This is a summary of Amendment 0003 to Solicitation Number 0003 for a Total Maintenance Services Contract with the Department of the Army Corps of Engineers Engineering District Far East. The amendment provides additional details on the products and services required under the contract, which include general maintenance services for facilities at various Army installations in Korea. Responses to the solicitation are due by August 3, 2018. The awarded firm will be responsible for services such as repairs and preventative maintenance for buildings, grounds, utilities and life support systems. The period of performance is one base year with four optional one-year extensions. Pricing will be on a firm-fixed-price basis. The solicitation targets small businesses under the HUBZone set-aside program.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912UM19R0021 Amend 3.pdf | ||
| J-2 Daegu AS drawings.pdf | ||
| J-2 Daegu MHS Drawings.pdf | ||
| J-2 Site & Facility Drawings Daegu.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91236-17-C-0021 Daegu Middle/High School - Date of Assessment: 29-Mar-2018
3-Aug-2018
Daegu Middle/High School Facility Condition Assessment Report
I. INTRODUCTION
Daegu Middle/High School is located at USAG Daegu and Area IV, Camp Walker, South Korea. This report provides a summary of findings for the physical condition assessment of the building at this campus. The physical condition assessment includes a general description of typical building systems found and includes conditions present at the time of the site visit.
CAMPUS SUMMARY
Year Built¹ 2017
GSF² 142,266
Date of Assessment 29-Mar-2018 ¹ Indicates range of dates of construction present on campus ² Only permanent and semi-permanent facilities are included
SCHOOL SUMMARY
School Assessed
Condition Annual
Condition Report (Jun 2017)
Congressional
Starting Grade
Ending Grade
Students
Q-Rating FCI Q-Rating FCI Q-Rating Daegu Middle/High School Q-1 100 N/A N/A N/A Sixth Twelfth 295
BUILDING SUMMARY
Building/School
Year Built
GSF
Type
Daegu MS/HS Bldg 170 2017 142,266 PERM
II. SCHOOL PHYSICAL DESCRIPTION
The summary below provides a physical description of the school. When multiple systems or materials are present, the predominant system or material observed during the facility condition assessment is shown.
a. STRUCTURAL/EXTERIOR ENCLOSURE: The building exterior is an exterior insulation and finish system (EFIS). Roof coverings are seam metal. Exterior doors are metal with glazing. Window systems are pre-finished aluminum with double-glazing.
b. INTERIORS: Floor finishes used include resilient sheeting and carpet. Walls are painted hard surfaces.
Ceilings are acoustical lay-in tiles.
c. MECHANICAL: The campus facility has heating, which is provided by boilers. Building 170 has air conditioning, which is provided by chilled water. The campus has one elevator.
d. ELECTRICAL: No electrical upgrades have been completed and most wiring appears to be original. Lighting is typically lay-in fixtures with fluorescent lamps. Ground-fault circuit interrupter (GFCI) receptacles appear to be present in required locations. The campus has an intercom system. There is a security system and security cameras are present.
e. PLUMBING: Plumbing fixtures and piping are original. Domestic hot water is provided by gas-fired storage water heaters.
f. SITE: The school has parking for approximately 107 privately owned vehicles. In addition, the school has no playgrounds.
g. LIFE SAFETY: A fire safety inspection report was not available for review.
III. OBSERVATIONS
The following observations were made: It appears that outside air is being introduced into the HVAC system.
Exterior door security was not observed or reported to be a problem. As this is a new facility there were no configuration changes related to the building noted that necessitate the alteration of the current drawing file.
There was no incidence of shared spaces or partial use reported or noted. It was observed that there was an enclosed mechanical yard with a sign saying 176.
Building 170 is a Q-1 and was new at the time of assessment.
IV. QUALITY / CONDITION RATINGS
Table 1 shows building-specific information to include Real Property Unique Identifier (RPUID), type of construction, year built, gross area, Facility Condition Index (FCI), and Q-Rating. Table 2 shows buildings that are classified as temporary (TEMP) or relocatable (RELO) and therefore, by definition, are not included in Quality/Condition calculations.
TABLE 1: QUALITY / CONDITION RATINGS
Assessed
Photo Building RPUID Type Year Built GSF FCI Q-Rating Plant Replacement Value 3
170 1312160 PERM 2017 142,266 100 Q-1 $56,051,459
The Plant Replacement Value is calculated according to the DoD Facility Pricing Guide.
TABLE 2: TEMPORARY / RELOCATABLE BUILDINGS
Photo Building Type Year Built GSF Current Use
No data to display...
Appendix A
Site Plan
Appendix B
Overview of Sustainment Management System (SMS) and BUILDER™ Engineered Management System (EMS)
Overview of Sustainment Management System (SMS) and BUILDER™ Engineered Management System (EMS)
Sustainment Management System (SMS)
The Sustainment Management System (SMS) is a suite of web-based software applications developed by the United States Army Corps of Engineers - Engineer Research Development Center - Construction Engineering Research Laboratory (USACE-ERDC-CERL) to help facility engineers, technicians, and managers decide when, where, and how to best maintain the built environment. The SMS modules include BUILDER™ and ROOFER™ for assessing building conditions, PAVER™ for pavements, and RAILER™ for railroad infrastructure.
Because real property assets are so vast and diverse, a "knowledge-based" philosophy drives the SMS process.
The process starts with the automated download of real property data, and then more detailed system inventory is modeled and/or collected which identifies components and their key life-cycle attributes such as the age and material.
From this inventory, Condition Index (CI) measures for each component are predicted based on its expected stage in the life-cycle. Objective and repeatable inspections can then be performed on various components to verify their condition with respect to the expected life-cycle deterioration. The level of detail and frequency of these inspections are not fixed like other processes; they are dependent on knowledge of component criticality, the expected and measured condition and rate of deterioration, and remaining maintenance and service life. This "knowledge-based" inspection focuses attention to the most critical components at the time. In addition to these condition assessments, functionality assessments can be performed to evaluate user requirement changes, compliance and obsolescence issues. This provides a comprehensive picture of the overall performance of real property assets and their key components.
