3
138' - 0"
02 H
ED
B
ED
A
EJ
2.5
/2
/2
02-L2
119' - 0"
3.2
3.3 02 4
11' - 0" 13' - 11"
EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ14' - 11 3/8"
SL
G
-3 T
YP
D5
R0AS560
E5
R0AS560
E1
R02AS584
C1
R02AS584
D1
R02AS584
SL
G
-2 T
YP
D4
R0AS560
BLAST PRESSURE
AREA: ED VESTIBULE
02-L2
119' - 0"
F.9
SL
G
-2 T
YP
BLAST PRESSURE
AREA: ED VESTIBULE
NOTE: DOOR IS PERPENDICULAR
TO BLAST PRESSURE AND CAN BE
STANDARD SLIDING PACKAGE
DOOR
E-E2-176.2
02-L2
119' - 0"
02 7
7.5
15' - 2"
EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ
D1
R02AS584
C1
R02AS584
E1
R02AS584
SL
G
-3 T
YP
BLAST PRESSURE
AREA: ED VESTIBULE
14' - 9 3/4"
EQ EQ EQ EQ EQ EQ EQ
BOTTOM OF EWP08
GYP BD
TOP OF GLAZING
(8'-0" AFF)
NON-BLAST RATED EXTENSION OF ALUMINUM AND LAMINATED
GLASS (SLG-1) PARTITION BY EWP06 CURTAIN WALL SUPPLIER
G2
F2
E2
D2
G1
F1
E1
D1
PLAN
NORTH
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
T E
R
IN
C H
O
N E
FO
O
T O
N E
H
AL
F I N
C H
O
N E
FO
O
T
TH
R
EE
Q U
A R
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
EE
T
( 1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
XT
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
E S
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
R2AS271
BLDG. 02 - ED DECK EXTERIOR ELEVATIONS
DV JGJanuary 23, 2013
02629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL
KORDA/NEMETH ENGINEERING / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECTURAL ENGINEERING / PLUMBING
SCALES ASSOCIATES / FIRE PROTECTION
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS, INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
HAMMER DESIGN ASSOCIATES / FOOD SERVICE
PYBURN & ODOM / ABATEMENT
TATA & HOWARD / TANK CONSULTANT
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
EWP_06
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"
ELEVATION SOUTH AREA F.3 - ED RAMPELEVATION SOUTH AREA F.3 - ED RAMPELEVATION SOUTH AREA F.3 - ED RAMPELEVATION SOUTH AREA F.3 - ED RAMP1111
SCALE: 1/8" = 1'-0"
ELEVATION SOUTH AREA F.3 - ED DECKELEVATION SOUTH AREA F.3 - ED DECKELEVATION SOUTH AREA F.3 - ED DECKELEVATION SOUTH AREA F.3 - ED DECK2222
MATERIAL TYPESMATERIAL TYPESMATERIAL TYPESMATERIAL TYPES
GLAZING TYPESGLAZING TYPESGLAZING TYPESGLAZING TYPES
SYMBOLS LEGENDSYMBOLS LEGENDSYMBOLS LEGENDSYMBOLS LEGEND
INSULATED LAMINATED
VISION
METAL PANEL (MP-2 EXTC-1)
PRECAST
EXTERIOR MATERIALS LEGEND
DIMENSION NOTES
1. ALL DIMENSION STRINGS FROM C/L OF JT. TO C/L OF JT.
EXCEPT AT ENDS OF EXTERIOR WALL & U.N.O.
2. REFER TO PLANS FOR CW. VERT. FRAMING LOCATIONS.
REFER TO ELEVATIONS FOR FRIT PATTERN EXTENT
3. REFER TO PLANS FOR WINDOW LOCATIONS IN METAL
PANEL & PRECAST SYSTEMS. REFER TO ELEVATIONS FOR
LOCATIONS OF JOINTS IN THESE SYSTEMS.
4. REFER TO PLANS FOR MP SYSTEM LOCATIONS WITH
C.M.U BACKUP.
INSULATED LAMINATED SPANDREL
MECHANICAL LOUVER. SEE NOTE FOR
ACTIVE LOUVER DIM. REFER TO F2/R0AS540
FOR TYPICAL DETAILS AT LOUVERS
O.D OVERFLOW DRAIN (SECONDARY)
O.S OVER FLOW SCUPPER
M.E.P. FP PENETRATIONS THROUGH
ENCLOSURE
LIGHTING OVER EXIT
PRECAST (PC) REPEATING JOINT
PATTERN TYPE INDICATOR. SEE SHEET
OAS5__ FOR PATTERN TYPES
TYPICAL DETAILS LEGEND
X
STUCCO / E.I.F.S (SEE NOTE ON ELEV.)
