0005_ANAD_ALIN Structure_May_26_2026.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- Not on record
About this file
This file is an ALIN (Appropriations Line Item Number) structure spreadsheet detailing the cost breakdown for the Anniston Army Depot (ANAD) FORGE II Military Construction (MILCON) project. The project encompasses four primary construction initiatives with fixed-price (FFP) contracts: the Component Remanufacturing Facility (CRF) totaling $487.6 million (design: $49.5 million, construction: $438.1 million); the Guided Missile Maintenance Facility (GMMF) totaling $43.0 million (design: $4.4 million, construction: $38.6 million); the Vehicle Paint Shop totaling $68.5 million (design: $6.95 million, construction: $61.5 million); and the Storage Facility totaling $59.1 million (design: $6.0 million, construction: $53.1 million). The base MILCON total is $658.2 million.
The spreadsheet also identifies two optional categories: Restoration & Modernization (R&M) Projects valued at $87.7 million, which include water distribution system upgrades, building repairs, HVAC system replacements, rooftop fall protection, and stormwater control improvements across multiple facilities; and Optional Equipment totaling $241.0 million, comprising equipment for the CRF ($110.0 million), Vehicle Paint Shop ($85.0 million), Guided Missile Maintenance Facility ($32.0 million), and welding facility ventilation systems ($14.0 million). The total project value across all categories is approximately $986.9 million to $1.64 billion. This structure supports the formal Request for Project Proposals (RPP W91QEY-26-R-A002) issued through Other Transaction Authority (OTA), with industry proposals due June 29, 2026, and a mandatory site visit scheduled for June 10, 2026.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALIN Structure Anniston Army Depot (ANAD) Forge II ALIN Structure
| ALIN | Sub-ALIN | Type | IJO # | Title | Design Price | Construction Price | Price |
| 0001 | FFP | Component Remanufacturing Facility (CRF) | |||||
| 000101 | CRF Design | $ 49,500,000.00 | $ 49,500,000.00 | ||||
| 000102 | CRF Construction | $ 438,075,000.00 | $ 438,075,000.00 | ||||
| ALIN 0001 Total | $ 487,575,000.00 | ||||||
| 0002 | FFP | Guided Missile Maintenance Facility (GMMF) | |||||
| 000201 | GMMF Design | $ 4,400,000.00 | $ 4,400,000.00 | ||||
| 000202 | GMMF Construction | $ 38,640,000.00 | $ 38,640,000.00 | ||||
| ALIN 0002 Total | $ 43,040,000.00 | ||||||
| 0003 | FFP | Vehicle Paint Shop | |||||
| 000301 | Paint Facility and Staging Area Design | $ 6,950,000.00 | $ 6,950,000.00 | ||||
| 000302 | Paint Facility and Staging Area Construction | $ 61,508,000.00 | $ 61,508,000.00 | ||||
| ALIN 0003 Total | $ 68,458,000.00 | ||||||
| 0004 | FFP | Storage Facility | |||||
| 000401 | Storage Facility Design | $ 6,000,000.00 | $ 6,000,000.00 | ||||
| 000402 | Storage Facility Construction | $ 53,100,000.00 | $ 53,100,000.00 | ||||
| ALIN 0004 Total | $ 59,100,000.00 | ||||||
| ANAD FORGE II MILCON TOTAL | $ 658,173,000.00 | ||||||
| 0005 | Optional Restoration & Modernization (R&M) Projects | ||||||
| 000501 | FFP | Water Distribution System (Water Supply to Secondary Utility) | $ 4,000,000.00 | ||||
| 000502 | FFP | Repair Building 513, Combat Vehicle Parts, Storage & Supply Facility | $ 2,000,000.00 | ||||
| 000503 | FFP | Repair Building 513A, EA Combat Vehicle Parts, Storage and Supply Facility | $ 3,300,000.00 | ||||
| 000504 | FFP | Repair Bldg. 524 Chemical Storage Facility | $ 5,600,000.00 | ||||
| 000505 | FFP | Repair Storage Igloos (THAAD) Qty 10 TOTAL | $ 7,250,000.00 | ||||
| 000506 | FFP | Repair Igloos (Convert from Single Door to Double Doors) 10 TOTAL | $ 4,700,000.00 | ||||
| 000507 | FFP | Repair Bldg. 108 Roof, Machine Shop | $ 2,782,417.00 | ||||
| 000508 | FFP | Repair Bldg. 416, Vehicle Maintenance Facility | $ 3,300,000.00 | ||||
| 000509 | FFP | Repair Maintenance for Electrical Distribution and Substations | $ 750,000.00 | ||||
| 000510 | FFP | Rooftop Fall Protection – Phase V | $ 2,459,309.00 | ||||
| 000511 | FFP | Building 8 Makeup Air Unit | $ 1,400,000.00 | ||||
| 000512 | FFP | Power Pole Repair/Replacement Phase II | $ 2,000,000.00 | ||||
| 000513 | FFP | Repair Building 58, Surveillance Workshop | $ 1,100,000.00 | ||||
| 000514 | FFP | Repair Bldg. 425 HVAC & Insulation- Why mission essential? | $ 750,000.00 | ||||
| 000515 | FFP | Repair Building 669 MLRS Administrative Facility | $ 850,000.00 | ||||
| 000516 | FFP | Repair Outload Pads | $ 1,500,000.00 | ||||
| 000517 | FFP | Repair Building 434, EA Combat Vehicle Welding Facility | $ 14,000,000.00 | ||||
| 000518 | FFP | Repair Stormwater/Erosion Control at Open Detonation Unit | $ 11,000,000.00 | ||||
| 000519 | FFP | Repair Bldg. 474, Replace Rooftop HVAC (Get more details on cost) | $ 19,000,000.00 | ||||
| ALIN 0005 Total | $ 87,741,726.00 | ||||||
| 0006 | Optional Equipment | ||||||
| 000601 | FFP | Equipment - Component Remanufacturing Facility (CRF). | $ 110,000,000.00 | ||||
| 000602 | FFP | Equipment - Vehicle Paint Shop | $ 85,000,000.00 | ||||
| 000603 | FFP | Equipment - Guided Missile Maintenance Facility | $ 32,000,000.00 | ||||
| 000604 | FFP | Equipment - Weld Bay Down Draft Ventilation & Central Vacuum Systems for Repair Bldg 434, Combat Vehicle Welding Repair Facility. | $ 14,000,000.00 | ||||
| ALIN 0006 Total | $ 241,000,000.00 | ||||||
| ANAD Forge II Total | $ 986,914,726.00 | ||||||
| $ 1,644,398,178.00 |