BUILDER Engineered Management System (EMS)
In September 2013, The Under Secretary of Defense, Frank Kendall, issued a memo indicating the Department of Defense requires a standardized process for facility condition assessments to ensure consistent and reliable data necessary for sound strategic investment decisions in managing the Department's built environment.
Establishing a DoD-wide facility condition assessment process will contribute to a more credible DoD asset management program and will support better buying power by allowing Department leadership to better target fiscal resources to those facilities most in need of investment. Further, adopting a standard process will help ensure that condition data will be audit-ready in accordance with Under Secretary of Defense (Comptroller)'s "Financial Improvement and Readiness Guidance" issued in March 2013.
The facility assessment process used to generate this report is based on BUILDER Engineered Management System (EMS) Version 3. BUILDER EMS was developed by the Engineer Research and Development Center.
The building assessment process addresses the requirements necessary for routine building facility management activities, including long range budgeting and sustainment/restoration/modernization (SRM) planning. This assessment approach provides an objective and generalized framework to help to identify problem areas that will require more investigation through detailed or specialized assessments. There may be times when detailed engineering assessments may be required to diagnose specific problems.
BUILDER is a software application for building asset lifecycle management. The primary focus of BUILDER is work plan development. BUILDER stores real property building information and more detailed system inventory is modeled and/or collected which identifies building components and their key life-cycle attributes such as the age, material and capacity. Inspections are then performed on the various components to determine an objective and repeatable Condition Index (CI) measure, which relates the general physical health of the asset.
With information about condition and remaining service life, BUILDER guides the development of short- and long-range work plans based on sound investment strategies, prioritization criteria, and budget constraints. BUILDER consolidates a variety of building-related management issues into a single decision-support package.
The system gives functional managers and decision-makers instant access to building inventory, current building condition indices, and probabilities condition prediction models. It also employs a patented knowledge-based inspection scheduling process. BUILDER improves the allocation process and return of building lifecycle investments by directing resources to the most condition critical components to avoid costly repair penalty costs, as well as the most mission critical components to manage risks of failure.
BUILDER Facility Condition Assessment Process
Facility Condition Assessment (FCA) is one of the primary processes of a facility life cycle asset management program. The FCA process results in a better understanding of the physical condition and readiness of an organization's buildings along with the reliability of its systems and components. It also facilitates the identification of work candidates for facility SRM repair projects. It is a critical aspect of the shift towards a proactive versus reactive facility management strategy. Instead of keeping facilities operational by relying primarily on corrective repairs (after a system or component has failed due to significant loss of function), it focuses on condition-based repairs which can be planned prior to failure. A condition-based approach can result in higher performing facilities at lower life-cycle costs.
Prior to an assessment, knowledge of the building systems and components present is necessary, since assessments are done against these components, not against the building as a whole. This information about the systems and components that make up a building is called the BUILDER Inventory. BUILDER has a vast library of predefined components which an assessor will select from, and the inventory collection process involves identifying the type, quantity, and year installed for all pertinent components. These components are also organized into systems and sub-systems according to the UNIFORMAT classification hierarchy. When a specific instance of a component is recorded, this is called a component-section in BUILDER, and represents a single component assembly or collection of like components to be managed as a single unit. The BUILDER facility condition assessment process directly supports the computation of a condition index for building component-sections, known as the Component-Section Condition Index (CSCI), which is the fundamental metric used in BUILDER. The CSCI is aggregated to compute a condition index metric at the system (SCI), building (BCI), and site/organizational levels.
A condition-based facility repair strategy requires condition information be collected at a component level, and that this condition information relate to loss of component function. Every component of a building has a primary function that it performs. This function is the reason that the component was constructed or installed in the building. It may also serve a number of secondary or tertiary functions. For example, for a door component, the primary function is to provide safe entry/egress of authorized movements while limiting unwanted movements of people (security), or other objects (water or moisture). The secondary functions would relate to aesthetics and thermal and air control, among others.
Over the course of a building component's life in service, it will likely experience a deterioration of its physical condition due to general aging, use in service, and exposure to a number of external or environmental factors.
This condition deterioration is manifested in distress(es) which adversely affect that component's current and future ability to perform its primary and/or secondary functions. These distresses include cracks, leaks, holes, corrosion, overheating, excessive vibration, animal/insect damage, as well as general deterioration or damage.
These distresses can be observed during a condition assessment process. As a result, the fundamental purpose of a condition assessment process is to measure (qualitatively and/or quantitatively) a component's ability to perform its required functions, considering the presence of accumulated distress.
There are two levels of the condition assessment process in BUILDER:
1. The Distress Survey involves the individual identification and recording of the type and nature of distresses observed for a component. The presence of these distresses recorded, in addition to the severity and density, results in a condition index metric, which directly relates to the level of condition deterioration, and indirectly to the loss of function due to this deterioration.
2. The Direct Rating method uses a single qualitative rating for each component based on condition observations (taking all distresses into account). This also results in a condition index metric, which relates to the level of deterioration and the loss of function. This abbreviated Direct Rating approach is often better suited to initial baseline assessments where the components are inventoried and data is initially loaded into BUILDER.
The following figure illustrates the Direct Rating criteria used in this assessment.
RATING SRM NEEDS RATING DEFINITION
Green (+)
Sustainment consisting of possible preventive maintenance (where applicable)
Entire component-section or component-section sample is free of observable or known distress.
Green Sustainment consisting of possible preventive maintenance (where applicable) and minor repairs (corrective maintenance) to possibly few or some subcomponents.
No component-section or sample serviceability* or reliability* reduction. Some, but not all minor (non-critical) subcomponents may suffer from slight degradation or few major (critical) subcomponents may suffer from slight degradation.
Green (-) Slight or no serviceability or reliability or reliability reduction overall to the component-section or sample. Some, but not all minor (non-critical) subcomponents may suffer from slight degradation or more than one major (critical) subcomponents may suffer from slight degradation.
Amber (+) Sustainment or restoration to any of the following: Minor repairs to several sub-components; or Significant repair, rehabilitation or replacement of one or more subcomponents, but not enough to encompass the component-section as a whole; or Combinations thereof.
Component-section or sample serviceability or reliability is degraded, but adequate. A very few major (critical) subcomponents may suffer from moderate deterioration with perhaps a few minor (non-critical) subcomponents suffering from severe deterioration.
Amber Component-section or sample serviceability or reliability is definitely impaired. Some, but not a majority of major (critical) subcomponents may suffer from moderate deterioration with perhaps many minor (non-critical) subcomponents suffering from severe deterioration.
Amber (-) Component-section or sample has significant serviceability or reliability loss. Most subcomponents may suffer from moderate degradation or a few major (critical) subcomponents may suffer from severe degradation.
Red (+) Sustainment or restoration required consisting of major repair, rehabilitation or replacement to the component-section as a whole.
Significant serviceability or reliability reduction in component-section or sample. A majority of subcomponents are severely degraded and others may have varying degrees of degradation.
Red Severe serviceability or reliability reduction to the component-section or sample such that it is barely able to perform. Most subcomponents are severely degraded.
Red (-) Overall component-section degradation is total. Few, if any subcomponents are salvageable. Complete loss of component-section or sample serviceability.
Once the component-sections have been rated with either a Direct Rating or Distress Survey BUILDER calculates the Component-Section Condition Index (CSCI) of the component-section. The next step in the process is to create a work plan, which will list the component-sections that need repair or replacement and the estimated cost of the repair or replacement.
To create a work plan, condition standards, policies and a policy sequence are created. The standards serve as thresholds for CSCI and remaining service life. Policies link standards to component-sections and policy sequences link standards and policies together.
The table below summarizes the DoDEA standards and how they are applied to the component-sections for this assessment.
Standard and Component-section Cross-Reference Standard CI Threshold Component-section Amber + 80 D4010 FIRE ALARM AND DETECTION SYSTEMS
Amber 71 B3010 ROOF COVERINGS
D1010 ELEVATORS AND LIFTS
D2010 PLUMBING FIXTURES
D3020 HEAT GENERATING SYSTEMS
D3030 COOLING GENERATING SYSTEMS
D3040 DISTRIBUTION SYSTEMS ( A )
D3050 TERMINAL & PACKAGE UNITS
D3060 CONTROLS & INSTRUMENTATION
D3090 OTHER HVAC SYSTEMS AND EQUIPMENT
D4020 FIRE SUPP WATER SUPPLY / EQUIP
D4030 STANDPIPE SYSTEMS
D4040 SPRINKLERS
D4050 FIRE PROTECTION SPECIALTIES
D4090 OTHER FIRE PROTECTION SYSTEMS
D5010 ELECTRICAL SERVICE & DISTRIBUTION
D5020 LIGHTING & BRANCH WIRING
D5030 COMMUNICATIONS & SECURITY
D5090 OTHER ELECTRICAL SERVICES
Amber - 61 B2030 EXTERIOR DOORS
C1020 INTERIOR DOORS
C3010 WALL FINISHES
C3020 FLOOR FINISHES
C3030 CEILING FINISHES
C3040 INT COATINGS / SPECIAL FINISHES
D3010 ENERGY SUPPLY
Red + 50 B2010 EXTERIOR WALLS
B2020 EXTERIOR WINDOWS
C1030 SPECIALTIES
D1020 WEIGHT HANDLING EQUIPMENT
D1030 ESCALATORS AND MOVING WALKS
D1090 OTHER CONVEYING SYSTEMS
D2020 DOMESTIC WATER DISTRIBUTION
D2030 SANITARY WASTE
D2040 RAIN WATER DRAINAGE
D2090 OTHER PLUMBING SYSTEMS
D3070 SYSTEMS TESTING & BALANCING
Service Life 40 Paint
For this project, the following building components are not included in the BUILDER Inventory and are not evaluated during the assessment unless significant damage or deterioration was observed or reported.
• A1010 STANDARD FOUNDATIONS
• A1020 SPECIAL FOUNDATIONS
• A1030 SLAB ON GRADE
• A2010 BASEMENT EXCAVATION
• A2020 BASEMENT WALLS
• B1010 FLOOR CONSTRUCTION
• B1020 ROOF CONSTRUCTION
• B2010 EXTERIOR WALLS
• C1010 PARTITIONS
• C2010 STAIR CONSTRUCTION
Damage that is not visible or that is unknown will not be reflected in facility condition index calculations. It is anticipated that unknown damage or deterioration is more likely to be present in older facilities than more modern facilities.
In addition, some building components are concealed or inaccessible. In accordance with BUILDER guidelines, quantities for concealed and inaccessible components have been estimated and recorded in the BUILDER Inventory but have not been rated. When concealed or inaccessible components are encountered, life cycle data contained within BUILDER is used to predict renewal requirements, which are included in facility condition index calculations. Components that are often concealed or inaccessible include:
• D2020 DOMESTIC WATER PIPING
• D2030 SANITARY WASTE PIPING
• D3040 HVAC DISTRIBUTION
• D4010 FIRE ALARM DISTRIBUTION
• D5020 ELECTRICAL BRANCH WIRING
In addition to the building components noted above, if a building component is concealed or inaccessible, life cycle data contained within BUILDER is used to predict renewal requirements.
When a work plan is created, the CSCI of a component-section is compared to its associated standard. If the CSCI is less than or equal to the threshold in the standard, the remaining service life is evaluated. If the service life is less than the standard’s remaining service life, BUILDER will add this section to the work plan and generate dollars to estimate a cost for the replacement.
If the CSCI is less than or equal to the threshold in the standard and the service life is greater than the standard’s remaining service life, BUILDER will conduct a cost benefit analysis. The cost benefit analysis will determine whether the component-section should be repaired or left to expire at the end of its service life. When BUILDER determines a repair is the correct action, BUILDER will add this section to the work plan and generate dollars to estimate a cost for the repair.