METAL PANEL (MP-1A EXTC-1)
IG-01 INSULATED LAMINATED VISION
IG-01-T INSUL. LAMINATED VISION TEMPERED
IG-01T-IB INSUL. LAMINATED VISION SAFETY W/
INTERIOR VISION CONTROL GLASS UNIT
IG-01DT-IB SAME AS IG-01T-IB, EXCEPT LAMINATED
GLASS ON INT. AND EXT. SIDE OF I.G.U
SG-01 INSUL. LAM. SPANDREL MED. GRAY
SG-01-T INSUL. LAM. SPANDREL TEMPERED
SG-02 INSUL. LAMINATED SPANDREL WHITE
SG-03 INSUL. LAMINATED SPANDREL BLACK
SLG-01 SAFETY IMPACT LAMINATED GLAZING
LGS-1 LAMINATED GLASS SPANDREL
DETAIL MARK REFER TO SHEET
B-#
IC-#
OC-#
P-#
AREAS OF SOLID REINFORCED
CMU WALL
METAL PANEL (MP-2 EXTC-2)
METAL PANEL (MP-1 EXTC-2)
R0AS520
R0AS521
R0AS522
R0AS524
BASE
INSIDE CORNERS
OUTSIDE CORNERS
PARAPETS
SCALE: 1/8" = 1'-0"
ELEVATION EAST AREA D.3 & E.3 - ED CANOPYELEVATION EAST AREA D.3 & E.3 - ED CANOPYELEVATION EAST AREA D.3 & E.3 - ED CANOPYELEVATION EAST AREA D.3 & E.3 - ED CANOPY3333
SCALE: 1/8" = 1'-0"
ELEVATION EAST AREA E.3 & F.3 - ED DECKELEVATION EAST AREA E.3 & F.3 - ED DECKELEVATION EAST AREA E.3 & F.3 - ED DECKELEVATION EAST AREA E.3 & F.3 - ED DECK4444 SCALE: 1/8" = 1'-0"
ELEVATION SOUTH AREA E.3 - ED DECKELEVATION SOUTH AREA E.3 - ED DECKELEVATION SOUTH AREA E.3 - ED DECKELEVATION SOUTH AREA E.3 - ED DECK5555
SCALE: 1/8" = 1'-0"
ELEVATION EAST AREA D.2 - ED BLAST DOORSELEVATION EAST AREA D.2 - ED BLAST DOORSELEVATION EAST AREA D.2 - ED BLAST DOORSELEVATION EAST AREA D.2 - ED BLAST DOORS6666
SCALE: 1/8" = 1'-0"
ELEVATION NORTH AREA E.3 - ED BLAST DOORSELEVATION NORTH AREA E.3 - ED BLAST DOORSELEVATION NORTH AREA E.3 - ED BLAST DOORSELEVATION NORTH AREA E.3 - ED BLAST DOORS7777 SCALE: 1/8" = 1'-0"
ELEVATION EAST AREA E.3 - ED BLAST DOORSELEVATION EAST AREA E.3 - ED BLAST DOORSELEVATION EAST AREA E.3 - ED BLAST DOORSELEVATION EAST AREA E.3 - ED BLAST DOORS8888
CONC. PIERS @ INTERIOR
FOR BLAST
6 BULLETIN 010C 01/23/2013
9 BULLETIN 010F 05/07/2013
12 BULLETIN 10J 12/20/2013
RFI 08232: Conflict between door swing and column is non-issue
RFI 08232: Conflict between door swing and column is non-issue
RFI-1276, Blast Door opening dimensions to be issued in a future bulletin
RFI 01347 Opening Heights
RFI 01347 Opening Heights RFI 01421.1
- Glass Type
RFI 01421.1
- Glass Type
RFI 01421.1
- Glass Type
RFI 3806: Non-rated Removable Security Bollards
RFI 04189: Location of Signage is 105' from end of ramp
RFI 4032: Bollard to be steel in lieu of precast.
RFI 06104: canopy roof termination details at window
RFI 07830: Provides typical base of column details
RFI 08330: Columns to be stucco on all sides
RFI 08330: Removes bullnose
RFI 07940.1: Install wireway behind emergency letter on canopy face.
File details come from the government source that posted it. Updated .