J-2 Site & Facility Drawings Daegu.pdf

PDF 3 MB Posted

Attached to
Total Maintenance Services Contract, Department of
Solicitation number
0003
Issued by

About this file

This is an amendment to a solicitation for a total maintenance services contract from the Department of the Army Corps of Engineers Engineering District Far East. The amendment does not provide any additional details on the products or services required under the contract. It references Amendment 0003 but does not include the substance of that amendment.

View the file

Other files

File Type Posted
W912UM19R0021 Amend 3.pdf PDF
J-2 Daegu AS drawings.pdf PDF
J-2 Daegu MHS Drawings.pdf PDF
J-2 Daegu_MHS_FY18_00065.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91236-17-C-0021 Daegu American School - Date of Assessment: 4-Apr-2018

3-Aug-2018

Daegu American School Facility Condition Assessment Report

I. INTRODUCTION

Daegu American School is located at USAG Daegu and Area IV, Camp Henry, South Korea. This report provides a summary of findings for the physical condition assessment of buildings at this campus. The physical condition assessment includes a general description of typical building systems found and includes conditions present at the time of the site visit.

CAMPUS SUMMARY

Year Built¹ 1983-2008

GSF² 98,256

Date of Assessment 4-Apr-2018

¹ Indicates range of dates of construction present on campus ² Only permanent and semi-permanent facilities are included

SCHOOL SUMMARY

School Assessed

Condition Annual

Condition Report (Jun 2017)

Congressional

Starting Grade

Ending Grade

Students

Q-Rating FCI Q-Rating FCI Q-Rating

Daegu American School Q-2 87 Q-3 78 Q-4 Sure Start Age 4

Fifth 367

BUILDING SUMMARY

Building/School

Year Built

GSF

Type

Daegu American School Bldg 3000 1983-2008 70,781 PERM

Daegu American School Bldg 3008 1986 1,191 PERM

Daegu American School Bldg 3013 2002 1,890 PERM

Daegu American School Bldg 3018 2006 2,616 PERM

Daegu American School Bldg 3019 2008 21,563 PERM

Daegu American School Bldg Storage 1995 215 SEMI

II. SCHOOL PHYSICAL DESCRIPTION

The summary below provides a physical description of the school. When multiple systems or materials are present, the predominant system or material observed during the facility condition assessment is shown.

a. STRUCTURAL/EXTERIOR ENCLOSURE: The building exterior is an exterior insulation and finish system (EIFS). Roof coverings are modified bitumen. Exterior doors are metal with glazing. Window systems are pre-finished aluminum with single-glazing.

b. INTERIORS: Floor finishes used include resilient sheeting and carpet. Walls are painted hard surfaces.

Ceilings are acoustical lay-in tiles.

c. MECHANICAL: Campus facilities have heating, which is provided by boilers. All campus facilities have air conditioning, which is provided by chilled water. The campus has two elevators.

d. ELECTRICAL: No electrical upgrades have been completed and most wiring appears to be original. Lighting is typically lay-in fixtures with fluorescent lamps. Ground-fault circuit interrupter (GFCI) receptacles appear to be present in required locations. The campus has an intercom system. There is a security system and security cameras are present.

e. PLUMBING: Plumbing fixtures and piping are original. Domestic hot water is provided by gas-fired storage water heaters.

f. SITE: The school has parking for approximately 49 privately owned vehicles. In addition, the school has two playgrounds.

g. LIFE SAFETY: A fire safety inspection report was not available for review.

III. OBSERVATIONS

The following observations were made: It appears that outside air is being introduced into the HVAC system.

Exterior door security was not observed or reported to be a problem. The roof on Building 3008 is in disrepair and needs to be replaced. Buildings X3000N and X3000P have been removed from the site since the time of the last visit. Buildings 3210, X3210A, X3210B, and X3210C were turned over to the base and are closed. There were some changes to the floor plan drawings noted since the last visit that necessitate alteration of the current drawing files. There was no incidence of shared spaces or partial use in buildings reported or noted.

Building 3000 improved from a Q-3 to a Q-2 at the time of assessment. Since the time of the previous assessment portions of the exterior enclosure, roofing, interior finishes, HVAC, and electrical remain expired;

however, BUILDER requirements are lower than the previous cost model predicted.

Building 3008 improved from a Q-3 to a Q-2 at the time of assessment. Since the time of the previous assessment portions of the roofing, interior construction, HVAC, and electrical remain expired; however, BUILDER requirements are lower than the previous cost model predicted.

Building 3013 remained a Q-1.

Building 3018 remained a Q-1.

Building 3019 remained a Q-1.

Building Storage remained a Q-1.

IV. QUALITY / CONDITION RATINGS

Table 1 shows building-specific information to include Real Property Unique Identifier (RPUID), type of construction, year built, gross area, Facility Condition Index (FCI), and Q-Rating. Table 2 shows buildings that are classified as temporary (TEMP) or relocatable (RELO) and therefore, by definition, are not included in Quality/Condition calculations.

TABLE 1: QUALITY / CONDITION RATINGS

Assessed

Photo Building RPUID Type Year Built GSF FCI Q-Rating Plant Replacement Value 3

3000 254223 PERM 1983-2008 70,781 82 Q-2 $27,887,045

3008 254222 PERM 1986 1,191 82 Q-2 $469,243

3013 972169 PERM 2002 1,890 100 Q-1 $744,642

3018 972355 PERM 2006 2,616 96 Q-1 $1,030,679

3019 972362 PERM 2008 21,563 100 Q-1 $8,495,618

Storage SEMI 1995 215 92 Q-1 $40,570

The Plant Replacement Value is calculated according to the DoD Facility Pricing Guide.

TABLE 2: TEMPORARY / RELOCATABLE BUILDINGS

Photo Building Type Year Built GSF Current Use

X3000A RELO 1986 52 Container

X3000G RELO 1986 158 Container

X3000J RELO 1986 25 Storage Shed

X3000K RELO 1986 231 Walk-in Cooler

X3000M RELO 1986 320 Container

X3008A RELO 1986 320 Container

X3008B RELO 1986 158 Container

Appendix A

Site Plan

Appendix B

Overview of Sustainment Management System (SMS) and BUILDER™ Engineered Management System (EMS)

Overview of Sustainment Management System (SMS) and BUILDER™ Engineered Management System (EMS)

Sustainment Management System (SMS)

The Sustainment Management System (SMS) is a suite of web-based software applications developed by the United States Army Corps of Engineers - Engineer Research Development Center - Construction Engineering Research Laboratory (USACE-ERDC-CERL) to help facility engineers, technicians, and managers decide when, where, and how to best maintain the built environment. The SMS modules include BUILDER™ and ROOFER™ for assessing building conditions, PAVER™ for pavements, and RAILER™ for railroad infrastructure.

