This is a Bid Pricing Form (Attachment C) for an Invitation to Bid (ITB) issued by the Oregon Department of Transportation (ODOT) for the OR223 Fish Passage Improvement Project at Milepost 26.58. The project involves repairing a culvert invert through concrete paving and installing invert baffles. The scope of work encompasses ten line items, including mobilization, temporary work zone traffic control, portable changeable message signs (2 units), temporary water management facilities, pollution control planning, erosion control, culvert invert paving, corner baffles (4 units), turbidity monitoring, and two types of culvert markers. All work is to be performed in strict accordance with the ITB, Plans, and Specifications provided by ODOT.
The bid pricing form is structured on a lump sum or unit price basis, with all line items currently showing zero dollar values as placeholders for bidder submission. Bidders are required to provide pricing for mobilization, temporary traffic control, equipment, environmental controls, monitoring, and culvert-related materials and installation. The form requires bidders to identify their company name and location (city and state) and submit a complete bid total reflecting all costs associated with the project scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00016416_Att C_Bid Pricing Form_REV_Add1.xlsx | XLSX spreadsheet | |
| 00016416_Att A_Plans~1.pdf | ||
| 00016416_ITB~1.docx | DOCX document | |
| 00016416_Att B_Specs and Special Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT C - BID PRICING FORM S-73000-00016416 |
| Bidder name: |
| City, State: |
The Bidder proposes to furnish all material, equipment and labor, and perform all work for ODOT, in strict accordance with the ITB and the Plans, Specifications and other provisions incorporated in the ITB, on the basis of the lump sum or unit prices, or both, as follows:
| Item | Description | Est Qty | Unit | Unit Price | Total |
| 1 | Mobilization | 1 | LS | $0.00 | |
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $0.00 | |
| 3 | Portable Changeable Message Signs | 2 | EACH | $0.00 | |
| 4 | Temporary Water Management Facility | 1 | LS | $0.00 | |
| 5 | Pollution Control Plan | 1 | LS | $0.00 | |
| 6 | Erosion Control | 1 | LS | $0.00 | |
| 7 | Invert paving of existing culvert | 1 | LS | $0.00 | |
| 8 | 8" Corner Baffle | 4 | EACH | $0.00 | |
| 8 | Turbidity Monitoring | 1 | LS | $0.00 | |
| 9 | Culvert marker Type 1 | 1 | EACH | $0.00 | |
| 10 | Culvert marker Type 2 | 1 | EACH | $0.00 | |
| BID TOTAL | $0.00 |