This is a preliminary bid results tabulation for an Invitation to Bid (ITB) issued by the Oregon Department of Transportation (ODOT) for the replacement of cooling units at ODOT Building A. The project involves the uninstallation and removal of two existing cooling units and the installation of two new 30-ton nominal package cooling units, along with all associated transportation, freight, tools, equipment, labor, supervision, permits, and materials necessary to complete the work as described in the contract documents. The bid closing date was December 17, 2025, at 3:00 pm. The solicitation is for a single lump-sum contract item covering the entire project scope.
Seven bidders submitted proposals for the cooling units replacement project, with bid prices ranging from $169,890.00 to $258,800.00. The lowest bid was submitted by Northwest Mechanical at $169,890.00, followed by Copper Mechanical LLC at $180,000.00, Apex Mechanical LLC at $188,426.00, CKG Industries, Inc. at $205,983.00, Lamvik Construction at $223,000.00, Hydro-Temp Mechanical, Inc. at $224,700.00, and Umpqua Sheet Metal, Inc. at $258,800.00. The bid tabulation explicitly notes that it is not an indicator of award and serves only as a compilation of submitted bids for consideration. The ITB number is S-73000-00014763, with the related project number S-73000-00014762.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 34649 drug_and_alcohol_testing_addendum_1.pdf | ||
| 34649_drug_and_alcohol_testing_rfp_final.pdf | ||
| 34649 cost_proposal_drug_testing.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 12/17/25 | ||||||||
| ITB No. | S-73000-00014763 | BIDDER | |||||||
| NAME: | Northwest Mechanical | Copper Mechanical LLC | Apex Mechanical LLC | CKG INDUSTRIES, INC | lamvik construction | Hydro-Temp Mechanical, Inc. | Umpqua Sheet Metal, Inc. | ||
| Bid Closing: | December 17, 2025 at 3:00 pm | CITY/STATE: | |||||||
| Description: | ODOT Building A Cooling Units Replacement | CCB#: | |||||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Total Project Bid: S-73000-00014762 ODOT Building A Cooling Units Replacement Project, including all transportation, freight, tools, equipment, labor, supervision, permits, and necessary materials to uninstall and remove from site the old two existing cooling units and install two fully operational new 30-ton nominal ton Package Cooling units and other work as described in the Contract documents. | 1 | LS | $ 169,890.00 | $ 169,890.00 | $ 180,000.00 | $ 180,000.00 | $ 188,426.00 | $ 188,426.00 | $ 205,983.00 | $ 205,983.00 | $ 223,000.00 | $ 223,000.00 | $ 224,700.00 | $ 224,700.00 | $ 258,800.00 | $ 258,800.00 |
| TOTAL | $ 169,890.00 | $ 180,000.00 | $ 188,426.00 | $ 205,983.00 | $ 223,000.00 | $ 224,700.00 | $ 258,800.00 |