Because real property assets are so vast and diverse, a "knowledge-based" philosophy drives the SMS process.

The process starts with the automated download of real property data, and then more detailed system inventory is modeled and/or collected which identifies components and their key life-cycle attributes such as the age and material.

From this inventory, Condition Index (CI) measures for each component are predicted based on its expected stage in the life-cycle. Objective and repeatable inspections can then be performed on various components to verify their condition with respect to the expected life-cycle deterioration. The level of detail and frequency of these inspections are not fixed like other processes; they are dependent on knowledge of component criticality, the expected and measured condition and rate of deterioration, and remaining maintenance and service life. This "knowledge-based" inspection focuses attention to the most critical components at the time. In addition to these condition assessments, functionality assessments can be performed to evaluate user requirement changes, compliance and obsolescence issues. This provides a comprehensive picture of the overall performance of real property assets and their key components.

BUILDER Engineered Management System (EMS)

In September 2013, The Under Secretary of Defense, Frank Kendall, issued a memo indicating the Department of Defense requires a standardized process for facility condition assessments to ensure consistent and reliable data necessary for sound strategic investment decisions in managing the Department's built environment.

Establishing a DoD-wide facility condition assessment process will contribute to a more credible DoD asset management program and will support better buying power by allowing Department leadership to better target fiscal resources to those facilities most in need of investment. Further, adopting a standard process will help ensure that condition data will be audit-ready in accordance with Under Secretary of Defense (Comptroller)'s "Financial Improvement and Readiness Guidance" issued in March 2013.

The facility assessment process used to generate this report is based on BUILDER Engineered Management System (EMS) Version 3. BUILDER EMS was developed by the Engineer Research and Development Center.

The building assessment process addresses the requirements necessary for routine building facility management activities, including long range budgeting and sustainment/restoration/modernization (SRM) planning. This assessment approach provides an objective and generalized framework to help to identify problem areas that will require more investigation through detailed or specialized assessments. There may be times when detailed engineering assessments may be required to diagnose specific problems.

BUILDER is a software application for building asset lifecycle management. The primary focus of BUILDER is work plan development. BUILDER stores real property building information and more detailed system inventory is modeled and/or collected which identifies building components and their key life-cycle attributes such as the age, material and capacity. Inspections are then performed on the various components to determine an objective and repeatable Condition Index (CI) measure, which relates the general physical health of the asset.

With information about condition and remaining service life, BUILDER guides the development of short- and long-range work plans based on sound investment strategies, prioritization criteria, and budget constraints. BUILDER consolidates a variety of building-related management issues into a single decision-support package.

The system gives functional managers and decision-makers instant access to building inventory, current building condition indices, and probabilities condition prediction models. It also employs a patented knowledge-based inspection scheduling process. BUILDER improves the allocation process and return of building lifecycle investments by directing resources to the most condition critical components to avoid costly repair penalty costs, as well as the most mission critical components to manage risks of failure.

BUILDER Facility Condition Assessment Process

Facility Condition Assessment (FCA) is one of the primary processes of a facility life cycle asset management program. The FCA process results in a better understanding of the physical condition and readiness of an organization's buildings along with the reliability of its systems and components. It also facilitates the identification of work candidates for facility SRM repair projects. It is a critical aspect of the shift towards a proactive versus reactive facility management strategy. Instead of keeping facilities operational by relying primarily on corrective repairs (after a system or component has failed due to significant loss of function), it focuses on condition-based repairs which can be planned prior to failure. A condition-based approach can result in higher performing facilities at lower life-cycle costs.

Prior to an assessment, knowledge of the building systems and components present is necessary, since assessments are done against these components, not against the building as a whole. This information about the systems and components that make up a building is called the BUILDER Inventory. BUILDER has a vast library of predefined components which an assessor will select from, and the inventory collection process involves identifying the type, quantity, and year installed for all pertinent components. These components are also organized into systems and sub-systems according to the UNIFORMAT classification hierarchy. When a specific instance of a component is recorded, this is called a component-section in BUILDER, and represents a single component assembly or collection of like components to be managed as a single unit. The BUILDER facility condition assessment process directly supports the computation of a condition index for building component-sections, known as the Component-Section Condition Index (CSCI), which is the fundamental metric used in BUILDER. The CSCI is aggregated to compute a condition index metric at the system (SCI), building (BCI), and site/organizational levels.

A condition-based facility repair strategy requires condition information be collected at a component level, and that this condition information relate to loss of component function. Every component of a building has a primary function that it performs. This function is the reason that the component was constructed or installed in the building. It may also serve a number of secondary or tertiary functions. For example, for a door component, the primary function is to provide safe entry/egress of authorized movements while limiting unwanted movements of people (security), or other objects (water or moisture). The secondary functions would relate to aesthetics and thermal and air control, among others.

Over the course of a building component's life in service, it will likely experience a deterioration of its physical condition due to general aging, use in service, and exposure to a number of external or environmental factors.

This condition deterioration is manifested in distress(es) which adversely affect that component's current and future ability to perform its primary and/or secondary functions. These distresses include cracks, leaks, holes, corrosion, overheating, excessive vibration, animal/insect damage, as well as general deterioration or damage.

These distresses can be observed during a condition assessment process. As a result, the fundamental purpose of a condition assessment process is to measure (qualitatively and/or quantitatively) a component's ability to perform its required functions, considering the presence of accumulated distress.

There are two levels of the condition assessment process in BUILDER:

1. The Distress Survey involves the individual identification and recording of the type and nature of distresses observed for a component. The presence of these distresses recorded, in addition to the severity and density, results in a condition index metric, which directly relates to the level of condition deterioration, and indirectly to the loss of function due to this deterioration.

2. The Direct Rating method uses a single qualitative rating for each component based on condition observations (taking all distresses into account). This also results in a condition index metric, which relates to the level of deterioration and the loss of function. This abbreviated Direct Rating approach is often better suited to initial baseline assessments where the components are inventoried and data is initially loaded into BUILDER.

The following figure illustrates the Direct Rating criteria used in this assessment.