When BUILDER determines a taking no action is more cost effective, BUILDER will not add the component-section to the work plan. For example, if the CSCI for an external door component-section is 50 with a remaining service life of five years, BUILDER will compare the CSCI of 50 to the CI Threshold set by DoDEA and determine that is 50 is less than the threshold of 61. BUILDER will compare the five years of remaining services life against the zero years of the threshold and determine a cost benefit analysis is required. The results of the cost benefit analysis will typically be to take no action and let the component-section run until the end of its service life before generating an item in the work plan.
A typical life cycle of a component-section is explained below.
Condition Work Plan CSCI > threshold Work plan does not generate an item for the component-section CSCI = threshold or just below it Work plan will generate a repair item for the component-section CSCI < threshold and the remaining service life > service life threshold
Work plan will remove the repair item for the component-section. It is too costly to repair so it is better to wait to replace it.
Remaining service life < service life threshold Work plan will generate a replace item for the component-section
Facility Condition Assessment Data Analysis In multiple building portfolios and especially with widespread geographic portfolios, it is important to know how building conditions compare. The Condition Index (CI) and Quality Ratings (Q-Ratings) are determined for each building assessed using guidelines shown below.
Condition Index (CI) – A measure of the constructed asset’s condition at a specific point in time with respect to physical condition and ability to support the current occupant or mission. CI is calculated as the ratio of estimated cost of maintenance and repair requirements to Plant Replacement Value (PRV).
Maintenance and repair requirements consist of that work necessary to ensure that a constructed asset is restored to a condition substantially equivalent to the originally intended and designed capacity, efficiency or capability. The formula for Condition Index is:
!" = $ − '()*+,-).)/012(3 4x 100
Q-Rating Bands – Bands allow OSD, Military Services, and Defense Agencies/Activities to group facilities by condition for the purposes of developing investment strategies.
TABLE 1: Q-RATING DESCRIPTIONS
Rating Band
Calculated Rating (Condition Index)
General Description
Q-1 100% to 90% Facility new or well maintained (Good Condition)
Q-2 89% to 80% Facility is satisfactorily maintained (Fair Condition)
Q-3 79% to 60% Facility is under maintained (Poor Condition)
Q-4 59% to 0% Facility should be considered for replacement (Failing Condition)
Plant Replacement Value – Cost of replacing the existing constructed asset at today’s standards, adjusted for location (Area Cost Factor; ACF), overhead costs such as planning and design (P&D), supervision, inspection and overhead factor (SIOF), and other construction overhead costs (reference United Facilities Criteria (UFC) 3-701-13). The formula for PRV is:
Plant Replacement Value = Facility Quantity x Replacement Unit Cost x Area Cost Factor1 x Historical Records Adjustment2 x Planning and Design Factor3 x Supervision Inspection and Overhead Factor4 x Contingency Factor5
1A geographic location adjustment for costs of labor, material, and equipment, published in Chapter 4.
2An adjustment to account for increased costs for replacement of historical facilities or for construction in a historic district; the current value of the factor is 1.05.
3 A factor to account for the planning and design of a facility; the current value of this factor is 1.09 for all but medical facilities and 1.13 for medical facilities.
4 A factor to account for the supervision, inspection, and overhead activities associated with the management of a construction project; the current value of the factor is 1.057 for facilities in the continental US (CONUS) and 1.065 for facilities outside the continental US (OCONUS).
5 A factor to account for construction contingencies; the current value of the factor is 1.05.
BUILDER Report Overview
Outlined below is a summary and description of the reports that are included.
Appendix C - Facility Summary Report – Provides a summation of FCA results. A Building Summary Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating.
The purpose of this report is to provide a general overview of the building including key performance indicators.
This report was generated using DoDEA's calculated Replacement Cost overwriting the data populated from real property records. This provides a more accurate Replacement Cost due to the inconsistencies with real property reconciliation between DoDEA and the Services. The DoD Facility Pricing Guide and DoDEA measurements for building square footage were used to calculate the Replacement Cost.
Appendix D - Building System Condition Index (SCI) By System – Provides an overview of inspected systems and their condition index rating. A Building System Condition Index (SCI) By System Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating.
Appendix E - Work Items By Building – Provides a list of work items requiring repair or replacement of system/components, including budgets, for project planning purposes. A Work Plan Detail by Year Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating.
Appendix F - Remaining Service Life (RSL) Detail Report – Provides a detailed overview of systems/components, including descriptions, and their respective age, remaining service life and remaining paint life.
Appendix G - Distress Survey Inspection By Section Report - Provides a summary of distress survey details collected within each facility.
Appendix H -Direct Condition Rating Inspection By Section Report – Provides a summary of direct condition ratings for each component-section collected within each facility.
Appendix I - System Inventory Report – Provides a list of details for each component-section collected within each facility.
Note: All reports are generated from the DoDEA BUILDER database. In the event line items within a report are compressed and difficult to read, this is a result of how BUILDER generates the report. It is our understanding that CERL is working to update the report format.
Summary of Terms
Acronyms Description BCI Building Condition Index - Measures the condition of the building as a whole. The higher the BCI, the better.
BFI Building Functionality Index - Measures the functionality of a building as a whole.
The higher the BFI, the better.
BPI Building Performance Index - Measures the overall performance of a building. The higher the BPI, the better.
EA Each ESC Emergency Service Call FCI Facility Condition Index - The current maintenance, repair, and replacement deficiencies of the facility divided by the current replacement value of the facility, derives the FCI of a facility. The higher the FCI, the better.
GSF Gross Square Foot ISR Installation Status Report - Measures installation condition against Army-wide standards.
LF Linear Feet MBH Thousands of BTU per hour.
MDI Mission Dependency Index - Measures how critical a facility is to the overall mission of its owner. The higher the MDI, the more critical.
PERM Permanent RELO Relocatable RPL Remaining Paint Life - Displays the remaining paint life, in years, of a section.
RPUID Real Property Unique Identifier - The unique identification number assigned to each asset.
