Picture Rock Pass RWIS Installation Plans Summary
This is a set of technical installation plans for a Road Weather Information System (RWIS) facility prepared by the Oregon Department of Transportation for Lake County on Fremont Highway (OR 31) at milepost 62.34. The project involves establishing a complete RWIS compound with solar-powered equipment to monitor road and weather conditions. The plans specify detailed construction requirements for site preparation, including a fenced compound with specific dimensions, a concrete pad foundation, installation of a RWIS pole with solar array components, battery enclosure, control cabinet, and various monitoring equipment including anemometers, temperature and humidity sensors, and a fixed camera system. The installation requires extensive conduit work for electrical distribution, with specifications for both metallic and non-metallic conduit depending on location and application, ranging from 1.5 inches to 2 inches in diameter. The plans reference the 2024 Standard Specifications for Highway Construction and include detailed material specifications, hardware requirements, and wiring diagrams for the complete electrical system, including solar photovoltaic arrays, battery charging systems, and data collection equipment.
The technical specifications require all materials to comply with ASTM standards and ODOT specifications, with emphasis on corrosion-resistant hardware including hot-dipped galvanized steel, Type 304 and 316 stainless steel components. The plans detail conduit installation methods including open trench excavation with minimum cover depths ranging from 12 to 30 inches depending on location and conduit type, as well as provisions for horizontal directional drilling. All electrical wiring must be clearly labeled and continuous from source to termination points with no splices permitted. The project requires coordination with the Oregon Utility Notification Center for locate services prior to excavation, compliance with OAR standards for utility safety, and engineer approval for cable routing and installation procedures. The plans were prepared by professional engineers including Blaine Van Dyke and Ron Blacketer, with a renewal date of June 30, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00016932 Prelim Bid Results~1.xlsx | XLSX spreadsheet | |
| 00016932 RFCQ.docx | DOCX document | |
| 00016932 Quote Pricing Form.xlsx | XLSX spreadsheet | |
| 00016932 Specifications.pdf | ||
| 00016932 Sample Contract.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEET
0 50250
FEET
0 5025
SCALE 1:240
Picture Rock Pass_pl_01.dgn :: Default 4/30/2026 12:00:51 PM hwye26z 1"=20' Scale: Rotation: 0°
N LINE TYPES
Install conduit
Edge of gravel
Fog line
Edge of pavement
Centerline
Right of way R/W
R /W
R /W
R /W
R /W
30'-0"
F R
E M
O N
T
H I
G H
W A
Y
(0
O R
S
B
FREMONT HWY. (019) OR 31, MP 62.34 SB
INSTALLATION PLAN
PICTURE ROCK PASS RWIS
series sheets.
See details on KB information system.
Install road weather
General Notes:
. NW corner of RWIS compound will be staked by Agency prior to construction. 2 underground facility when excavation or drilling is to be made within 5 feet of the Utility locate.
Employ hand tools or other non-invasive methods to determine the exact location of the obtained from the Center. Prior to excavation or drilling, verify depth and location of Utilities.
adopted by the Oregon Utility Notifications Center, to be observed. Copies of these rules may be
1. Oregon law requires the rules set forth in OAR 952-001-0010 through 950-001-0090
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
LAKE COUNTY
FREMONT HIGHWAY
PICTURE ROCK PASS RWIS
Blaine Van Dyke
Blaine Van Dyke Ron Blacketer
Doug Spencer
SITE PLAN
INTELLIGENT TRANSPORTATION SYSTEMS
KA01
LAKE
M.P.: 62.34
HWY: 019
ITS-2301
COUNTY
ITS DWG. NO.
RENEWS: 06-30-2026
86005PE
OREGON
REENIGN
E
E K
Y
D NAV .C
ENI
A
L
B
02 ,21
Y L
U
J OREGON
L A
N
OI
SS
EF
ORP DERE
T
SI
G
E R
ACCOMPANIED BY DWGS.:
TM700, TM701, TM702
30'-0"
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R
N
General Notes:
Notes:
CL-8
TYPE
TUBULAR
(in.)
nom. dia.
TOP RAILS
AND
BRACE
LINE POSTS
POSTS
GATE
1¼ 2½2
TUBULAR
(in.)
nom. dia.
END POST
INTERMEDIATE
END, CORNER &
TUBULAR
(in.)
nom. dia.
TUBULAR
(in.)
nom. dia.
WIRE
TENSION
ROD
TRUSS
2½
(in.)
nom. dia.
(in.)
nom. dia.
(7 gauge)
0.177 ⅜ 10 Double
OPENING
GATE
and type distance (feet)
S T
E E
L
MEMBER
RWIS COMPOUND LAYOUT
fabric, see Note 1.
Subgrade geotextile
No Scale
YARD SURFACE TYPICAL
earth Smooth, compacted
4" (min.)
aggregate base.