RATING SRM NEEDS RATING DEFINITION

Green (+)

Sustainment consisting of possible preventive maintenance (where applicable)

Entire component-section or component-section sample is free of observable or known distress.

Green Sustainment consisting of possible preventive maintenance (where applicable) and minor repairs (corrective maintenance) to possibly few or some subcomponents.

No component-section or sample serviceability* or reliability* reduction. Some, but not all minor (non-critical) subcomponents may suffer from slight degradation or few major (critical) subcomponents may suffer from slight degradation.

Green (-) Slight or no serviceability or reliability or reliability reduction overall to the component-section or sample. Some, but not all minor (non-critical) subcomponents may suffer from slight degradation or more than one major (critical) subcomponents may suffer from slight degradation.

Amber (+) Sustainment or restoration to any of the following: Minor repairs to several sub-components; or Significant repair, rehabilitation or replacement of one or more subcomponents, but not enough to encompass the component-section as a whole; or Combinations thereof.

Component-section or sample serviceability or reliability is degraded, but adequate. A very few major (critical) subcomponents may suffer from moderate deterioration with perhaps a few minor (non-critical) subcomponents suffering from severe deterioration.

Amber Component-section or sample serviceability or reliability is definitely impaired. Some, but not a majority of major (critical) subcomponents may suffer from moderate deterioration with perhaps many minor (non-critical) subcomponents suffering from severe deterioration.

Amber (-) Component-section or sample has significant serviceability or reliability loss. Most subcomponents may suffer from moderate degradation or a few major (critical) subcomponents may suffer from severe degradation.

Red (+) Sustainment or restoration required consisting of major repair, rehabilitation or replacement to the component-section as a whole.

Significant serviceability or reliability reduction in component-section or sample. A majority of subcomponents are severely degraded and others may have varying degrees of degradation.

Red Severe serviceability or reliability reduction to the component-section or sample such that it is barely able to perform. Most subcomponents are severely degraded.

Red (-) Overall component-section degradation is total. Few, if any subcomponents are salvageable. Complete loss of component-section or sample serviceability.

Once the component-sections have been rated with either a Direct Rating or Distress Survey BUILDER calculates the Component-Section Condition Index (CSCI) of the component-section. The next step in the process is to create a work plan, which will list the component-sections that need repair or replacement and the estimated cost of the repair or replacement.

To create a work plan, condition standards, policies and a policy sequence are created. The standards serve as thresholds for CSCI and remaining service life. Policies link standards to component-sections and policy sequences link standards and policies together.

The table below summarizes the DoDEA standards and how they are applied to the component-sections for this assessment.

Standard and Component-section Cross-Reference Standard CI Threshold Component-section Amber + 80 D4010 FIRE ALARM AND DETECTION SYSTEMS

Amber 71 B3010 ROOF COVERINGS

D1010 ELEVATORS AND LIFTS

D2010 PLUMBING FIXTURES

D3020 HEAT GENERATING SYSTEMS

D3030 COOLING GENERATING SYSTEMS

D3040 DISTRIBUTION SYSTEMS ( A )

D3050 TERMINAL & PACKAGE UNITS

D3060 CONTROLS & INSTRUMENTATION

D3090 OTHER HVAC SYSTEMS AND EQUIPMENT

D4020 FIRE SUPP WATER SUPPLY / EQUIP

D4030 STANDPIPE SYSTEMS

D4040 SPRINKLERS

D4050 FIRE PROTECTION SPECIALTIES

D4090 OTHER FIRE PROTECTION SYSTEMS

D5010 ELECTRICAL SERVICE & DISTRIBUTION

D5020 LIGHTING & BRANCH WIRING

D5030 COMMUNICATIONS & SECURITY

D5090 OTHER ELECTRICAL SERVICES

Amber - 61 B2030 EXTERIOR DOORS

C1020 INTERIOR DOORS

C3010 WALL FINISHES

C3020 FLOOR FINISHES

C3030 CEILING FINISHES

C3040 INT COATINGS / SPECIAL FINISHES

D3010 ENERGY SUPPLY

Red + 50 B2010 EXTERIOR WALLS

B2020 EXTERIOR WINDOWS

C1030 SPECIALTIES

D1020 WEIGHT HANDLING EQUIPMENT

D1030 ESCALATORS AND MOVING WALKS

D1090 OTHER CONVEYING SYSTEMS

D2020 DOMESTIC WATER DISTRIBUTION

D2030 SANITARY WASTE

D2040 RAIN WATER DRAINAGE

D2090 OTHER PLUMBING SYSTEMS

D3070 SYSTEMS TESTING & BALANCING

Service Life 40 Paint

For this project, the following building components are not included in the BUILDER Inventory and are not evaluated during the assessment unless significant damage or deterioration was observed or reported.

• A1010 STANDARD FOUNDATIONS

• A1020 SPECIAL FOUNDATIONS

• A1030 SLAB ON GRADE

• A2010 BASEMENT EXCAVATION

• A2020 BASEMENT WALLS

• B1010 FLOOR CONSTRUCTION

• B1020 ROOF CONSTRUCTION

• B2010 EXTERIOR WALLS

• C1010 PARTITIONS

• C2010 STAIR CONSTRUCTION

Damage that is not visible or that is unknown will not be reflected in facility condition index calculations. It is anticipated that unknown damage or deterioration is more likely to be present in older facilities than more modern facilities.

In addition, some building components are concealed or inaccessible. In accordance with BUILDER guidelines, quantities for concealed and inaccessible components have been estimated and recorded in the BUILDER Inventory but have not been rated. When concealed or inaccessible components are encountered, life cycle data contained within BUILDER is used to predict renewal requirements, which are included in facility condition index calculations. Components that are often concealed or inaccessible include:

• D2020 DOMESTIC WATER PIPING

• D2030 SANITARY WASTE PIPING

• D3040 HVAC DISTRIBUTION

• D4010 FIRE ALARM DISTRIBUTION

• D5020 ELECTRICAL BRANCH WIRING

In addition to the building components noted above, if a building component is concealed or inaccessible, life cycle data contained within BUILDER is used to predict renewal requirements.

When a work plan is created, the CSCI of a component-section is compared to its associated standard. If the CSCI is less than or equal to the threshold in the standard, the remaining service life is evaluated. If the service life is less than the standard’s remaining service life, BUILDER will add this section to the work plan and generate dollars to estimate a cost for the replacement.

