00016325 Preliminary Results.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
The Dalles MS New Overhead Doors
Solicitation number
S-73000-00016325
Issued by
Wasco County, Oregon

About this file

This is a bid tabulation document from the Oregon Department of Transportation for the removal and installation of overhead doors and operators at The Dalles Maintenance Station. The project involves a base bid for removal and replacement of four existing overhead doors and operators at doors 3, 4, 5, and 6, with four additive alternates allowing for expansion within available funding. Add Alternate 1 covers removal and replacement of up to three 12-foot-wide overhead doors (doors 13, 12, and 11); Add Alternate 2 addresses up to two 14-foot-wide overhead doors (doors 7 and 8); Add Alternate 3 provides removal and replacement of up to three additional 12-foot-wide overhead doors (doors 14, 1, and 2); and Add Alternate 4 covers preparation and painting of existing overhead doors. The bid closing date was April 2, 2025, at 1:30 PM, with electronic bid opening immediately following closure. No pre-bid conference was held, and site access prior to bid closing was not provided. The project requires substantial completion by July 1, 2026, and final completion by August 3, 2026.

Two bids were submitted: Excel NW LLC submitted a total bid of $193,000.00 (base bid of $78,000.00 plus alternates totaling $115,000.00), and Westwood Company submitted a total bid of $304,680.00 (base bid of $116,060.00 plus alternates totaling $188,620.00). All contractors must be licensed with the Oregon Construction Contractors Board, comply with Oregon prevailing wage rate requirements for BOLI Region 9 (Wasco County), and be factory-authorized dealers located within seventy-five miles of the facility with minimum five years' experience in sectional door fabrication and installation. Bid security equal to 10% of the total bid amount is required, along with performance and payment bonds each equal to 100% of the contract price upon award. The project is funded through state funding with an estimated cost ranging from $100,000 to $250,000 for bonding purposes. Liquidated damages are assessed at $600.00 per calendar day for failure to meet substantial completion deadlines. The contractor is responsible for all materials, equipment, labor, permit acquisition, and disposal of demolition materials, and must provide one-year installation warranties on all workmanship and applicable equipment warranties.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:4/2/26
ITB No.S-73000-00016325BIDDER
NAME:Excel NW LLCWestwood Company
Bid Closing:04/02/2025 @ 1:30 PM
Description:The Dalles MS New Overhead Doors
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Base Bid - Remove 4 existing overhead doors and operators and replace with new overhead doors and operators at overhead doors 3, 4, 5, and 6 in accordance with the attached plans and specifications.4EA$ 19,500.00$ 78,000.00$ 29,015.00$ 116,060.00$ - 0$ - 0$ - 0
2Add Alternate #1 - Remove existing 12' wide overhead door and operator and replace with new overdead door and operator. Price is per each, from 1 to 3 total. Priority order of door replacement is 13, 12, 11.3EA$ 12,600.00$ 37,800.00$ 20,830.00$ 62,490.00$ - 0$ - 0$ - 0
3Add Alternate #2 - Remove existing 14' wide overhead door and operator and replace with new overhead door and opwerator in accordance with the attached plans and specifications. Price is PER EACH, from 1 to 2 total. Proiority order of door replacement is door 7 and then 8.2EA$ 13,100.00$ 26,200.00$ 23,240.00$ 46,480.00$ - 0$ - 0$ - 0
4Add alternate #3 - Remove existing 12' wide overhead door and operator and replace with new overhead door and operator. Price is per each, from 1 to 3 total. Priority order of door replacement is 14, 1 and 2.3EA$ 12,600.00$ 37,800.00$ 20,830.00$ 62,490.00$ - 0$ - 0$ - 0
5Add Alternate #4 - Prepare and paint exisiting overhead door. Price is PER EACH, from 1 to 7 total. Priority order of door painting is door 1, 2, 3, 7, 8, 14, 9, 10, 11, 12 and then 13. The intent of this alternate is to ensure any doors that dont get replaced may be able to get painted white to match the new doors. (if it fits in the budget)11EA$ 1,200.00$ 13,200.00$ 1,560.00$ 17,160.00$ - 0$ - 0$ - 0
TOTAL$ 193,000.00$ 304,680.00$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .