00016416_Att A_Plans~1.pdf
PDF 2 MB Posted
- Solicitation number
- S-73000-00016416
- Issued by
- Benton County, Oregon
About this file
This document is a construction plan set prepared by the Oregon Department of Transportation (ODOT) for the Fish Passage Improvement Project on Kings Valley Highway (OR 223) at Mile Post 26.58 in Benton County. The project involves repair of a 63-linear-foot existing 72-inch corrugated metal pipe (CMP) culvert through concrete invert paving and installation of fish baffles designed to improve fish passage conditions. The scope of work includes removing gravels and debris from the pipe, cleaning with high-pressure water, removing zinc coating in shear connector areas, installing shear connectors conforming to ASTM A108 standards, placing reinforcing steel per ASTM A706 with 60 ksi minimum yield strength, pouring a 4-inch concrete invert, installing four fish baffles spaced at 13-foot intervals, and tapering the final 5 feet of invert paving. Additionally, the contractor must install one Type 1 culvert marker at the inlet and one Type 2 marker on a steel post near the inlet edge of pavement. Estimated material quantities include 8.5 cubic yards of concrete for paved lining, 0.75 cubic yards for fish baffles, 460 pounds of shear connectors, and 162 each of fish baffles.
The project includes a temporary water management plan to isolate the work site using sandbag barriers and bypass pipes to protect water quality during the July 1 through October 31 in-water work period. The contractor is responsible for implementation, maintenance, and removal of all temporary water management features and must coordinate fish salvage with the Region Environmental Coordinator prior to installation. Estimated discharges for Plunkett Creek range from 0.09 to 3.67 cubic feet per second depending on the month, with discharge tables provided to guide sizing of dewatering facilities. All materials and work must comply with Oregon Standard Specifications for Construction 2024, and the contractor shall restore the site upon completion. The plans were prepared by registered professional engineer Wade Holaday and checked by Matt Segrin, dated April 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00016416_Att C_Bid Pricing Form_REV_Add1.xlsx | XLSX spreadsheet | |
| 00016416_Att B_Specs and Special Provisions.pdf | ||
| 00016416_Att C_Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00016416_ITB~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED PROJECT
CULVERT REPAIR
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond
Val ley Jordan
STATE OF OREGON
DEPARTMENT OF TRANSPORTATION
LET'S ALL
WORK TOGETHER
TO MAKE THIS
JOB SAFE
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
O T
N E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
H_M26002_ts_01.dgn :: Default 2/23/2026 7:24:37 AM hwyr33e 1"=100' Scale: Rotation: 0°
INDEX OF SHEETS
SHEET NO. DESCRIPTION
Title SheetA01
ATTENTION:
(503) 232-1987).
The Oregon Utility Notification Center Is
The Center (Note: The Telephone Number For
You May Obtain Copies Of The Rules By Calling
Through OAR 952-001-0090.
Those Rules Are Set Forth In OAR 952-001-0001
By The Oregon Utility Notification Center.
Oregon Law Requires You To Follow Rules Adopted
MP 26.58
OR 223: FISH PASSAGE IMPROVEMENT PROJECT
KINGS VALLEY HIGHWAY
BENTON COUNTY
APRIL 2026
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ENTON COUNTYB
KINGS VALLEY HIGHWAY
MP 26.58
OR 223: FISH PASSAGE IMPROVEMENT PROJECT
A01STATE
Project Site
MP 26.58
HB01 Construction Plan
HB02
59V-061
Details
HB03 Culvert Marker Details
HD01 Concept Temporary Water Management
Plunket Creek
OREGON
RE
GI
ST
ERE
D PROFESSIONALEN
GINEER
RENEWS: 6-30-2027
51 99
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
CONSTRUCTION PLAN
O R
FG=110.66
I.E. =110.33
S=2.45%
FG=112.20
I.E. =111.87b e g in r e p a ir
S ta b a f f le
S ta b a f f le
S ta b a f f le
S ta e n d r e p a ir s
S ta
7) Taper last 5 feet of invert paving from full depth to 1" at end of culvert.
6) Place paved lining and fish baffles as shown.
5) Thoroughly clean pipe with high pressure water.
4) Place reinforcing as shown.
3) Place shear connectors as shown.
2) Remove zinc coating from pipe surface in areas of shear connectors.
1) Remove gravels and debris throughout entire length of pipe
CONSTRUCTION SEQUENCE:
Pour invert paving as shown. (See Detail Sht. HB02) of invert paving.
End reinforcing 5 feet from the culvert outlet end to allow for tapering of the nearest face of concrete.
Construct staggered #3 lap splices = 12". Place reinforcing 2" clear
Provide reinforcing steel according to ASTM A706.
tensile strength of 60 ksi.
Grades 1015, 1017, or 1020 fully kilned with a minimum yield and
Provide shear connectors conforming to ASTM A108, cold drawn bar, Oregon Standard Specifications for Construction 2024.
Provide all materials and perform all work according to the
GENERAL NOTES:
59V-061
0+50 1+00 1+50 b a f f le
S ta
CULVERT ID MARKER TABLE
Check where appropriate
MPNote
Culvert Location Type 1 Marker Type 2 Marker
InletInlet Outlet
Inlet &
Outlet
Inlet & Number
DFI
Number
Structure
26.58 02999
A p p ro x . R
W
T o K in g s V a lle y
T o U
S
A p p ro x . R
W
(For details, see sht. HB02)
Const. paved invert - 63 LF
MP 26.58
T. 10S., R, 06 W., S 33, W.M.
M.P. 26.58
(For details, see sht. HB03)
Install culvert marker Type 2 - 1 EA
Install culvert marker Type 1 - 1 EA
MP 26.58
O R
Extg. culvert
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:CADD Tech:
Designer:
SHEET NO.
COUNTY Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
BENTON COUNTY
KINGS VALLEY HIGHWAY
MP 26.58
OR 223: FISH PASSAGE IMPROVEMENT PROJECT
HWY:
M.P.:
DATE
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
MATT SEGRIN
Name
WADE HOLADAY
WADE HOLADAYBENTON
HB01
26.58
04/2026
H_M26002_clpl_01.dgn :: Plan Sheet HB01 2/23/2026 7:27:36 AM hwyr33e
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
DETAILS
Fish baffle
A
A
Top of corrugations pipe
Pipe length=63'
72" CMP pipe
NTS
BAFFLE DETAIL
5" invert paving
4"
2" radius
NTS
SECTION A-A
4 Fish baffles spaced at 13'-0" baffle baffle baffle
5-#4 L-Bars @ 12" 4" invert paving
2" radius
A lo n g p ip e l e n g th
6"
1'-0"
NTS
SPACING DETAIL
SHEAR CONNECTOR
Pipe length=63'-0"
72" CMP pipe
Top of corrugations
See 'Shear Connector Spacing Detail' this sheet " dia. x 2" shear connectors per side.8
33 lines of
Typ.
#3 @ 12" e.w.. Center reinforcing vertically in paving baffle
Top of baffle
Invert paving
4"
NTS
TYPICAL SECTION
Estimated Material Quantities
Material
Reinforcing
Shear Connectors
Paved Lining
CY
CY
each lb
Unit Quantity
Fish Baffle
8.5
0.75
59V-061
MATT SEGRIN
Name
WADE HOLADAY
WADE HOLADAYBENTON
HB02
26.58
04/2026
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:CADD Tech:
Designer:
SHEET NO.
COUNTY Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
BENTON COUNTY
KINGS VALLEY HIGHWAY
MP 26.58
OR 223: FISH PASSAGE IMPROVEMENT PROJECT
HWY:
M.P.:
DATE
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R
H_M26002_clpl_01.dgn :: Details Sheet HB02 2/23/2026 7:34:52 AM hwyr33e
59V-061
CULVERT MARKER DETAILS
HB03
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
RENEWS: 6-30-2027
for rivet hole locations
See dwg. no. TM570
ODOT
D panelStyle:working_panelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:1panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18panelSizes:panelStandard:1levels:GSCOLORFILL|GSBWFILL|GSOUTLINE
TYPE 2 MARKER
TYPE 2 MARKER INSTALLATION
3.5"
1"
.25"
.5"
.75" Non-reflective green tape band
.5"
1", (typ.)
.25" (typ.)
o r
B ri d g e s tr u c tu re I
D
D ra in a g e f a c il it y
I D
D
F I) black, (typ. all) non-reflectorized
Type C font paddle non-reflective
White
Edge of pavem ent
Fog Line typ. rivet holes
Paddle with
(See Note 5) rivets and washers aluminum blind
(4) 3/16" dia.
steel post with paddle to type 1U
Fasten Type 2 marker
SINGLE PIPE
SINGLE DRAINAGE FACILITY
facing edge of pavement post parallel to travel lane, numbers
Type 2 marker paddle mounted on steel
.2
NOTES:
Engineering Technical Services Branch.
Maintenance Hydraulic Engineer in the Hydraulic Unit of the contact the Senior Culvert Hydraulic Engineer or the Senior Culvert
5. For more information on Single and Multiple Drainage Facilities, side of highway.
4. On non-divided highways place markers only at the culvert inlet inconspicuous to traffic.
3. Install Type 2 culvert markers parallel to travel lane and with the inlet.
2. Place Type 1 marker on inlet edge of the pavement directly in line details.
1. See Standard Drawing TM571 for 'Type 1U Steel Post Dimensions'
MATT SEGRIN
Name
WADE HOLADAY
WADE HOLADAYBENTON
26.85
MO/YR
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:CADD Tech:
Designer:
SHEET NO.