If the CSCI is less than or equal to the threshold in the standard and the service life is greater than the standard’s remaining service life, BUILDER will conduct a cost benefit analysis. The cost benefit analysis will determine whether the component-section should be repaired or left to expire at the end of its service life. When BUILDER determines a repair is the correct action, BUILDER will add this section to the work plan and generate dollars to estimate a cost for the repair.

When BUILDER determines a taking no action is more cost effective, BUILDER will not add the component-section to the work plan. For example, if the CSCI for an external door component-section is 50 with a remaining service life of five years, BUILDER will compare the CSCI of 50 to the CI Threshold set by DoDEA and determine that is 50 is less than the threshold of 61. BUILDER will compare the five years of remaining services life against the zero years of the threshold and determine a cost benefit analysis is required. The results of the cost benefit analysis will typically be to take no action and let the component-section run until the end of its service life before generating an item in the work plan.

A typical life cycle of a component-section is explained below.

Condition Work Plan CSCI > threshold Work plan does not generate an item for the component-section CSCI = threshold or just below it Work plan will generate a repair item for the component-section CSCI < threshold and the remaining service life > service life threshold

Work plan will remove the repair item for the component-section. It is too costly to repair so it is better to wait to replace it.

Remaining service life < service life threshold Work plan will generate a replace item for the component-section

Facility Condition Assessment Data Analysis In multiple building portfolios and especially with widespread geographic portfolios, it is important to know how building conditions compare. The Condition Index (CI) and Quality Ratings (Q-Ratings) are determined for each building assessed using guidelines shown below.

Condition Index (CI) – A measure of the constructed asset’s condition at a specific point in time with respect to physical condition and ability to support the current occupant or mission. CI is calculated as the ratio of estimated cost of maintenance and repair requirements to Plant Replacement Value (PRV).

Maintenance and repair requirements consist of that work necessary to ensure that a constructed asset is restored to a condition substantially equivalent to the originally intended and designed capacity, efficiency or capability. The formula for Condition Index is:

!" = $ − '()*+,-).)/012(3 4x 100

Q-Rating Bands – Bands allow OSD, Military Services, and Defense Agencies/Activities to group facilities by condition for the purposes of developing investment strategies.

TABLE 1: Q-RATING DESCRIPTIONS

Rating Band

Calculated Rating (Condition Index)

General Description

Q-1 100% to 90% Facility new or well maintained (Good Condition)

Q-2 89% to 80% Facility is satisfactorily maintained (Fair Condition)

Q-3 79% to 60% Facility is under maintained (Poor Condition)

Q-4 59% to 0% Facility should be considered for replacement (Failing Condition)

Plant Replacement Value – Cost of replacing the existing constructed asset at today’s standards, adjusted for location (Area Cost Factor; ACF), overhead costs such as planning and design (P&D), supervision, inspection and overhead factor (SIOF), and other construction overhead costs (reference United Facilities Criteria (UFC) 3-701-13). The formula for PRV is:

Plant Replacement Value = Facility Quantity x Replacement Unit Cost x Area Cost Factor1 x Historical Records Adjustment2 x Planning and Design Factor3 x Supervision Inspection and Overhead Factor4 x Contingency Factor5

1A geographic location adjustment for costs of labor, material, and equipment, published in Chapter 4.

2An adjustment to account for increased costs for replacement of historical facilities or for construction in a historic district; the current value of the factor is 1.05.

3 A factor to account for the planning and design of a facility; the current value of this factor is 1.09 for all but medical facilities and 1.13 for medical facilities.

4 A factor to account for the supervision, inspection, and overhead activities associated with the management of a construction project; the current value of the factor is 1.057 for facilities in the continental US (CONUS) and 1.065 for facilities outside the continental US (OCONUS).

5 A factor to account for construction contingencies; the current value of the factor is 1.05.

W91236-17-C-0021 Daegu American School - Date of Assessment: 4-Apr-2018 7

BUILDER Report Overview

Outlined below is a summary and description of the reports that are included.

Appendix C - Facility Summary Report – Provides a summation of FCA results. A Building Summary Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating.

The purpose of this report is to provide a general overview of the building including key performance indicators.

This report was generated using DoDEA's calculated Replacement Cost overwriting the data populated from real property records. This provides a more accurate Replacement Cost due to the inconsistencies with real property reconciliation between DoDEA and the Services. The DoD Facility Pricing Guide and DoDEA measurements for building square footage were used to calculate the Replacement Cost.

Appendix D - Building System Condition Index (SCI) By System – Provides an overview of inspected systems and their condition index rating. A Building System Condition Index (SCI) By System Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating.

Appendix E - Work Items By Building – Provides a list of work items requiring repair or replacement of system/components, including budgets, for project planning purposes. A Work Plan Detail by Year Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating.

Appendix F - Remaining Service Life (RSL) Detail Report – Provides a detailed overview of systems/components, including descriptions, and their respective age, remaining service life and remaining paint life.

Appendix G - Distress Survey Inspection By Section Report - Provides a summary of distress survey details collected within each facility.

Appendix H -Direct Condition Rating Inspection By Section Report – Provides a summary of direct condition ratings for each component-section collected within each facility.

Appendix I - System Inventory Report – Provides a list of details for each component-section collected within each facility.

Note: All reports are generated from the DoDEA BUILDER database. In the event line items within a report are compressed and difficult to read, this is a result of how BUILDER generates the report. It is our understanding that CERL is working to update the report format.

Summary of Terms

Acronyms Description BCI Building Condition Index - Measures the condition of the building as a whole. The higher the BCI, the better.

BFI Building Functionality Index - Measures the functionality of a building as a whole.

The higher the BFI, the better.

BPI Building Performance Index - Measures the overall performance of a building. The higher the BPI, the better.

EA Each ESC Emergency Service Call FCI Facility Condition Index - The current maintenance, repair, and replacement deficiencies of the facility divided by the current replacement value of the facility, derives the FCI of a facility. The higher the FCI, the better.

GSF Gross Square Foot ISR Installation Status Report - Measures installation condition against Army-wide standards.

LF Linear Feet MBH Thousands of BTU per hour.

MDI Mission Dependency Index - Measures how critical a facility is to the overall mission of its owner. The higher the MDI, the more critical.

PERM Permanent RELO Relocatable RPL Remaining Paint Life - Displays the remaining paint life, in years, of a section.

RPUID Real Property Unique Identifier - The unique identification number assigned to each asset.