RSL Remaining Service Life - Displays the remaining service life, in years, of a section.
SCI System Condition Index - Measures the condition of a system as a whole. The higher the SCI, the better.
SF Square Foot TEMP Temporary UM Unit of Measure
Appendix C
Facility Summary Report
VS20160115 - Cplx
170 - Daegu MS/HS Bldg 170 Camp Walker - DAEGU MS/HS https:\\builder.sms.erdc.dren.mil/dodea/files/images/d54b87b1-c749-4b68-831a-bc71576556c5/Bldg_170_-_2018_00003.JPG
YEAR BUILT: 2017
AREA (SF): 142,268
PLANT REPLACEMENT COST: $56,051,459
SURVEY DATE: March 2018
TOTAL DEFICIENCIES: $0
BUILDER(TM) METRIC SCORE
Facility Condition Index FCI: 100
DoDEA Facility Summary Report - Page 18/3/2018 4:20:36 PM
Appendix D
System Summary Report
VS20160115 -
Cplx
DoDEA SYSTEM SUMMARY Camp Walker
Complex Building # Building Name A10 A20 B10 B20 B30 C10 C20 C30 D10 D20 D30 D40 D50 E10 E20 F10 F20 G10 G20 G30 G40 G90
DAEGU MS/HS 170 Daegu MS/HS Bldg 170 0 0 0 96 94 96 96 92 94 99 97 100 95 93 0 0 0 0 0 0 0 0
A10 - Foundations C20 - Stairs D50 - Electrical G10 - Site Preparations
A20 -Basement Construction C30 - Interior Finishes E10 - Equipment G20 - Site Improvements
B10 - Superstructure D10 - Conveying E20 - Furnishings G30 - Site Civil / Mech Utilities
B20 - Exterior Enclosure D20 - Plumbing F10 - Special Construction G40 - Site Electrical Utilities
B30 - Roofing D30 - HVAC F20 - Selective Building Demo G50 - Other Site Construction
C10 - Interior Construction D40 - Fire Protection
DoDEA System Summary Report - Page 18/3/2018 4:21:01 PM System Summary is based on the ASTM uniformat II, Level 2 Group Elements (ASTM E1557)
Appendix E
Work Items By Building
No data was returned from the query. There is no data to show in this report.
Appendix F
Remaining Service Life (RSL) Detail Report
B20 EXTERIOR ENCLOSURE B2010 EXTERIOR WALLS 2017 B201001 EXTERIOR CLOSURE Brick Veneer w/CMU Backup 1 49
B2010 EXTERIOR WALLS 2017 B201001 EXTERIOR CLOSURE E.I.F.S. 1 33 Unknown
B2010 EXTERIOR WALLS 2017 B201001 EXTERIOR CLOSURE Metal Siding 1 20
B2010 EXTERIOR WALLS 2017 B201004 PARAPETS General 1 13
B2010 EXTERIOR WALLS 2017 B201005 EXTERIOR LOUVERS & SCREENS General 1 13
B2010 EXTERIOR WALLS 2017 B201007 EXTERIOR SOFFITS General 1 13
B2010 EXTERIOR WALLS 2017 B201008 FLASHING General 1 13
B2010 EXTERIOR WALLS 2017 B201010 EXTERIOR JOINT SEALANT General 1 13
B2010 EXTERIOR WALLS 2017 B201011 SUN CONTROL DEVICES General 1 13
B2020 EXTERIOR WINDOWS 2017 B202001 WINDOWS Aluminum Windows 1 49
B2030 EXTERIOR DOORS 2017 B203001 SOLID DOORS Steel 1 13
B2030 EXTERIOR DOORS 2017 B203004 OVERHEAD AND ROLL-UP DOORS General 1 13
B2030 EXTERIOR DOORS 2017 B203090 OTHER EXTERIOR SPECIALTY DOORS Emergency Egress Door
1 13
B30 ROOFING B3010 ROOF COVERINGS 2017 B301001 STEEP SLOPE ROOF SYSTEMS Formed Metal - Metal Standing Seam
1 20
B3010 ROOF COVERINGS 2017 B301002 LOW SLOPE ROOF SYSTEMS General 1 6
B3010 ROOF COVERINGS 2017 B301003 ROOF INSULATION & FILL General 1 18
B3010 ROOF COVERINGS 2017 B301004 FLASHINGS & TRIM Flashings - Base 1 16
B3010 ROOF COVERINGS 2017 B301004 FLASHINGS & TRIM Flashings - Cap 1 16
B3010 ROOF COVERINGS 2017 B301004 FLASHINGS & TRIM Flashings - Embedded Edge Metal 1 16
B3010 ROOF COVERINGS 2017 B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations 1 16
B3010 ROOF COVERINGS 2017 B301004 FLASHINGS & TRIM Flashings - Pitch Pans 1 16
B3010 ROOF COVERINGS 2017 B301005 GUTTERS & DOWNSPOUTS Downspouts 1 13
B3010 ROOF COVERINGS 2017 B301005 GUTTERS & DOWNSPOUTS Gutters 1 13
C10 INTERIOR
CONSTRUCTION
C1010 PARTITIONS 2017 C101001 FIXED PARTITIONS Wall - Concrete Block 1 49
C1010 PARTITIONS 2017 C101001 FIXED PARTITIONS Wall - Drywall w/Stud Framing 1 33 Unknown
C1010 PARTITIONS 2017 C101003 RETRACTABLE PARTITIONS General 1 13
C1010 PARTITIONS 2017 C101005 INTERIOR WINDOWS Interior Windows 1 33
C1010 PARTITIONS 2017 C101005 INTERIOR WINDOWS Metal Rollup / Coiling Grille 1 13
C1010 PARTITIONS 2017 C101006 GLAZED PARTITIONS & STOREFRONTS General 1 13
C1020 INTERIOR DOORS 2017 C102001 STANDARD INTERIOR DOORS Wood Door/Metal Frame 1 26
DAEGU MS/HS (HE6410)170 - Daegu MS/HS Bldg 170
Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem
Camp Walker
Remaining Service Life (RSL) Detail Report
C1020 INTERIOR DOORS 2017 C102001 STANDARD INTERIOR DOORS Wood Door/Wood Frame 1 26
