00016416_Att C_Bid Pricing Form.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
ITB - OR223 Fish Passage Improvement Project MP 26. 58
Solicitation number
S-73000-00016416
Issued by
Benton County, Oregon

About this file

This is a Bid Pricing Form (Attachment C) for an Invitation to Bid (ITB) issued by the Oregon Department of Transportation (ODOT) for the OR223 Fish Passage Improvement Project at Milepost 26.58. The project involves repairing a culvert invert through concrete paving and installing invert baffles. The scope of work encompasses ten line items, including mobilization, temporary work zone traffic control, portable changeable message signs (2 units), temporary water management facilities, pollution control planning, erosion control, culvert invert paving, corner baffles (4 units), turbidity monitoring, and two types of culvert markers. All work is to be performed in strict accordance with the ITB, Plans, and Specifications provided by ODOT.

The bid pricing form is structured on a lump sum or unit price basis, with all line items currently showing zero dollar values as placeholders for bidder submission. Bidders are required to provide pricing for mobilization, temporary traffic control, equipment, environmental controls, monitoring, and culvert-related materials and installation. The form requires bidders to identify their company name and location (city and state) and submit a complete bid total reflecting all costs associated with the project scope.

View the file

Other files

File Type Posted
00016416_Att C_Bid Pricing Form_REV_Add1.xlsx XLSX spreadsheet
00016416_Att A_Plans~1.pdf PDF
00016416_ITB~1.docx DOCX document
00016416_Att B_Specs and Special Provisions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT C - BID PRICING FORM S-73000-00016416
Bidder name:
City, State:

The Bidder proposes to furnish all material, equipment and labor, and perform all work for ODOT, in strict accordance with the ITB and the Plans, Specifications and other provisions incorporated in the ITB, on the basis of the lump sum or unit prices, or both, as follows:

ItemDescriptionEst QtyUnitUnit PriceTotal
1Mobilization1LS$0.00
2Temporary Work Zone Traffic Control, Complete1LS$0.00
3Portable Changeable Message Signs2EACH$0.00
4Temporary Water Management Facility1LS$0.00
5Pollution Control Plan1LS$0.00
6Erosion Control1LS$0.00
7Invert paving of existing culvert1LS$0.00
88" Corner Baffle4EACH$0.00
8Turbidity Monitoring1LS$0.00
9Culvert marker Type 11EACH$0.00
10Culvert marker Type 21EACH$0.00
BID TOTAL$0.00

File details come from the government source that posted it. Updated .