RSL Remaining Service Life - Displays the remaining service life, in years, of a section.

SCI System Condition Index - Measures the condition of a system as a whole. The higher the SCI, the better.

SF Square Foot TEMP Temporary UM Unit of Measure

Appendix C

Facility Summary Report

VS20160115 - Cplx

3000 - Daegu American School Bldg 3000 Camp Henry - DAEGU AMERICAN SCHOOL https:\\builder.sms.erdc.dren.mil/dodea/files/images/cd7067bd-b2b0-4d1e-93c2-3959d8c57a36/Bldg_3000_-_2018_00062.JPG

YEAR BUILT: 1983

AREA (SF): 70,782

PLANT REPLACEMENT COST: $27,887,045

SURVEY DATE: April 2018

TOTAL DEFICIENCIES: $4,887,355

BUILDER(TM) METRIC SCORE

Facility Condition Index FCI: 82

DoDEA Facility Summary Report - Page 18/3/2018 4:15:33 PM

3008 - Daegu American School Bldg 3008 Camp Henry - DAEGU AMERICAN SCHOOL https:\\builder.sms.erdc.dren.mil/dodea/files/images/cd7067bd-b2b0-4d1e-93c2-3959d8c57a36/Bldg_3008_-_2018_00062.JPG

YEAR BUILT: 1986

AREA (SF): 1,191

PLANT REPLACEMENT COST: $469,243

SURVEY DATE: April 2018

TOTAL DEFICIENCIES: $82,880

BUILDER(TM) METRIC SCORE

Facility Condition Index FCI: 82

DoDEA Facility Summary Report - Page 28/3/2018 4:15:33 PM

3013 - Daegu American School Bldg 3013 Camp Henry - DAEGU AMERICAN SCHOOL https:\\builder.sms.erdc.dren.mil/dodea/files/images/cd7067bd-b2b0-4d1e-93c2-3959d8c57a36/Bldg_3013_-_2018_00062.JPG

YEAR BUILT: 2002

AREA (SF): 1,890

PLANT REPLACEMENT COST: $744,642

SURVEY DATE: April 2018

TOTAL DEFICIENCIES: $0

BUILDER(TM) METRIC SCORE

Facility Condition Index FCI: 100

DoDEA Facility Summary Report - Page 38/3/2018 4:15:33 PM

3018 - Daegu American School Bldg 3018 Camp Henry - DAEGU AMERICAN SCHOOL https:\\builder.sms.erdc.dren.mil/dodea/files/images/cd7067bd-b2b0-4d1e-93c2-3959d8c57a36/Bldg_3018_-_2018_00061.JPG

YEAR BUILT: 2006

AREA (SF): 2,616

PLANT REPLACEMENT COST: $1,030,679

SURVEY DATE: April 2018

TOTAL DEFICIENCIES: $42,100

BUILDER(TM) METRIC SCORE

Facility Condition Index FCI: 96

DoDEA Facility Summary Report - Page 48/3/2018 4:15:33 PM

3019 - Daegu American School Bldg 3019 Camp Henry - DAEGU AMERICAN SCHOOL https:\\builder.sms.erdc.dren.mil/dodea/files/images/cd7067bd-b2b0-4d1e-93c2-3959d8c57a36/Bldg_3019_-_2018_00061.JPG

YEAR BUILT: 2008

AREA (SF): 21,563

PLANT REPLACEMENT COST: $8,495,618

SURVEY DATE: April 2018

TOTAL DEFICIENCIES: $7,000

BUILDER(TM) METRIC SCORE

Facility Condition Index FCI: 100

DoDEA Facility Summary Report - Page 58/3/2018 4:15:33 PM

Storage - Daegu American School Bldg Storage Camp Henry - DAEGU AMERICAN SCHOOL https:\\builder.sms.erdc.dren.mil/dodea/files/images/cd7067bd-b2b0-4d1e-93c2-3959d8c57a36/Building_Storage_-_2018_00061.JPG

YEAR BUILT: 1995

AREA (SF): 215

PLANT REPLACEMENT COST: $40,570

SURVEY DATE: April 2018

TOTAL DEFICIENCIES: $3,200

BUILDER(TM) METRIC SCORE

Facility Condition Index FCI: 92

Storage

DoDEA Facility Summary Report - Page 68/3/2018 4:15:33 PM

Appendix D

System Summary Report

VS20160115 -

Cplx

DoDEA SYSTEM SUMMARY Camp Henry

Complex Building # Building Name A10 A20 B10 B20 B30 C10 C20 C30 D10 D20 D30 D40 D50 E10 E20 F10 F20 G10 G20 G30 G40 G90

DAEGU

AMERICAN

SCHOOL

3000 Daegu American School Bldg 3000 0 0 0 74 76 74 77 73 30 65 30 78 62 94 0 0 0 0 0 0 0 0

DAEGU

AMERICAN

SCHOOL

3008 Daegu American School Bldg 3008 0 0 0 69 26 79 0 76 0 0 43 62 30 0 0 0 0 0 0 0 0 0

DAEGU

AMERICAN

SCHOOL

3013 Daegu American School Bldg 3013 0 0 0 79 83 85 0 84 0 0 87 57 87 0 0 0 0 0 0 0 0 0

DAEGU

AMERICAN

SCHOOL

3018 Daegu American School Bldg 3018 0 0 0 71 71 80 0 80 0 0 52 76 90 0 0 0 0 0 0 0 0 0

DAEGU

AMERICAN

SCHOOL

3019 Daegu American School Bldg 3019 0 0 0 87 76 83 87 83 87 95 87 94 90 0 0 0 0 0 0 0 0 0

DAEGU

AMERICAN

SCHOOL

Storage Daegu American School Bldg Storage 0 0 0 70 41 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

A10 - Foundations C20 - Stairs D50 - Electrical G10 - Site Preparations

A20 -Basement Construction C30 - Interior Finishes E10 - Equipment G20 - Site Improvements

B10 - Superstructure D10 - Conveying E20 - Furnishings G30 - Site Civil / Mech Utilities

B20 - Exterior Enclosure D20 - Plumbing F10 - Special Construction G40 - Site Electrical Utilities

B30 - Roofing D30 - HVAC F20 - Selective Building Demo G50 - Other Site Construction

C10 - Interior Construction D40 - Fire Protection

DoDEA System Summary Report - Page 18/3/2018 4:16:11 PM System Summary is based on the ASTM uniformat II, Level 2 Group Elements (ASTM E1557)