Page 1 of 6August 03, 2018
C1020 INTERIOR DOORS 2017 C102002 GLAZED INTERIOR DOORS General 1 26
C1020 INTERIOR DOORS 2017 C102003 FIRE DOORS Fire Door - Swinging, Metal 1 20
C1020 INTERIOR DOORS 2017 C102003 FIRE DOORS Fire Door - Swinging, Wood 1 20
C1020 INTERIOR DOORS 2017 C102004 SLIDING & FOLDING DOORS Rolling, Steel, Electric, 10' x 10' 1 20
C1030 SPECIALTIES 2017 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Shower Compartment
1 13
C1030 SPECIALTIES 2017 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Toilet Partitions
1 13
C1030 SPECIALTIES 2017 C103002 TOILET & BATH ACCESSORIES General 1 13
C1030 SPECIALTIES 2017 C103003 MARKER BOARDS & TACK BOARDS General 1 13
C1030 SPECIALTIES 2017 C103005 LOCKERS General 1 20
C1030 SPECIALTIES 2017 C103008 COUNTERS Corian 1 20
C1030 SPECIALTIES 2017 C103008 COUNTERS Laminated Plastic 1 20
C1030 SPECIALTIES 2017 C103009 CABINETS General 1 33
C1030 SPECIALTIES 2017 C103010 CASEWORK General 1 13
C1030 SPECIALTIES 2017 C103014 ENTRANCE FLOOR GRILLES AND MATS General 1 18
C20 STAIRS C2010 STAIR CONSTRUCTION 2017 C201001 INTERIOR AND EXTERIOR STAIRS Interior Stairs 1 66
C2010 STAIR CONSTRUCTION 2017 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General
1 13 Unknown
C30 INTERIOR FINISHES C3010 WALL FINISHES 2017 C301004 TILE & TERRAZZO WALL FINISHES Tile 1 49
C3010 WALL FINISHES 2017 C301005 WALL COVERINGS Metal Panel 1 26
C3010 WALL FINISHES 2017 C301006 ACOUSTICAL PANELS ADHERED TO WALLS General 1 59
C3010 WALL FINISHES 2017 C301090 OTHER WALL FINISHES General 1 9
C3020 FLOOR FINISHES 2017 C302001 TILE FLOOR FINISHES Ceramic Tile 1 49
C3020 FLOOR FINISHES 2017 C302003 WOOD FLOORING General 1 26
C3020 FLOOR FINISHES 2017 C302004 RESILIENT FLOOR FINISHES Cork Tile 1 26
C3020 FLOOR FINISHES 2017 C302004 RESILIENT FLOOR FINISHES Rubber Sheet 1 26
C3020 FLOOR FINISHES 2017 C302004 RESILIENT FLOOR FINISHES Vinyl Tile 1 7
C3020 FLOOR FINISHES 2017 C302010 HARDENERS AND SEALERS General 1 26
C3030 CEILING FINISHES 2017 C303002 GYPSUM WALLBOARD CEILING FINISHES General 1 83
C3030 CEILING FINISHES 2017 C303005 SUSPENSION SYSTEMS General 1 13
C3030 CEILING FINISHES 2017 A C303001 ACOUSTICAL CEILING TILES & PANELS General 1 46
C3030 CEILING FINISHES 2017 B C303001 ACOUSTICAL CEILING TILES & PANELS General 1 7
D10 CONVEYING
DAEGU MS/HS (HE6410)170 - Daegu MS/HS Bldg 170
Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem
Camp Walker
Remaining Service Life (RSL) Detail Report
D1010 ELEVATORS AND LIFTS 2017 D101002 PASSENGER ELEVATORS Hydraulic Elevators - 3500 lb, 2 floors 1 16
Page 2 of 6August 03, 2018
D20 PLUMBING D2010 PLUMBING FIXTURES 2017 D201001 WATERCLOSETS General 1 13
D2010 PLUMBING FIXTURES 2017 D201002 URINALS General 1 13
D2010 PLUMBING FIXTURES 2017 D201004 SINKS General 1 13
D2010 PLUMBING FIXTURES 2017 D201004 SINKS Service Sink 1 13
D2010 PLUMBING FIXTURES 2017 D201005 SHOWERS/TUBS General 1 13
D2010 PLUMBING FIXTURES 2017 D201006 DRINKING FOUNTAINS AND COOLERS Water Cooler 1 13
D2010 PLUMBING FIXTURES 2017 D201090 OTHER PLUMBING FIXTURES Emergency Eye Wash 1 16
D2020 DOMESTIC WATER
DISTRIBUTION
2017 D202001 PIPES & FITTINGS General 1 48
D2020 DOMESTIC WATER
DISTRIBUTION
2017 D202003 DOMESTIC WATER EQUIPMENT Storage Tank - Galvanized steel, 500 gallon, 36" diameter,126" L.O.A.
1 20
D2020 DOMESTIC WATER
DISTRIBUTION
2017 D202003 DOMESTIC WATER EQUIPMENT Water Heaters, Commercial, Gas - 600 MBH input, 576 GPH
1 6
D2020 DOMESTIC WATER
DISTRIBUTION
2017 D202003 DOMESTIC WATER EQUIPMENT Water Treatment Equipment - Chemical Treatment
1 13
D2030 SANITARY WASTE 2017 D203001 WASTE PIPE & FITTINGS General 1 48
D2030 SANITARY WASTE 2017 D203002 VENT PIPE & FITTINGS General 1 18
D2030 SANITARY WASTE 2017 D203003 FLOOR DRAINS General 1 13
D30 HVAC D3020 HEAT GENERATING SYSTEMS 2017 D302001 BOILERS Gas, Hot Water - 1800-2500 MBH 1 20
D3020 HEAT GENERATING SYSTEMS 2017 D302004 AUXILIARY EQUIPMENT Expansion Tank - 60 gal 1 20
D3030 COOLING GENERATING
SYSTEMS
2017 D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 270 TN, Air Cooled Screw Liquid Chiller
1 13
D3040 DISTRIBUTION SYSTEMS 2017 D304001 AIR DISTRIBUTION, HEATING & COOLING Ductwork 1 38
D3040 DISTRIBUTION SYSTEMS 2017 D304001 AIR DISTRIBUTION, HEATING & COOLING Humidifier - 50 lb.