¾" (-) crushed
RWIS COMPOUND LAYOUT
No Scale
15'-0"
20'-0"
A
B enclosure Battery
E
KB02
5'-0" 9'-0"
11'-0" 3'-0"
RWIS pole
7'-0"
Solar array
3'-0"
3'-0" this sheet.details on Junction box, see
C
Line post
Ground line
Tension wire
Line post
Tension wire barbed wire.
3 strands of 4-point gate post.
Corner or footing Concrete
Stretcher bar
FENCE DETAIL
12" dia. (min.) 9" dia. (min.)
2"
4"
12"
4"
12"
B
- No Scale
(min.)
3'-0"
(min.)
3'-0" fabric 8'-0"
10'-0" 10'-0" arms at 45° angle.
Barbed wire support
0.1205" dia. (11 ga.).
Chain link fabric 2" mesh, brace rail Horizontal barbed wire 3 strands of 4-point
Truss rod
Gate post Stretcher bar
Gate post
10'-0"
No Scale
4"
DOUBLE GATE DETAILA
(min.)
3'-0"
1½" sch. 40 pipe.
Steel gate frame
0.1205" dia. (11 ga.).
Chain link fabric 2" mesh, must have end caps.
Ball top, typ. All open posts
12" dia. (min.)
Concrete footing,
3. All conduit within fenced area shall be 2 in. Sch. 40 PVC, unless noted otherwise.
2. Gate posts on each side of a gate opening shall be the same size.
. perform all work according to the 2024 Standard Specifications for Highway Construction.2 for general hardware specifications. KB021. See Material Table on
No Scale C
BATTERY ENCLOSURE
on a battery away from vents and not in contact with the enclosure or any other metal surface.
4. Install charge controller temperature sensor in battery enclosure. Ensure that the sensor is placed
3. Separation of batteries must be 1 in. (min.) for ventilation.
Concrete shall have minimum compressive strength of 3000 psi.
2. 4" thick concrete pad with 4 x 4 W2.9 x W2.9 welded wire reinforcement at centerline of slab.
02320. Minimum edge overlap must be 12 in.
1. Install geotextile fabric following manufacturer's recommendations and in accordance with Section
RENEWS: 06-30-2026
86005PE
OREGON
REENIGNE
E K
YD NAV .C E
NI
A L
B
6102 ,21
YL
U
J OREGON
L A
N
OI
SSEFORP DERETSI
G
E R
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
LAKE COUNTY
FREMONT HIGHWAY
PICTURE ROCK PASS RWIS
Blaine Van Dyke
Blaine Van Dyke Ron Blacketer
Doug Spencer
EQUIPMENT DETAILS
INTELLIGENT TRANSPORTATION SYSTEMS
KB01
LAKE
M.P.: 62.34
HWY: 019
ITS-2302
COUNTY
ITS DWG. NO.
conduit, typ.
2" sch. 40 PVC
Install nylon snap-in bushings to protect conductors.
conduit depending on location.
Rigid metal conduit or liquid-tight flexible metal
CONDUIT HUB CONNECTION DETAIL
No Scale retainer, UL listed.
Liquid-tight sealing gasket with Type 316 SST
"O" ring.
nylon insulated, and UL listed with neoprene Conduit hub, hot-dipped galvanized, maleable iron, *This detail applies to all conduit connections to cabinets, enclosures, and housings.
or housing enclosure, Cabinet, with insulated throat, UL listed.
Install metallic galvanized steel or die cast zinc bushing
No. 6 AWG THWN green stranded copper wire.
install bonding lug and bond to nearest ground terminal with For conduit with conductors carrying over 50V in metallic conduit, 4", typ.
2" min. typ.
see Note 2. Concrete pad, instructions.
Install per manufacturer's embedment depth of 2 1/2".
at each corner. Minimum mechanical expansion anchor Install 1/2" dia. 304 SST
See Note 3. Strap batteries to enclosure, typ.
(Agency furnished).Battery enclosure typ.(Agency furnished), Battery
"LB" conduit fitting.
this sheet.Detail on See Conduit Hub Connection compacted aggregate 6" min. of ¾" (-)
Fiberglass conduit sweep.
See Note 4.
. (Agency furnished)sensor
Charge controller temperature
2" rigid PVC conduit
D
KB02
Picture Rock Pass_dt_01.dgn :: Default 4/30/2026 12:00:52 PM hwye26z
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
RENEWS: 06-30-2026
86005PE
OREGON
REENIGN
E
E K
Y
D NAV .C
ENI
A
L
B
02 ,21
Y L
U
J OREGON
L A
N
OI
SS
EF
ORP DERE
T
SI
G
E R
Blaine Van Dyke
Blaine Van Dyke Ron Blacketer
Doug Spencer
EQUIPMENT DETAILS
INTELLIGENT TRANSPORTATION SYSTEMS
KB02
LAKE
M.P.: 62.34
HWY: 019
ITS-2303
COUNTY
ITS DWG. NO.