Appendix E

Work Items By Building

D10 CONVEYING2015

1983 D101002 PASSENGER ELEVATORS Hydraulic Elevators - 1500 lb, 2 floors 1 (EA) Replace $96,000 0.00D1010 ELEVATORS AND LIFTS Awaiting Funds

-- Replace D1010 ELEVATORS AND LIFTS 1983 D101002 PASSENGER ELEVATORS Hydraulic Elevators - 1500 lb, 2 floors

D20 PLUMBING2015

1983 D201004 SINKS Service Sink 4 (EA) Replace $18,000 0.00D2010 PLUMBING FIXTURES Awaiting Funds

-- Replace D2010 PLUMBING FIXTURES 1983 D201004 SINKS Service Sink

1983 D201006 DRINKING FOUNTAINS AND COOLERS Water Cooler 12 (EA) Replace $36,000 0.00D2010 PLUMBING FIXTURES Awaiting Funds

-- Replace D2010 PLUMBING FIXTURES 1983 D201006 DRINKING FOUNTAINS AND COOLERS Water Cooler

1983 D202003 DOMESTIC WATER EQUIPMENT Water Heaters, Commercial, Gas - 75 MBH input, 63 GPH 1 (EA) Replace $6,300 0.00D2020 DOMESTIC WATER DISTRIBUTION Awaiting Funds

-- Replace D2020 DOMESTIC WATER DISTRIBUTION 1983 D202003 DOMESTIC WATER EQUIPMENT Water Heaters, Commercial, Gas - 75 MBH input, 63 GPH

D30 HVAC2015

1983 D302001 BOILERS Gas/Oil, Hot Water - 2,250-2,750 MBH 1 (EA) Replace $94,000 0.00D3020 HEAT GENERATING SYSTEMS Awaiting Funds

-- Replace D3020 HEAT GENERATING SYSTEMS 1983 D302001 BOILERS Gas/Oil, Hot Water - 2,250-2,750 MBH

1983 D302005 EQUIPMENT THERMAL INSULATION General 600 (SF) Replace $9,600 0.00D3020 HEAT GENERATING SYSTEMS Awaiting Funds

-- Replace D3020 HEAT GENERATING SYSTEMS 1983 D302005 EQUIPMENT THERMAL INSULATION General

1983 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 500 CFM 48 (EA) Replace $1,471,000 0.00D3040 DISTRIBUTION SYSTEMS Awaiting Funds

-- Replace D3040 DISTRIBUTION SYSTEMS 1983 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust

Camp Henry

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

DAEGU AMERICAN SCHOOL (HE6408)3000 - Daegu American School Bldg 3000

Cost Book: Reference

Work Items by Building Report

Page 1 of 33August 03, 2018

1983 D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 3', 1000 CFM 2 (EA) Replace $36,500 0.00D3040 DISTRIBUTION SYSTEMS Awaiting Funds

-- Replace D3040 DISTRIBUTION SYSTEMS 1983 D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 3', 1000 CFM

D40 FIRE PROTECTION2015

1983 D401001 FIRE ALARM DISTRIBUTION Other 70,781 (SF) Repair $143,000 0.00D4010 FIRE ALARM AND DETECTION SYSTEMS Awaiting Funds

-- Repair D4010 FIRE ALARM AND DETECTION SYSTEMS 1983 D401001 FIRE ALARM DISTRIBUTION General

1983 D403001 STANDPIPE EQUIPMENT & PIPING Riser - 2-1/2" diam 1 (EA) Replace $9,900 0.00D4030 STANDPIPE SYSTEMS Awaiting Funds

-- Replace D4030 STANDPIPE SYSTEMS 1983 D403001 STANDPIPE EQUIPMENT & PIPING Riser - 4" diam

D50 ELECTRICAL2015

1983 D501004 PANELBOARDS Main lugs, 120/240 V, 100 amp, NQOD 3 (EA) Replace $6,700 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983 D501004 PANELBOARDS Main lugs, 120/240 V, 100 amp, NQOD

1983 D501005 ENCLOSED CIRCUIT BREAKERS Main circuit breaker, 120/208 V, 225 amp, NQOD 800 (EA) Repair $6,900 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Repair D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983 D501005 ENCLOSED CIRCUIT BREAKERS General

1983 A D501004 PANELBOARDS Switchgear - 800 Amp 1 (EA) Replace $31,500 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983 D501002 SERVICE ENTRANCE EQUIPMENT Electrical Service - 3 Phase, 120/208 V, 1000 A

1983A D501003 INTERIOR DISTRIBUTION TRANSFORMERS dry-type, 15 kV primary 277/480 volt secondary, 150 kVA 1,800 (EA) Replace $4,794,000 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983A D501001 MAIN TRANSFORMERS General

1983A D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD 2 (EA) Replace $8,300 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983A D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD

Camp Henry

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

DAEGU AMERICAN SCHOOL (HE6408)3000 - Daegu American School Bldg 3000

Cost Book: Reference

Page 2 of 33August 03, 2018

1983A D501004 PANELBOARDS Main lugs, 125 amp 5 (EA) Replace $11,000 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983A D501004 PANELBOARDS Main lugs, 125 amp

1983A D501005 ENCLOSED CIRCUIT BREAKERS Main circuit breaker, 120/208 V, 100 amp, NQOD 3 (EA) Repair $3,200 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Repair D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983A D501005 ENCLOSED CIRCUIT BREAKERS Main circuit breaker, 120/208 V, 100 amp, NQOD

1983B D501003 INTERIOR DISTRIBUTION TRANSFORMERS dry-type, 15 kV primary 277/480 volt secondary, 150 kVA 1,000 (EA) Repair $723,000 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Repair D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983B D501001 MAIN TRANSFORMERS General

1983B D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD 3 (EA) Replace $12,500 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983B D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD

1983 D502002 LIGHTING EQUIPMENT General 67,643 (SF) Replace $971,000 0.00D5020 LIGHTING & BRANCH WIRING Awaiting Funds

-- Replace D5020 LIGHTING & BRANCH WIRING 1983 D502002 LIGHTING EQUIPMENT General

1983A D502002 LIGHTING EQUIPMENT Exit Lighting 25 (EA) Replace $5,600 0.00D5020 LIGHTING & BRANCH WIRING Awaiting Funds

-- Replace D5020 LIGHTING & BRANCH WIRING 1983A D502002 LIGHTING EQUIPMENT Exit Lighting