per hour
1 6
D3040 DISTRIBUTION SYSTEMS 2017 D304003 HOT WATER DISTRIBUTION SYSTEMS Circulating Pump, End Suction - 5" size, 15 HP, to 1000 GPM
1 13
D3040 DISTRIBUTION SYSTEMS 2017 D304003 HOT WATER DISTRIBUTION SYSTEMS General 1 18
D3040 DISTRIBUTION SYSTEMS 2017 D304006 CHILLED WATER DISTRIBUTION SYSTEMS Circulating Pump, End Suction - 6" size, 25 HP, to 1550 GPM
1 13
D3040 DISTRIBUTION SYSTEMS 2017 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General 1 18
D3040 DISTRIBUTION SYSTEMS 2017 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 13,800 CFM 1 13
D3040 DISTRIBUTION SYSTEMS 2017 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 1500 CFM 1 6
D3040 DISTRIBUTION SYSTEMS 2017 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 2750 CFM 1 13
D3040 DISTRIBUTION SYSTEMS 2017 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 500 CFM 1 13
D3040 DISTRIBUTION SYSTEMS 2017 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 800 CFM 1 13
D3040 DISTRIBUTION SYSTEMS 2017 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 8500 CFM 1 13
D3040 DISTRIBUTION SYSTEMS 2017 D304007 EXHAUST SYSTEMS Kitchen Exhaust/Make-Up Air - 12,000
CFM
1 13
DAEGU MS/HS (HE6410)170 - Daegu MS/HS Bldg 170
Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem
Camp Walker
Remaining Service Life (RSL) Detail Report
D3040 DISTRIBUTION SYSTEMS 2017 D304008 AIR HANDLING UNITS Central Station - 5000 CFM 1 10
Page 3 of 6August 03, 2018
D3040 DISTRIBUTION SYSTEMS 2017 D304008 AIR HANDLING UNITS Central Station - 10000 CFM 1 10
D3040 DISTRIBUTION SYSTEMS 2017 D304008 AIR HANDLING UNITS Central Station - 15000 CFM 1 10
D3040 DISTRIBUTION SYSTEMS 2017 A D304008 AIR HANDLING UNITS Central Station - 5000 CFM 1 10
D3040 DISTRIBUTION SYSTEMS 2017 A D304008 AIR HANDLING UNITS Central Station - 10000 CFM 1 10
D3040 DISTRIBUTION SYSTEMS 2017 A D304008 AIR HANDLING UNITS Central Station - 15000 CFM 1 10
D3040 DISTRIBUTION SYSTEMS 2017 B D304008 AIR HANDLING UNITS Central Station - 5000 CFM 1 10
D3050 TERMINAL & PACKAGE UNITS 2017 D305001 UNIT VENTILATORS Make-Up Air Unit - 10,000 CFM, 838 MBH, includes standard controls
1 20
D3050 TERMINAL & PACKAGE UNITS 2017 D305001 UNIT VENTILATORS Make-Up Air Unit - 2000 CFM, 168 MBH, includes standard controls
1 20
D3050 TERMINAL & PACKAGE UNITS 2017 D305001 UNIT VENTILATORS Make-Up Air Unit - 6000 CFM, 502 MBH, includes standard controls
1 20
D3050 TERMINAL & PACKAGE UNITS 2017 D305002 UNIT HEATERS Hydronic - 20 MBH 1 20
D3050 TERMINAL & PACKAGE UNITS 2017 D305006 PACKAGE UNITS A/C Unit, Split Systems w/ Air Cooled Condenser - 10 TN
1 13
D3050 TERMINAL & PACKAGE UNITS 2017 D305006 PACKAGE UNITS A/C Unit, Split Systems w/ Air Cooled Condenser - 2 TN
1 13
D3050 TERMINAL & PACKAGE UNITS 2017 D305006 PACKAGE UNITS A/C Unit, Split Systems w/ Air Cooled Condenser - 4 TN
1 13
D3060 CONTROLS &
INSTRUMENTATION
2017 D306002 ELECTRONIC CONTROLS D.D.C controller (avg. 50' run in conduit), mechanical room, 32 point contr
1 6
D40 FIRE PROTECTION D4010 FIRE ALARM AND DETECTION
SYSTEMS
2017 D401001 FIRE ALARM DISTRIBUTION Other 1 18
D4020 FIRE SUPP WATER SUPPLY /
EQUIP
2017 D402002 FIRE PUMP 5" pump, 100 HP, 1000 GPM 1 13
D4090 OTHER FIRE PROTECTION
SYSTEMS
2017 D409004 HOOD & DUCT FIRE PROTECTION General 1 16
D50 ELECTRICAL D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501003 INTERIOR DISTRIBUTION TRANSFORMERS Buck-boost, 240 V primary 208/120 V secondary, 112.5 kVA
1 20
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501003 INTERIOR DISTRIBUTION TRANSFORMERS Buck-boost, 240 V primary 208/120 V secondary, 150 kVA
1 20
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501003 INTERIOR DISTRIBUTION TRANSFORMERS Buck-boost, 240 V primary 208/120 V secondary, 225 kVA
1 20
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501003 INTERIOR DISTRIBUTION TRANSFORMERS Buck-boost, 240 V primary 208/120 V secondary, 75 kVA
1 20
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD 1 20
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501004 PANELBOARDS Main lugs, 125 amp 1 13
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501004 PANELBOARDS Main lugs, 400 amp 1 13
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501004 PANELBOARDS Main lugs, 600 amp 1 13
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501004 PANELBOARDS Switchgear - 2000 Amp 1 33
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501004 PANELBOARDS Switchgear - 800 Amp 1 33
D5010 ELECTRICAL SERVICE &
DISTRIBUTION
2017 D501006 MOTOR CONTROL CENTERS Motor Control Center - Size 2, 25 HP, 18" high
1 26
D5020 LIGHTING & BRANCH WIRING 2017 D502001 BRANCH WIRING General 1 58
D5020 LIGHTING & BRANCH WIRING 2017 D502002 LIGHTING EQUIPMENT Exit Lighting 1 13
DAEGU MS/HS (HE6410)170 - Daegu MS/HS Bldg 170
Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem
Camp Walker
Remaining Service Life (RSL) Detail Report
D5020 LIGHTING & BRANCH WIRING 2017 D502002 LIGHTING EQUIPMENT General 1 13
Page 4 of 6August 03, 2018
D5030 COMMUNICATIONS &
SECURITY
2017 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets 1 13
D5030 COMMUNICATIONS &
SECURITY
2017 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 1 10
D5030 COMMUNICATIONS &
SECURITY
2017 D503005 SECURITY SYSTEMS General 1 13
D5030 COMMUNICATIONS &
SECURITY
2017 D503007 CLOCK & PROGRAM SYSTEMS General 1 13
D5090 OTHER ELECTRICAL
SERVICES
2017 D509002 EMERGENCY LIGHTING & POWER General 1 13
D5090 OTHER ELECTRICAL
SERVICES
2017 D509003 GROUNDING SYSTEMS General 1 48
D5090 OTHER ELECTRICAL
SERVICES
2017 D509004 LIGHTNING PROTECTION Unknown 1 33
