00015940 Preliminary Results.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
OR86: Snake River (Oxbow) Bridge Paving PRoject
Solicitation number
S-73000-00015940
Issued by
Baker County, Barlow City, Oregon

About this file

This is a preliminary bid tabulation document for the Oregon Department of Transportation's competitive sealed bid procurement (ITB No. S-73000-00015940) for the Snake River (Oxbow) Bridge Paving Project located along OR 86 at milepost 70.8 in Baker County, Oregon. The project scope encompasses mobilization, development and implementation of a pollution control plan, and placement of approximately 280 tons of Level 3 PG 64-28 asphalt concrete pavement (ACP) with nominal thickness varying from 2 to 3 inches over the concrete bridge deck. The work includes cold plane removal of existing asphalt concrete surfacing across a project length of 0.09 miles. Four bidders submitted sealed bids at the March 2, 2026 bid closing at 10:00 AM: Rogers Asphalt Paving, Granite Construction Company, JAL Construction Inc, and KNL Industries Inc. The tentative project start date is May 15, 2026, with substantial completion required by May 23, 2026, and final completion by June 1, 2026. Bidders were required to conduct their own site inspections prior to bid submission, with no pre-bid conference scheduled. Public opening of bids occurred immediately following the bid closing.

The four responsive bids ranged from a low total of $73,920.00 (Rogers Asphalt Paving) to a high total of $109,000.00 (KNL Industries Inc), with individual line item pricing varying significantly across mobilization costs ($1,200 to $35,000), pollution control plan costs ($200 to $2,500), and unit prices for asphalt material ($180 to $350 per ton). Bid security equal to 10 percent of the total bid was required and could be furnished as a bid bond, certified check, cashier's check, or irrevocable letter of credit. The awarded contractor must provide performance and payment bonds each equal to 100 percent of the contract amount along with proof of commercial general liability insurance of $1,000,000 per occurrence and $2,000,000 annual aggregate. The work is anticipated to be funded with State funds, with award dependent upon receipt of sufficient project funding. Retainage shall not exceed 5 percent of progress payments. No small business set-asides or disadvantaged enterprise designations are specified for this procurement. All bidders must be licensed with the Oregon Construction Contractors Board and comply with prevailing wage rate requirements established by the Oregon Bureau of Labor and Industries effective January 5, 2026, for BOLI Region 13.

View the file

Other files

File Type Posted
00015940 Sample Contract~1.docx DOCX document
Required Supplemental Request Form - Public Improvement.dat —
00015940 Exhibit 5 Specifications.pdf PDF
00015940 Intent To Award.xlsx XLSX spreadsheet
00015940 PI Invitation to Bid.docx DOCX document
00015940 Exhibit 6 Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:3/2/26
ITB No.S-73000-00015940BIDDER
NAME:Rogers Asphalt pavingGranite Construction CompanyJAL Contruction IncKNL Industries Inc
Bid Closing:03/02/2026 @ 10:00 AM
Description:OR 86 Snake River Oxbow Bridge Paving Project
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1MOBILIZATION1LS$ 1,200.00$ 1,200.00$ 8,000.00$ 8,000.00$ 35,000.00$ 35,000.00$ 10,000.00$ 10,000.00$ - 0$ - 0$ - 0$ - 0
2POLLUTION CONTROL PLAN1LS$ 200.00$ 200.00$ 1,000.00$ 1,000.00$ 2,500.00$ 2,500.00$ 1,000.00$ 1,000.00$ - 0$ - 0$ - 0$ - 0
3LEVEL 3, 1/2 INCH ACP MIXTURE280Ton$ 259.00$ 72,520.00$ 270.00$ 75,600.00$ 180.00$ 50,400.00$ 350.00$ 98,000.00$ - 0$ - 0$ - 0$ - 0
TOTAL$ 73,920.00$ 84,600.00$ 87,900.00$ 109,000.00$ - 0$ - 0$ - 0$ - 0