1983 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets 1 (EA) Replace $172,000 0.00D5030 COMMUNICATIONS & SECURITY Awaiting Funds

-- Replace D5030 COMMUNICATIONS & SECURITY 1983 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets

1983 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 1 (EA) Replace $171,000 0.00D5030 COMMUNICATIONS & SECURITY Awaiting Funds

-- Replace D5030 COMMUNICATIONS & SECURITY 1983 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations

1983 D509002 EMERGENCY LIGHTING & POWER General 70,781 (SF) Repair $256,000 0.00D5090 OTHER ELECTRICAL SERVICES Awaiting Funds

-- Repair D5090 OTHER ELECTRICAL SERVICES 1983 D509002 EMERGENCY LIGHTING & POWER General

Camp Henry

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

DAEGU AMERICAN SCHOOL (HE6408)3000 - Daegu American School Bldg 3000

Cost Book: Reference

Page 3 of 33August 03, 2018

E10 EQUIPMENT2015

*Convection Oven, Double B E109002 FOOD SERVICE EQUIPMENT General 2 (EA) Replace $3,900 0.00E1090 OTHER EQUIPMENT Awaiting Funds

-- Replace E1090 OTHER EQUIPMENT *Convection Oven, Single E109002 FOOD SERVICE EQUIPMENT General

B30 ROOFING2016

1983 B301002 LOW SLOPE ROOF SYSTEMS Single Ply Membrane 43,740 (SF) Replace $266,000 0.00B3010 ROOF COVERINGS Awaiting Funds

-- Replace B3010 ROOF COVERINGS 1983 B301002 LOW SLOPE ROOF SYSTEMS Single Ply Membrane

1983 B301003 ROOF INSULATION & FILL General 43,740 (SF) Replace $109,000 0.00B3010 ROOF COVERINGS Awaiting Funds

-- Replace B3010 ROOF COVERINGS 1983 B301003 ROOF INSULATION & FILL General

C10 INTERIOR CONSTRUCTION2016

1983 C102001 STANDARD INTERIOR DOORS Wood Door/Metal Frame 34 (EA) Replace $65,000 0.00C1020 INTERIOR DOORS Awaiting Funds

-- Replace C1020 INTERIOR DOORS 1983 C102001 STANDARD INTERIOR DOORS General

1983 C102002 GLAZED INTERIOR DOORS General 113 (EA) Replace $144,000 0.00C1020 INTERIOR DOORS Awaiting Funds

-- Replace C1020 INTERIOR DOORS 1983 C102003 FIRE DOORS General

1983 C103009 CABINETS General 548 (LF) Replace $285,000 0.00C1030 SPECIALTIES Awaiting Funds

-- Replace C1030 SPECIALTIES 1983 C103009 CABINETS General

1983 A C103008 COUNTERS Laminated Plastic 331 (LF) Replace $13,000 0.00C1030 SPECIALTIES Awaiting Funds

-- Replace C1030 SPECIALTIES 1983A C103008 COUNTERS Laminated Plastic

Camp Henry

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

DAEGU AMERICAN SCHOOL (HE6408)3000 - Daegu American School Bldg 3000

Cost Book: Reference

Page 4 of 33August 03, 2018

1983 B C103008 COUNTERS Laminated Plastic 330 (LF) Replace $13,000 0.00C1030 SPECIALTIES Awaiting Funds

-- Replace C1030 SPECIALTIES 1983B C103008 COUNTERS Laminated Plastic

C30 INTERIOR FINISHES2016

1983 C301006 ACOUSTICAL PANELS ADHERED TO WALLS General 6,740 (SF) Replace $192,000 0.00C3010 WALL FINISHES Awaiting Funds

-- Replace C3010 WALL FINISHES 1983 C301006 ACOUSTICAL PANELS ADHERED TO WALLS General

1983 C302005 CARPETING General 3,951 (SF) Replace $32,500 0.00C3020 FLOOR FINISHES Awaiting Funds

-- Replace C3020 FLOOR FINISHES 1983 C302005 CARPETING General

1983 A C302004 RESILIENT FLOOR FINISHES Vinyl Tile 1,558 (SF) Replace $9,600 0.00C3020 FLOOR FINISHES Awaiting Funds

-- Replace C3020 FLOOR FINISHES 1983A C302004 RESILIENT FLOOR FINISHES Resilient Tile

1983 A C303002 GYPSUM WALLBOARD CEILING FINISHES General 7,182 (SF) Paint $960 0.00C3030 CEILING FINISHES Awaiting Funds

-- Paint C3030 CEILING FINISHES 1983A C303002 GYPSUM WALLBOARD CEILING FINISHES General

D10 CONVEYING2016

1983 D101002 PASSENGER ELEVATORS Hydraulic Elevators - 1500 lb, 2 floors 1 (EA) Replace $97,000 0.00D1010 ELEVATORS AND LIFTS Awaiting Funds

-- Replace D1010 ELEVATORS AND LIFTS 1983 D101002 PASSENGER ELEVATORS Hydraulic Elevators - 1500 lb, 2 floors

D20 PLUMBING2016

1983 D201004 SINKS Service Sink 4 (EA) Replace $18,500 0.00D2010 PLUMBING FIXTURES Awaiting Funds

-- Replace D2010 PLUMBING FIXTURES 1983 D201004 SINKS Service Sink

Camp Henry

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

DAEGU AMERICAN SCHOOL (HE6408)3000 - Daegu American School Bldg 3000

Cost Book: Reference

Page 5 of 33August 03, 2018

1983 D201006 DRINKING FOUNTAINS AND COOLERS Water Cooler 12 (EA) Replace $36,500 0.00D2010 PLUMBING FIXTURES Awaiting Funds

-- Replace D2010 PLUMBING FIXTURES 1983 D201006 DRINKING FOUNTAINS AND COOLERS Water Cooler

1983 D203002 VENT PIPE & FITTINGS General 778 (EA) Replace $95,000 0.00D2030 SANITARY WASTE Awaiting Funds

-- Replace D2030 SANITARY WASTE 1983 D203002 VENT PIPE & FITTINGS General

D30 HVAC2016

1983 D302005 EQUIPMENT THERMAL INSULATION General 5,000 (SF) Replace $82,000 0.00D3020 HEAT GENERATING SYSTEMS Awaiting Funds