E10 EQUIPMENT E1090 OTHER EQUIPMENT *Braising Pan E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Cold Pan Single Basin A E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Cold Pan Single Basin B E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Convection Oven Single A E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Convection Oven Single B E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Convection Oven Single C E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Convection Oven Single D E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Convection Oven Single E E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Convection Oven Single F E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Dish Machine E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Disposer A E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Disposer B E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Griddle E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Hot Cabinet Pass Thru 2 Dr A E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Hot Cabinet Pass Thru 2 Dr B E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Hot Cabinet Pass Thru 2 Dr C E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Ice Machine E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Kettle Electric E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Milk Cooler E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Pizza Oven Double Tier A E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Pizza Oven Double Tier B E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Refrigerator Pass Thru 2 Dr A E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Refrigerator Pass Thru 2 Dr B E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Refrigerator Reach In 2 Dr E109002 FOOD SERVICE EQUIPMENT General 1 13
DAEGU MS/HS (HE6410)170 - Daegu MS/HS Bldg 170
Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem
Camp Walker
Remaining Service Life (RSL) Detail Report
E1090 OTHER EQUIPMENT *Refrigerator Reach In 4 Dr A E109002 FOOD SERVICE EQUIPMENT General 1 13
Page 5 of 6August 03, 2018
E1090 OTHER EQUIPMENT *Refrigerator Reach In 4 Dr B E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Steam Counter Electric Multi Basin A E109002 FOOD SERVICE EQUIPMENT General
1 13
E1090 OTHER EQUIPMENT *Steam Counter Electric Multi Basin B E109002 FOOD SERVICE EQUIPMENT General
1 13
E1090 OTHER EQUIPMENT *Steamer 1 Door A E109002 FOOD SERVICE EQUIPMENT General 1 13
E1090 OTHER EQUIPMENT *Steamer 1 Door B E109002 FOOD SERVICE EQUIPMENT General 1 13
DAEGU MS/HS (HE6410)170 - Daegu MS/HS Bldg 170
Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem
Camp Walker
Remaining Service Life (RSL) Detail Report
Page 6 of 6August 03, 2018
Appendix G
Distress Survey Inspection By Section Report
No data was returned from the query. There is no data to show in this report.
Appendix H
Direct Condition Rating Inspection By Section Report
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Braising Pan E109002 FOOD SERVICE EQUIPMENT General
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Cold Pan Single Basin A E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Cold Pan Single Basin B E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Convection Oven Single A E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Convection Oven Single B E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Convection Oven Single C E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?29-Mar-2018 NoG
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Convection Oven Single D E109002 FOOD SERVICE
170 - Daegu MS/HS Bldg 170 DAEGU MS/HS (HE6410)
Camp Walker
ComponentSection Description Quantity (UM)System
Direct Condition Rating Inspection Report by Section
Page 1 of 25August 03, 2018
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Convection Oven Single E E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Convection Oven Single F E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Dish Machine E109002 FOOD SERVICE EQUIPMENT General
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Disposer A E109002 FOOD SERVICE EQUIPMENT General
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Disposer B E109002 FOOD SERVICE EQUIPMENT General
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Griddle E109002 FOOD SERVICE EQUIPMENT General
170 - Daegu MS/HS Bldg 170 DAEGU MS/HS (HE6410)
Camp Walker
ComponentSection Description Quantity (UM)System
Page 2 of 25August 03, 2018
Inspection Comments:
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Hot Cabinet Pass Thru 2 Dr A E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Hot Cabinet Pass Thru 2 Dr B E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Hot Cabinet Pass Thru 2 Dr C E109002 FOOD SERVICE
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Ice Machine E109002 FOOD SERVICE EQUIPMENT General
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Kettle Electric E109002 FOOD SERVICE EQUIPMENT General
Last Inspection Date: Condition Rating: Used Sampling?
Inspector:
29-Mar-2018 Ryan Ellis
No Inspection Source:
G Inspection
Inspection Comments:
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Milk Cooler E109002 FOOD SERVICE EQUIPMENT General
Last Inspection Date: Condition Rating: Used Sampling?29-Mar-2018 NoG
E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*Pizza Oven Double Tier A E109002 FOOD SERVICE
170 - Daegu MS/HS Bldg 170 DAEGU MS/HS (HE6410)
Camp Walker
ComponentSection Description Quantity (UM)System
Page 3 of 25August 03,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .