00017636 Exhibit G Site Maps.docx
DOCX document 18 MB Posted
- Attached to
- SPR892_879: Phase 3 CPT Wickiup
- Solicitation number
- S-73000-00017636
- Issued by
- Oregon
About this file
This document is an Exhibit G containing site maps for a Scope of Work and Technical Specifications related to a diatomaceous silt research drilling contract involving Oregon State University (OSU), Portland State University (PSU), and the Oregon Department of Transportation (ODOT). The project involves providing seismic cone penetration testing with pore water pressure measurement (SCPTu) as part of a geotechnical investigation at the Wikiup Junction site, which is known to be underlain by diatomaceous soils. The site maps depict the Vicinity map and detailed site view for Wikiup Junction explorations, with specific notation of potential CPT (cone penetration test) sites and borehole locations. Access to the East CPT site locations is from the North after Burgess Road (marked with an orange star), while access to the West CPT site locations is from the South off Highway 97 (marked with a blue star). The project work is to be contained within the ODOT Right-of-Way, with the green line on the detailed map representing the general boundary of this right-of-way.
Critical safety restrictions are clearly delineated on the site maps: no vehicles or personnel may cross the railroad tracks depicted as a red line on either map, and all work personnel and equipment must remain at least 50 feet from the tracks during project execution. These maps serve as essential planning documents for bidders to understand the geographic layout, access points, and operational constraints of the research drilling contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017636 Exhibit A Scope or Work and Technical Specifications.docx | DOCX document | |
| 00017636 Invitation.To.Bid.Services.docx | DOCX document | |
| 00017636 Bid.Cover.Sheet.docx | DOCX document | |
| 00017636 Exhibit H FHWA Form 1273.pdf | ||
| 00017636 Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00017636 Sample.Contract.docx | DOCX document | |
| 00017636 Exhibit F ODOT Best Management For Drilling Practice.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT G
CPT Site Maps with Expected Drill Holes
SCOPE OF WORK AND TECHNICAL SPECIFICATIONS
OSU DIATOMACEOUS SILT RESEARCH DRILLING CONTRACT
Fall 2018 Page 1 of 13
SCOPE OF WORK AND TECHNICAL SPECIFICATIONS
PSU/OSU DIATOMACEOUS SILT RESEARCH CPT
June 2026 Page 13 of 19
Figure 1: Vicinity map of Wikiup Junction Site. Potential CPT sites and potential Borehole locations depicted. For East CPT site locations entry will be North after Burgess Road depicted with Orange star. For West CPT site locations entry will be to the South off Hwy97 depicted with Blue star. No vehicles or personnel may cross the RR tracks depicted as red line and during work remain 50 feet from the tracks.
Figure 2: Detailed site view for Wikiup Junction explorations. Green line is general representation of ODOT Right-of-Way, project work will be contained in ODOT Right-of-Way. No vehicles or personnel may cross the RR tracks depicted as red line and during work remain 50 feet from the tracks.
image1.png image2.png image3.png image4.png