-- Replace D3020 HEAT GENERATING SYSTEMS 1983 D302005 EQUIPMENT THERMAL INSULATION General

1983 D304003 HOT WATER DISTRIBUTION SYSTEMS General 12 (MBH) Replace $976,000 0.00D3040 DISTRIBUTION SYSTEMS Awaiting Funds

-- Replace D3040 DISTRIBUTION SYSTEMS 1983 D304090 OTHER DISTRIBUTION SYSTEMS General

1983 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General 210 (TON) Replace $1,424,000 0.00D3040 DISTRIBUTION SYSTEMS Awaiting Funds

-- Replace D3040 DISTRIBUTION SYSTEMS 1983 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General

1983 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 500 CFM 18 (EA) Replace $70,000 0.00D3040 DISTRIBUTION SYSTEMS Awaiting Funds

-- Replace D3040 DISTRIBUTION SYSTEMS 1983 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 500 CFM

1983 D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 3', 1000 CFM 2 (EA) Replace $37,000 0.00D3040 DISTRIBUTION SYSTEMS Awaiting Funds

-- Replace D3040 DISTRIBUTION SYSTEMS 1983 D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 3', 1000 CFM

1983A D304008 AIR HANDLING UNITS Central Station - 5000 CFM, VAV 4 (EA) Replace $195,000 0.00D3040 DISTRIBUTION SYSTEMS Awaiting Funds

-- Replace D3040 DISTRIBUTION SYSTEMS 1983A D304008 AIR HANDLING UNITS Central Station - 5000 CFM, VAV

D40 FIRE PROTECTION2016

Camp Henry

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

DAEGU AMERICAN SCHOOL (HE6408)3000 - Daegu American School Bldg 3000

Cost Book: Reference

Page 6 of 33August 03, 2018

1983 D401001 FIRE ALARM DISTRIBUTION Other 70,781 (SF) Repair $176,000 0.00D4010 FIRE ALARM AND DETECTION SYSTEMS Awaiting Funds

-- Repair D4010 FIRE ALARM AND DETECTION SYSTEMS 1983 D401001 FIRE ALARM DISTRIBUTION General

1983 D403001 STANDPIPE EQUIPMENT & PIPING Riser - 2-1/2" diam 1 (EA) Replace $5,600 0.00D4030 STANDPIPE SYSTEMS Awaiting Funds

-- Replace D4030 STANDPIPE SYSTEMS 1983 D403001 STANDPIPE EQUIPMENT & PIPING Riser - 2-1/2" diam

D50 ELECTRICAL2016

1983 D501004 PANELBOARDS Main lugs, 120/240 V, 100 amp, NQOD 3 (EA) Replace $6,900 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983 D501004 PANELBOARDS Main lugs, 120/240 V, 100 amp, NQOD

1983 D501005 ENCLOSED CIRCUIT BREAKERS Main circuit breaker, 120/208 V, 225 amp, NQOD 8 (EA) Repair $14,000 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Repair D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983 D501005 ENCLOSED CIRCUIT BREAKERS Main circuit breaker, 120/208 V, 225 amp, NQOD

1983 A D501004 PANELBOARDS Switchgear - 800 Amp 1 (EA) Replace $40,000 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983 D501004 PANELBOARDS Switchgear - 1200 Amp

1983A D501003 INTERIOR DISTRIBUTION TRANSFORMERS dry-type, 15 kV primary 277/480 volt secondary, 150 kVA 1 (EA) Replace $37,000 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983A D501003 INTERIOR DISTRIBUTION TRANSFORMERS dry-type, 15 kV primary 277/480 volt secondary, 150 kVA

1983A D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD 2 (EA) Replace $8,500 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983A D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD

1983A D501004 PANELBOARDS Main lugs, 125 amp 5 (EA) Replace $11,000 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983A D501004 PANELBOARDS Main lugs, 125 amp

Camp Henry

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

DAEGU AMERICAN SCHOOL (HE6408)3000 - Daegu American School Bldg 3000

Cost Book: Reference

Page 7 of 33August 03, 2018

1983A D501005 ENCLOSED CIRCUIT BREAKERS Main circuit breaker, 120/208 V, 100 amp, NQOD 3 (EA) Repair $3,550 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Repair D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983A D501005 ENCLOSED CIRCUIT BREAKERS Main circuit breaker, 120/208 V, 100 amp, NQOD

1983B D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD 3 (EA) Replace $13,000 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION Awaiting Funds

-- Replace D5010 ELECTRICAL SERVICE & DISTRIBUTION 1983B D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD

1983 D502002 LIGHTING EQUIPMENT General 67,643 (SF) Replace $989,000 0.00D5020 LIGHTING & BRANCH WIRING Awaiting Funds

-- Replace D5020 LIGHTING & BRANCH WIRING 1983 D502002 LIGHTING EQUIPMENT General

1983A D502002 LIGHTING EQUIPMENT Exit Lighting 25 (EA) Replace $5,700 0.00D5020 LIGHTING & BRANCH WIRING Awaiting Funds

-- Replace D5020 LIGHTING & BRANCH WIRING 1983A D502002 LIGHTING EQUIPMENT Exit Lighting

1983 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets 1 (EA) Replace $175,000 0.00D5030 COMMUNICATIONS & SECURITY Awaiting Funds

-- Replace D5030 COMMUNICATIONS & SECURITY 1983 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets

1983 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 1 (EA) Replace $174,000 0.00D5030 COMMUNICATIONS & SECURITY Awaiting Funds

-- Replace D5030 COMMUNICATIONS & SECURITY 1983 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations

1983 D509002 EMERGENCY LIGHTING & POWER General 70,781 (SF) Replace $960,000 0.00D5090 OTHER ELECTRICAL SERVICES Awaiting Funds

-- Replace D5090 OTHER ELECTRICAL SERVICES 1983 D509002 EMERGENCY LIGHTING & POWER General

B20 EXTERIOR ENCLOSURE2017

1983 B201005 EXTERIOR LOUVERS & SCREENS General 14 (SF) Paint $65 0.00B2010 EXTERIOR WALLS Awaiting Funds

-- Paint B2010 EXTERIOR WALLS 1983 B201005 EXTERIOR LOUVERS & SCREENS General

Camp Henry

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

DAEGU AMERICAN SCHOOL (HE6408)3000 - Daegu American School Bldg 3000

Cost Book: Reference

Page 8 of 33August 03, 2018

1983 B201007 EXTERIOR SOFFITS…

This is the start of the file's text. The full file is on GovTribe.