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
LAKE COUNTY
FREMONT HIGHWAY
PICTURE ROCK PASS RWIS
Finished Grade
1.5" galv. rigid metal conduit.
SOLAR ARRAY INSTALLATION DETAIL
55°
55°
25'-0"
3'-0" min.
6" min.
9'-0" min.
2'-0" around pole base.
¾" (-) gravel compacted
Liquid-tight flexible conduit.
1.5" galv. rigid metal conduit.
see Note 1.Wood pole, No Scale manufacturer's recommended strapping, typ.
Secure to pole with module pole mount
.KB01See Conduit Hub Connection Detail on
.KB01See Conduit Hub Connection Detail on
"T" fitting.
see Note 2.Conduit straps, Plans for conduit routing.
Rigid PVC conduit, see Site
See Note 5.
8'-6" min.
grip for each cable, see Notes 3 & 6.
Provide cord (Agency furnished). Solar combiner, with MC4 plug terminations, typ.
Photovoltaic module cables, 10 AWG XHHW
(Agency furnished).Module pole mount
(Agency furnished).Qty. 1 photovoltaic module
(Agency furnished).Module pole mount
(Agency furnished).Qty. 3 photovoltaic modules
3'-0"
See Note 3.KB04. panel layout on for product information and 00985see pole, 36"x24"x10" Controller Cabinet centered on and conduit clamps, typ.
Secure conduit with framing channel
1.5" liquid-tight flexible conduit.
Rigid metal conduit
.KB01See Conduit Hub Connection Detail on
E
KB01
RWIS POLE INSTALLATION DETAIL
No Scale and conduit clamps, typ.
Secure conduit with framing channel 3'-0"
2" liquid-tight flexible conduit.
Rigid metal conduit
1'-6"
See Note 5.
8'-0" min.
Finished grade for size and destination.
Rigid PVC conduit, see Site Plans around pole base.
¾" (-) gravel compacted
2" galv. rigid metal conduit.
see Note 2. Conduit straps, typ.KB03, See Conduit Connection Detail on see Note 1.Wood pole, .KB03See Conduit Connection Detail on
See Notes 3 & 4. product information.
346 Cabinet, see ODOT Green Sheets for
KB03.See Termination Enclosure Detail on
7'-0"
30'-0"
1'-0"
2'-0"
2'-0"
(Agency furnished). sensor
Air temperature/relative humidity
A307 Grade A or B, galv. steel threaded rod.
Framing channel secured to pole with ASTM
"T" conduit fitting with cord grip for sensor cable.
.KB03See Anemometer Mounting Detail on
.KB03See Fixed Camera Pole Mounting Detail on
See Note 8.
. KB03See IR Illuminator Pole Mounting Detail on
Notes:
General Notes:
5. Orient photovoltaic modules due south for maximum sun exposure.
cable in cabinet.
4. All cables must be continuous to the cabinet. No splices will be accepted. Coil excess of each
3. Provide drip loops for all exposed cabling.
feet apart.
2. Secure loose cables with UV rated ties specified per the ODOT QPL. Spaced no more than 3 applies to all KB series sheets. this sheet 1. Material Table on
6. Install cord grips for photovoltaic module cables. Provide a single cord grip for each cable.
5. If pole is not located on a level area, measure the setting depth from the low side of the hole.
4. Secure cabinet to pole with ¾in. 316 stainless steel band straps.
copper ground wire.
3. Bond cabinet ground lug to ground rod in junction box with green type THWN No. 6 stranded apart and no more than 3 feet from end terminations. Use stand-off brackets as required.
2. Secure conduit to wood pole with listed two-hole conduit straps spaced no more than 10 feet
02120.10. 1. Provide ANSI 05.1 Class 4 wood pole per
D
KB01
MATERIAL DESCRIPTIONMATERIAL
Bolt
Nut
Washer
Framing channel
U-bolt
ASTM F436, galvanized steel
ASTM A307 Grade A or B, galvanized steel
Strut clamp
MATERIAL TABLE
Conduit straps ASTM A123 or A153 hot-dipped galvanized steel, UL 2239 listed
Conduit fittings
Reducer
Cord grip
ASTM A123/A153 hot-dipped galvanized steel, or ASTM A1059/A1046 zinc alloy coated steel.
ASTM A123/A153 hot-dipped galvanized steel, or ASTM A1059/A1046 zinc alloy coated steel.
Pipe
DIN rail
J-hook
ASTM A53 Schedule 40 galvanized steel
ASTM A47 Hot-dip galv. malleable iron
DIN 50035 compliant, 35x15 mm, prepunched, electrolytic zinc plated steel.