COUNTY Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
BENTON COUNTY
KINGS VALLEY HIGHWAY
MP 26.58
OR 223: FISH PASSAGE IMPROVEMENT PROJECT
UNIT FILE CODE
HWY:
M.P.:
HWY:
M.P.:
DFI/TSSU NO.DATE
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R
H_M26002_clpl_01.dgn :: Culvert Marker HB03 2/23/2026 8:00:25 AM hwyr33e
Plunket Creek
ST
ERE
JU
LD
E R
HOLA
W A
19202
D A
Y
Y
YDER
TEMPORARY WATER MANAGMENT
CONCEPT
O R
59V-061
3) Average daily discharge expected to be exceeded 16 days each month.
2) Average daily discharge expected to be exceeded 8 days each month.
1) Average daily discharge expected to be exceeded 2 days each month.
In-water work period extends from 1 July through 31 October.
the subject watershed may differ from year to year.
estimated discharges are based on historic flow records. Discharges in
Listed discharges are surface water from the upstream watershed. The
FEET PER SECOND (GALLONS PER MINUTE)
AVERAGE DAILY DISCHARGE IN CUBIC
NOTE 1 2 3
AUGUST
SEPTEMBER
OCTOBER
Plunkett Creek
TEMPORARY WATER MANAGEMENT
ESTIMATED DISCHARGES FOR
0.542(245) 0.25(115) 0.12(55)
0.75(335) 0.29(130) 0.09(40)
JULY 0.83(375) 0.52(235) 0.33(150)
0.30(135)0.66(295)3.67(1645)
Energy dissipation pool
Sandbag barrier line
Dewatering sump pump
LEGEND
Plastic
Sandbag barrier
SANDBAG ISOLATION DETAIL
A p p ro x . R
W
K in g s V a lle y
U S
A p p ro x . R
W
T. 10S., R, 06 W., S 33, W.M.
M.P. 26.58 GENERAL NOTES
and restore site as per plans and specifications.
Remove all Temporary Water Management features with minimum sags and water tight joints.
Gravity bypass pipe shall be install at a even grade prior to installation to schedule the fish salvage.
required. Notify Region Environmental Coordinator facilities, fish salvage by authorized personnel is
Prior to installation of Temporary Water Management sediment-laden water does not leave the site.
storm events and to insure that sediment and periods, this facility shall be upgraded for unexpected anticipated site conditions. During the construction on this plan is the minimum requirements for
The Temporary Water Management Facility shown is completed and approved.
responsibility of the contractor until all construction replacement and upgrading of this facility is the
Management Plan and the construction, maintenance, The implementation of this Temporary Water fish moving through the bypass pipe.
Provide outlet pool to provide a safe landing area for laden water does not leave the site.
dewatering of the work area to ensure sediment
Provide adequate sediment control measures during temporary settling basin or other approved location.
to an area up stream of the sandbag barrier to a contained by the secondary barrier shall be returned
Water seeping through the primary barrier and bypass pipe and/or pump.
below can be used to estimate the size of the using pipe, pump or combination. The discharge table on site conditions. Route water around work area
Size the temporary water management facility based set based on topography and easements available.
downstream from work area. Location to be
Install sandbag barrier and energy dissipator pad
Downstream: Install sandbag barrier.
If needed, install secondary sandbag barrier.
primary sandbag barrier across the stream channel.
Isolating the work site upstream: Install single
FULL ISOLATION NOTES
its height is:
linear feet of barrier that is twice as wide as
The estimated number of bags needed for 100 inches wide by 14 inches long. This is a 30 pound bag of dry sand.
having a placed dimension of about 4 to 5 inches high by 9 to 10 used to construct a sandbag barrier. This is based on each bag of 2 feet). This is the minimum width-to-height ratio that should be wide as its height (e.g., a one foot high wall would have a base width
A common recommendation is to make the sandbag barrier twice as
Height (ft)# bags
2 1700
H e ig h t f t.
Width (ft.)
SANDBAG FOOTPRINT DETAIL
NO SCALE
Pipe length=63'
72" CMP pipe
NTS
BYPASS PIPE DETAIL
(10" minimum dia.)
Bypass pipe to culvert wall as needed
Strap bypass pipe
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:CADD Tech:
Designer:
SHEET NO.
COUNTY Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
BENTON COUNTY
KINGS VALLEY HIGHWAY
MP 26.58
OR 223: FISH PASSAGE IMPROVEMENT PROJECT
HWY:
M.P.:
DATE
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
MATT SEGRIN
Name
WADE HOLADAY
WADE HOLADAYBENTON
HD01
26.58
04/2026
H_M26002_clpl_01.dgn :: TWM HD01 2/23/2026 7:36:34 AM hwyr33e
| 2026-02-23T08:08:05-0800 | |
| HOLADAY Wade |
| 2026-02-23T08:08:45-0800 | |
| HOLADAY Wade |
| 2026-02-23T08:09:31-0800 | |
| HOLADAY Wade |
| 2026-02-23T08:10:06-0800 | |
| HOLADAY Wade |
File details come from the government source that posted it. Updated .