UL514B listed, Type 304 stainless steel body, watertight, with nylon or rubber bushing.
TIA/EIA 569, galvanized steel, UL listed for material specifications.00985 Hot-dip galv. malleable iron conduit body, see
02560.40.ASTM A563 Grade A, C, D, or DH, galvanized steel, heavy hex, comply with
2560.40.ASTM A307 Grade A or B, galvanized steel, hex, comply with 0
KB03.See Termination Enclosure Detail on
Picture Rock Pass_dt_01.dgn :: Default 4/30/2026 12:00:58 PM hwye26z
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
OREGON
REENIGN
E
E K
Y
D NAV .C
ENI
A
L
B
02 ,21
Y L
U
J OREGON
L A
N
OI
SS
EF
ORP DERE
T
SI
G
E R
Blaine Van Dyke
Blaine Van Dyke Ron Blacketer
Doug Spencer
EQUIPMENT DETAILS
INTELLIGENT TRANSPORTATION SYSTEMS
KB03
LAKE
M.P.: 62.34
HWY: 019
ITS-2304
COUNTY
ITS DWG. NO.
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
LAKE COUNTY
FREMONT HIGHWAY
PICTURE ROCK PASS RWIS
FIXED CAMERA POLE MOUNTING
No Scale
Band straps, see Note 1.
(Agency furnished).Pole mount bracket
See Note 2.(Agency furnished).sun shield
Camera, lens, and enclosure with attached
All hardware must be Type 316 SST.
Pole
See Note 3.Terminated with RJ45 connectors and molded boot covers.
Route cable to cabinet and terminate on fixed camera power supply.
DOT Blue Sheets for product information. OIndustrial Ethernet cable, see
Notes:
General Notes:
verify length prior to ordering cable. Coil excess of each cable in cabinet.
4. All cables shall be continuous to the cabinet. No splices will be accepted. Contractor shall field
3. Provide drip loops for all exposed cabling.
apart.
2. Secure loose cables with UV rated ties specified per the ODOT QPL. Spaced no more than 3 ft.
for general hardware specifications. KB021. See Material Table on
. Furnish Fiber Optic Interconnect Communications Bracket without DIN mounted components. 4 conductor.
3. Bond equipment to nearest ground lug with UL83 No. 8 AWG THWN stranded copper ground
2. Coordinate aiming with Engineer.
1. Secure to pole with Type 316 ⅝in. stainless steel band straps.
No Scale
Blue Sheets for product information.
Radio Mount with cable kit, see ODOT
Pole.
1½" diameter pipe, 2'-0" in length.
bottom U-bolt and above radio bracket.
Remove excess tube 6" max. extension below
Drip loop
Pipe reducer
1" diameter pipe, 1'-0" in length.
(Agency furnished).Anemometer cable
(Agency furnished).Anemometer
ANEMOMETER MOUNTING
6" min.
12" max.
Type 316 SST, typ.
All hardware must be see Note 1.Band straps, No Scale
IR ILLUMINATOR POLE MOUNTING
(Agency furnished)
Mounting bracket
(Agency furnished)
Pole mount bracket
See Note 2.
(Agency furnished)
IR illuminator termination enclosure.
cable on terminal blocks in
Terminate . IR illuminator pigtail
Pole
NOMENCLATURE
MATERIAL/PARTS LIST
ITEM MATERIAL DESCRIPTION
Communications bracket
Load controller
PV charge controller
DC Circuit Breakers
Terminal blocks
DIN rail
Ground lug for terminal block layout in RWIS cabinet. KB04SeeSee Blue Sheets for product information, quantity as needed.
DIN 50035 compliant, 35x15 mm, prepunched, electrolytic zinc plated steel.
Aluminum or copper, UL listed.
AC/DC Converter Battery Charger
ATC 2070 controller
Analog to Ethernet converter
PoE fixed camera power supply
Shown for space accommodation (4" w x 6" h). . DIN mountedAgency furnished and installed, Shown for space accommodation (19" w x 7" h). . rack mountedAgency furnished and installed, mount on DIN rail.Agency furnished, Network router mount on DIN rail.Agency furnished, mount on backplane as shown on this sheet. Agency furnished, mount on backplane as shown on this sheet. Agency furnished, for product information and wiring diagram on this sheet. 00989See for product information and wiring diagram on this sheet. 00989See
Fiber Optic Interconnect Communications Bracket, see ODOT Green Sheets for product information.
No Scale
RWIS 346 CABINET LAYOUT No Scale
CONTROLLER CABINET LAYOUT
P o w e r
See Note 4.
No Scale
TERMINATION ENCLOSURE DETAIL
Secure panel to cabinet with SST hardware, typ.
single eye, closed mesh, bus-drop duty.
Wire mesh cable support grip. single weave, KB01. See Conduit Hub Connection Detail on
J-hook for securing wire mesh cable support grip.
Conductors for equipment, typ.
Cord grips, provide a single cord grip per cable.
washer on top and bottom of enclosure mounting flanges.
⅜" diameter Type 304 SST lag screw, washer, and lock Install framing channel to mount enclosure to structure.
⅛" Type 6063-T6 aluminum panel, sized to fit enclosure.
to ground rod with No. 6 AWG stranded copper ground wire.
4 barrel aluminum or copper ground lug, UL468 listed. Bond as specified in 00985.Termination enclosure
12" min.
16" max.
12" min.
16" max.
SIDE
min.
8"
FRONT
Terminal blocks, quantity 2 per IR illuminator mounted at site.
6" min. DIN rail
75 8
Wind Line Driver mount on rack and secure via permanent means. Agency furnished, 4
Picture Rock Pass_dt_01.dgn :: Default 4/30/2026 12:00:58 PM hwye26z
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
OREGON
REENIGN
E
E K
Y
D NAV .C
ENI
A
L
B
02 ,21
Y L
U
J OREGON
L A
N
OI
SS
EF
ORP DERE
T
SI
G
E R
Blaine Van Dyke
Blaine Van Dyke Ron Blacketer
Doug Spencer
EQUIPMENT DETAILS
INTELLIGENT TRANSPORTATION SYSTEMS
KB04
LAKE
M.P.: 62.34
HWY: 019
ITS-2305
COUNTY
ITS DWG. NO.
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
LAKE COUNTY
FREMONT HIGHWAY
PICTURE ROCK PASS RWIS
Bat+ Load-
Load controller
#2/0 #2/0
#6 nominal
30V DC
Output
Cabinet Combiner
Module Photovoltaic
Module Photovoltaic
15A breakers
Inputs
TempPV+ Bat+PV- Bat-
60A
Breaker
Array 1
Solar PV
#6 #3 #3
PV charge controller 1
#6
#6
#6 module cables, typ.
10 AWG Photovoltaic
Module Photovoltaic
Load+
#4
Bat-
#6
20A
Breaker
Load
Controller Cabinet
Battery Enclosure
IR Illuminator
Single Panel+
Eth
Supply
PoE Power Fixed Camera
12V DC Terminal Blocks
Communications Bracket
RWIS Cabinet
Sensor
Relative Humidity
Air Temperature
Anemometer
Converter
Ethernet
Analog to
Enclosure
Termination
#12
#12
#4 this sheet.on
See Sensor Wiring Diagrams
12V DC
PHOLTOVOLTAIC ARRAY WIRING DIAGRAM
Temperature sensors
60A
Breaker
Charger
Battery
GRN
WDSIG
WHT
BLK
BLU
RED
SHLD
WDREF
WSREF
WSSIG
EARTH
EXC
Wind Line Driver
+12VDC
(Temperature)
Channel 3
IN2+
IN2-
RTN
+PWR
IN3+
IN3-
RTN
RH
T
GND
(Relative Humidity)
Channel 2 Humidity Sensor
Temperature & Relative
DC-
DC+
+12VDC
DC GND
Analog to Ethernet Converter
IN0+
IN0-
RTN
IN1+
IN1-
RTN
(Wind Speed)
Channel 0
(Wind Direction)
Channel 1
Wind Speed
WS+
WS-
WD+
WD-
Wind Direction
EARTH
1 +12VDC
SENSOR WIRING DIAGRAM
RTN
see Note 1.
Terminal blocks, ERT
TB5
GND
PWR
ERT
TB4
GND
PWR
TB3
TB2
GND
PWR
Anemometer
Relative Humidity
Temperature
12V DC Bus
+12VDC
+12VDC
ERT
GND
PWR
GND
PWR
DC GND
DC GND
DC GND
DC GND
Terminal block, typ.
Terminal block end clamp, typ.
Terminal block jumper, typ.
TERMINAL BLOCK LAYOUT
Blue
TB2 TB3 GND GND GND GND
Red
PWR
Red
PWR
Red
PWR
Red
PWR
(Spare)
Yellow
Green/
Purple Green Black Black Black Black
ERT
Yellow
Green/
Yellow
Green/
ERT ERT TB1
Red
PWRGND
Black
GND
Black
TB4 TB5
White Grey
Notes:
1. Terminal block labels correspond with Terminal Block Layout Detail on this sheet.
General Notes:
See Blue Sheets for conductor product information.
4. Conductors shown on Photovoltaic Array Wiring Diagram must be type XHHW, sized as labelled.
and bonded to ground rod.
3. Enclosure grounding conductors must be green, stranded, copper, THWN, minimum No. 6 AWG, cabinets shall be UL83 16 AWG THWN copper stranded conductors, unless otherwise stated.
2. See Site Plans for conductor sizes not shown on wiring diagrams. Conductors within the must match the wiring diagram shown.
1. All conductors must be clearly marked with heat shrink type tags. Label on the conductors
WIRING DIAGRAMS
Module Photovoltaic
100A
Breaker
Output
Charge 1
Bat+Bat-
Battery Charger
AC/DC Converter
#3#3
5A
5A
#4
#4
X "X" trip setting Circuit breaker at
LEGEND
DESCRIPTIONSYMBOL
6V DC battery connection Battery terminal connection Terminal block
XHHW conductor "X" AWG type
#X
Eth cable Industrial Ethernet
Picture Rock Pass_dt_01.dgn :: Default 4/30/2026 12:00:58 PM hwye26z
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
TM700
CONDUIT TRENCHING
GENERAL
T M
.d g n
01-2025
10-JAN-2025N/A
J A
N
2" Bedding
2" Cover
30"
24"
18"
18"
Thickness, Whichever Is Greater
6" Min. Or Match Existing Surface
Conduit
CLSM
Conduit
Non-Metallic
Metallic
Roadway & Shoulders Other AreasType Of Conduit
Or Upper Limit Of Excavation
Subgrade, Surrounding Ground, Top Of Trench, Bottom Of
When Using Rigid Metallic Conduit)
Sand Blanket (May Be Omitted
Top Of Existing Surface
CONDUIT OPEN TRENCH EXCAVATION & BACKFILL
under sidewalk, landscaped areas, etc.)
UNSURFACED AREAS (new roadway prior to paving, shoulders, 6" (Nominal)
Top Of Finished Surface
For The Entire Length Of The Conduit Run
Center Underground Marking Tape Over Conduit
MINIMUM COVER FROM FINISHED SURFACE
(Use Permit Depth If Greater Than These)
Minimum Cover From Top of Finished Surface
Minimum Cover Table)
Minimum Cover (See
Minimum Cover Table)
Minimum Cover (See
Optic Hand Hole As Per TM702, The Minimum Cover Depth Is 24 Inches.
2. For Non-Metallic Conduit Under Roadway & Shoulders Installed Horizontally Into Fiber
More Information.
To Accommodate The Minimum Radius ("R") Of The Conduit Elbow. See TM701 For
1. Additional Cover Depth May Be Necessary Near Foundations And Junction Boxes
Notes:
Than 6" According To 00405.46(C)(2).
Material. Compact Material In Layers Not Greater
Selected Granular Or Selected General (Native)
Along The Boundaries Of The Area To Be Removed
With An Approved Pavement Cutting Saw 2" Minimum Depth
When Excavating, Cut Sharp And Well Defined Pavement Edges
Finish To A Smooth Riding Surface.
00745, 00755, And 00756, As Applicable.
Compact Material According To 00744, Match Existing Surface Material: PCC Or ACP
6. Furnish Backfill Materials According To 00960.10
5. Do Not Backfill Trenches Until Inspected By The Engineer
4. Hold Trench Width To A Practical Minimum
Place All Conduit Before Paving Or Landscaping.
3. Excavate According To 00960.40. In Areas To Be Paved Or Landscaped, Changed To Avoid Obstructions.
2. Conduit Runs Shown On Plans Are For Bidding Purposes Only. Locations May Be
1. Install Conduit By Open Trench Method, Horizontal Directional Drilling, Or As Shown
General Notes:
(See Note 2)
CONDUIT OPEN TRENCH EXCAVATION & BACKFILL
EXISTING PAVED AREAS
NEW DRAWING (CONTENT FROM RETIRED TM471)
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
TM701
T M
.d g n
NEW DRAWING (CONTENT FROM RETIRED TM470 & TM471)01-2025
10-JAN-2025N/A
J A
N
Future Use (No Wires/Cables In Conduit). Leave 6 Feet Of Slack Pull Line.
6. Install Polyethylene Pull Line In All Conduits Noted On The Plans For
Poles, Cabinets Unless Otherwise Shown.
5. Leave A Minimum Of 2 Feet Slack In Each Wire And Cable In Junction Boxes,
4. Tape The Ends Of Unused Conductors With Insulated Vinyl Plastic Tape.
Common Wire Nut Unless Otherwise Shown.
And Install A Wire Nut. Do Not Join Multiple Locate Wires Under A All Conduits As A Locate Wire. Leave Slack As Shown Or Directed
3. Install No. 16 AWG TFFN Orange Base With Blue Tracertone Wire In
Unless Otherwise Shown.
Handheld Labeler (Brady M210 Label Maker With Vinyl B-595 Tape)
2. Label Wires And Cables With Permanent Tags As Shown Or Directed. Use
To Specification Section 00990 Bid Items.
1. See TM470 For Additional Wire/Cable Installation Requirements That Apply
Wire & Cable Installation General Notes:
LUBRICANT
Wires And Cables In Conduit Use Electrical Lubricants When Inserting
Pulls Are Made With Poles Or Controller Cabinets In Place
* Use A Pulley Device To Achieve A Straight Line If
Terminating End Points For Pulling Only Binding Material) Allowed Only At The Wire (Tapes, Straps, Ties, Or Other Temporarily Bundling Cables Or
The Conduit Opening* Pull In A Straight Line With
Cables By Hand Only Pull All Wires And
WIRE & CABLE INSTALLATION IN CONDUITS
CONDUIT INSTALLATION IN JUNCTION BOXES
and Controller Cabinet Foundations)
(Applicable for Pole, Pedestal, Service Cabinet
CONDUIT INSTALLATIONS IN FOUNDATIONS
Junction Box
2" Min. To 3" Max.
Fiberglass Conduit Elbow
(Direction Of Conduit Run)
Plumb)
(Install
PVC Riser
Of The Conduit Run
Near The End Wall From The Direction
Enter Through The Bottom Of The Box
Conduit (Size As Shown On Plans).
2" Min. To 3" Max.
Fiberglass Riser (Install Plumb)
Foundation
Concrete
Fiberglass Elbow
Elbow
Fiberglass
Shown On Plans)
Conduit (Size As
Shown On Plans)
Conduit (Size As
Coupling
Coupling
Top Of Foundation
JB3 34"
JB2 18"
JB1 12"
From End Wall
2" To 3" Typ.
Diameters
Of Conduit
Max. Sum
Box Type
Junction
If Max. Sum Of Conduit Diameters In Junction Box Is Not Exceeded.
2. Larger Conduit Than Specified May Be Used At The Option And Cost Of The Contractor
Between Any Pole, Junction Box, Or Cabinet.
1. Install Non-Metallic Conduit Unless Otherwise Shown. Conduit Runs Shall Be Continuous
Conduit Installation General Notes:
Beyond Foundation
Conduit 10" To 12"
Extend Fiberglass
R
R
Diameter
Conduit
Coupling
Manufacturer's Recommendation.
Weld To Connect Conduit As Per
Full Circumference. Use Solvent
Conduit Ends Fit Together For Their
Make Cuts Square And True So
Non-Metallic Conduit
CONDUIT ENDS AND BUSHINGS
CONDUIT ELBOWS
CONDUIT COUPLINGS
3" Min.
Plug
Conduit
Foam
Wiring (Or Pull Line) Is Installed
Install Foam Conduit Plug After For Future Use Only)
(Or Pull Line in Conduit
Cables/Wires
R (min.)
Fiberglass Riser (In Foundations)
PVC Riser (In Junction Boxes) Or
1/2" To 1" Above Conduit Bushing
Diameter
Than Riser
" Larger1/2
Before Installing Wire
End Bell Conduit Bushings
Install Push-On PVC
3" 18"
2 1/2" 15"
2" 12"
1 1/2" 10"
Size Conduit For The Entire Length, Outlet To Outlet.
1. Slip Joints, Running Threads Or Reducing Couplings Not Allowed. Use The Same
Notes:
2. Temporarily Plug Or Cap Conduit Ends At All Times To Keep Debris Out
1. Ream Conduit Ends To Remove Rough Edges And Burrs
Notes:
Manipulation, Or Cutting In The Field)
(No Crimping, Flattening, Field
Standard Factory Fiberglass Bend
INSTALLATION
CONDUIT & WIRE/CABLE
GENERAL
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
TM702
T M
.d g n
NEW DRAWING (CONTENT FROM RETIRED TM472)01-2025
11-JUL-2025N/A
J U
L
INSTALLATION
JUNCTION BOX/HAND HOLE
GENERAL
SIGNALS
S
S
A
2"
S
SECTION A-ASECTION B-B
TANDEM JB/3A JUNCTION BOX DETAILS
B
B
DIMENSION TABLE
D
LW
SI
GNALS
COVER DETAILS
JUNCTION BOX
To Secure Cover Or Hex Head Bolts Steel / Brass "L" Bolts Use Two Stainless
S
(See Std. Dwg. TM570 And TM571)
Type 1, Type 1U, Or Type 2 Delineator
PCC Apron
JUNCTION BOX INSTALLATION IN PCC SIDEWALK
Hand Hole
Junction Box Or
HAND HOLE IN UNSURFACED AREA
DELINEATION OF JUNCTION BOX &
S
IG
N A
LS
S
S
IN UNSURFACED AREA
JUNCTION BOX INSTALLATION
Chamfer (Typ.)
45 Degree
PCC Apron
2"
"12"
31/2"
"1/23
PCC Apron
12" Junction Box Cover
(See Note 4)
Crushed Rock
3/4" - 0"
12" Min.
3 1/2"
EdgeOfSidewalkOrEdgeOfRamp
2'-0"Min.OfSoftscapeFrom
SoftscapeAsShown
Sidewalk
PCC Junction Box Apron
Paved Shoulders, Or Other Areas Exposed To Traffic.)
Behind Guardrail, Etc. Do Not Install In Travel Lanes, Located In Incidental Travel Areas; Gravel Shoulders, (This Detail Only Applicable for Junction Boxes
Sidewalk
Back Of Sidewalk
Mi n.
Mi n.
TravelLane
Face Of Curb
Dirt Or Soil
Junction Box Cover
(See Note 4)
3/4" - 0" Crushed Rock
Compacted Backfill OrSidewalk
2"
(See Note 4)
Crushed Rock
3/4" - 0"
12" Min.
Flat Areas Of Sidewalks. Do Not Install In Slopes Of Ramps Or Driveways) (This Detail Only Applicable for Junction Boxes Located In
Sidewalk Surface PCC Apron Or
Cables In The Other JB/3 Detector And Interconnect Wiring In One JB/3 And Install Signal And Illumination The Controller Cabinet In The Tandem JB/3 Nearest
4"
Sufficient Coverage To Produce A Firm Unyielding Surface. Do Not Install Conductors Until Surface Has Been Constructed.
4. Use Materials According To 00640.10 and 00640.16. Use Compaction Equipment Suitable For Area And Compact Each Six Inch Layer With
3. More Junction Boxes And Hand Holes Than Specified May Be Installed To Facilitate The Work At The Option And Cost Of The Contractor
And No More Than 1000 Feet Apart For Hand Holes.
2. Install Junction Boxes And Hand Holes At The Approximate Locations Shown, Or If Not Shown, No More Than 300 Feet Apart For Junction Boxes
Or Shoulder, Leave The Top Of The Hand Hole 1/2" Below The Pavement Surface.
1. Install Top of Junction Box And Hand Hole Flush With The Sidewalk, Surrounding Grade, Or Top Of Curb. For Hand Holes Installed In The Roadway
GENERAL NOTES:
Type* L W D
12"
12"
12"
17"
12"
10"
30"
22"
17"
JB3
JB2
JB1
HH-3
HH-2
HH-1
30"
30"
24"
48"
48"
30"
36"
24"
24"
Type As Shown On Plans
*Junction Box Or Handhole
Or Max. 3/8" Lift Hole With Recessed Lifting Eye Junction Box Cover
Lift Eye
Behind Box
3'- 0" Max.
Reading, "JCT. BOX"
3" B Font Text
White Target With Black
Systems (Letter Height 1" Min.)
Or "ELECTRICAL" For ITS/Misc. Electrical "ILLUMINATION" For Illumination, "SIGNALS" For Traffic Signal, Cover To Be Marked
TOP VIEW
FIBER OPTIC CABLE HAND HOLE INSTALLATION
For Nut, Typ.
Recess In Cover Secure Cover.
(Hex Head) To Steel Bolts 304 Stainless Use Two Type
"FIBER OPTICS" (Letter Height 1" Min.)
Polymer Concrete Cover. Cover To Be Marked
Coil As Shown
Hand Hole Polymer Concrete
3 1/2"
PCC Apron* 12"
12"
2"
12" Min.
SIDE VIEW
Elbows Not Required In Hand Holes.
For Conduit Ends and Bushings), Typ.
For Cover Depth Exception & TM701 PVC or HDPE Conduit (See TM700 (See Note 4)
3/4" - 0" Crushed Rock
Coil As Shown
Grout Non-Shrink With Non-Epoxy Penetrations Seal Conduit
3"
3"
3" Min.
07-2025 REVISED FIBER OPTIC CABLE HAND HOLE INSTALLATION DETAIL
S
PCC Apron*
Chamfer (Typ.)
45 Degree
"1/23
Located In Driveable Surface Or As Shown *Install PCC Apron When Hand Holes Are
12" Max.
| KA01 |
| KB01 |
| KB02 |
| KB03 |
| KB04 |
| TM700 |
| TM701 |
| TM702 |
| 2026-04-30T12:52:20-0700 | |
| VANDYKE Blaine |
| 2026-04-30T12:52:32-0700 | |
| VANDYKE Blaine |
| 2026-04-30T12:52:44-0700 | |
| VANDYKE Blaine |
| 2026-04-30T12:52:59-0700 | |
| VANDYKE Blaine |
| 2026-04-30T12:53:16-0700 | |
| VANDYKE Blaine |
File details come from the government source that posted it. Updated .