This document is a set of construction plans from the Oregon Department of Transportation (ODOT) for a Culvert Repair Project along US 101 (Oregon Coast Highway) in Tillamook and Lincoln Counties, scheduled for March 2025. The project involves repairing culverts at multiple locations between milepost 73.46 and 131.65, with specific repair sites at MPs 73.46, 74.95, 75.19, 89.37, 89.81, 128.76, 129.18, and 131.65. The plans include detailed technical drawings for culvert rehabilitation, including replacing culvert pipes, installing roughness blocks, implementing fish passage improvements, and applying embankment protection and riprap pads.
The project documents outline comprehensive technical specifications for culvert repairs, including fish passage hydraulic data, temporary water management strategies, and specific construction sequencing. The plans emphasize safety and environmental considerations, with detailed instructions for installing coupling bands, managing water flow during construction, and protecting stream environments. Each location has unique requirements based on specific site conditions, culvert dimensions, and hydraulic characteristics. The project appears to be federally funded through the Federal Highway Administration's Oregon Division, with standard Oregon Department of Transportation specifications and standard drawing references for construction methods and materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00012712_Att B_Specifications.docx | DOCX document | |
| Broker of Record RFP.pdf | ||
| Att C_Bid Pricing Form~47.xlsx | XLSX spreadsheet | |
| 00012712_Bid tab.xlsx | XLSX spreadsheet | |
| 00012712_3.27_Q and A.docx | DOCX document | |
| 00012712_ITB.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED PROJECT
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond
Val ley Jordan
STATE OF OREGON
DEPARTMENT OF TRANSPORTATION
Overall Length Of Project - XX.XX Miles
LET'S ALL
WORK TOGETHER
TO MAKE THIS
JOB SAFE
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
O T
N E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
H_M24087_ts_01.dgn :: Default 1/22/2025 11:41:06 AM hwyr33e 1"=100' Scale: Rotation: 0°
58V-035
INDEX OF SHEETS
SHEET NO. DESCRIPTION
Title SheetA01
ATTENTION:
(503) 232-1987).
The Oregon Utility Notification Center Is
The Center (Note: The Telephone Number For
You May Obtain Copies Of The Rules By Calling
Through OAR 952-001-0090.
Those Rules Are Set Forth In OAR 952-001-0001
By The Oregon Utility Notification Center.
Oregon Law Requires You To Follow Rules Adopted
CULVERT REPAIRS
US 101: CULVERT REPAIR PROJECT
MARCH 2025
TILLAMOOK & LINCOLN COUNTIES
OREGON COAST HIGHWAY
HB01 Culvert Repair MP 73.46
HB02 Culvert Repair MP 74.95
HB03
HB04
Culvert Repair MP 75.19
Culvert Repair MP 89.37
Culvert Repair MP 89.81
Culvert Repair MP 131.65
Culvert Repair MP 128.76 & 129.18
HB05
HB07
HB08
- Trench Backfill, Bedding, Pipe Zone And Multiple InstallationsRD300
- Street CutRD302
- Culvert Embankment Protection and Riprap PadsRD317
- Coupling Bands For Corrugated Metal PipeRD325
- Coupling Bands For Corrugated Metal PipeRD326
- Coupling Bands For Corrugated Metal PipeRD327
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
TILLAMOOK & LINCOLN COUNTIES
PACIFIC COAST HIGHWAY
MP 73.46 TO MP 131.65
US 101: CULVERT REPAIR PROJECT
A01STATE
MP 73.46 TO MP 131.65
MP 129.18
US101: OREGON COAST HWY.
MP 128.76
US101: OREGON COAST HWY.
MP 89.81
US101: OREGON COAST HWY.
MP 89.37
US101: OREGON COAST HWY.
MP 75.19
US101: OREGON COAST HWY.
MP 74.95
US101: OREGON COAST HWY.
MP 73.46
US101: OREGON COAST HWY.
MP 131.65
US101: OREGON COAST HWY.
HB06 Detail Sheet
HD01 TWM MP 73.46
HD02 TWM MP 74.95
HD03 TWM MP 75.19
HD04 TWM MP 89.37
HD05 TWM MP 89.81
Culvert Marker DetailsHB09
HD06 Concept Temporary Water Management Details
2025.01.23 07:41:51 -08'00'
2025.01.23 07:42:31
2025.01.23 07:43:19
2025.01.23 07:44:20
2025.01.23 07:34:28
2025.01.23 07:35:42
2025.01.23 07:36:25
2025.01.23 07:37:17
2025.01.23 07:19:44
2025.01.23 07:20:43
2025.01.23 07:26:04
2025.01.23 07:28:39
2025.01.23 07:39:18
2025.01.23 08:24:29
2025.01.23 07:40:57
RD300
INSTALLATIONS
PIPE ZONE AND MULTIPLE
TRENCH BACKFILL, BEDDING,
R D
.d g n
14-JUL-2014N/A
J U
L
C
"A" note 4)
(See general
Tracer wire
MULTIPLE INSTALLATIONS
DIAMETER MIN. SPACE BETWEEN PIPES
(in)
"A"
(in)
"B"
(in)
"C"
(in)
"D"
TABLE A
Finish grade stabilization, as required
Trench foundation see Table A
"C" Pipe bedding, Top of subgrade as directed
Topsoil or existing material
Surfacing-match
Base material m a te r ia l
E x c a v a te d n a ti v e
C la s s A c r u s h e d r o c k
C la s s B o r m a x c le a n s a n d
C la s s C
A s d ir e c te d m a te r ia l m a x
C la s s D p it o r b a r r u n
C L
S M
C la s s E
T re n c h b a c k fi ll a re a P ip e z o n eS e e T a b le
A
D
Nom."B" "B"
Pipe diameter
24" min.
m in
D ia
Up to 48"
48" to 72"
24"
) dia. of pipe2
One half (
4. See Std. Dwg. RD336 for tracer wire details (When required).
3. Pipes over 72" diameter are structures, and are not applicable to this drawing.
diameter.
used and the pipe is ≥ 36" diameter, increase dimension "B" to nominal pipe
2. For pipe installation in embankment areas where the trench method will not be
1. Surfacing of paved areas shall comply with street cut Std. Dwg. RD302.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
see general note 3.
For pipes over 72" diameter, the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD302
STREET CUT
R D
.d g n
20-JUL-2020N/A
J U
L
(Actual)
Trench width whichever is greater. Compact as specified.
4. Place AC mix minimum thkn. of 6" or the thkn. of the removed pavement, details.
3. For joining new concrete to existing concrete, see contract plans for sepecific or to the thickness of removed pavement, whichever is greater.
2. Concrete pavement shall be replaced with concrete to a minimum thickness of 8"
1. All existing AC or PCC pavement shall be sawcut prior to repaving.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
(AC patch only) with tack material and sand
Seal surface over joint concrete as specified
CLSM or full depth asphalt
Compacted aggregate base, backfill as specified
Compacted trench
(Extg.)
Undisturbed base
Extg. pvmt.
see general notes
Pvmt. replacement, min.
6" min.
6"
Min. width=Roller width plus 2" m in
Tack coat cut edges (AC only) the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD317
AND RIPRAP PADS
PROTECTION
CULVERT EMBANKMENT
R D
.d g n
30-JUN-2022N/A
J U
N
12 3
2B B 2B when directed
Riprap protection
W general note 4
See Std. Drg. RD316, D
T general note 4
See Std. Drg. RD316, D
T on plans or directed
Cutoff wall when shown when directed
Riprap protection
W
B
T = Thickness of riprap blanket, see Table A.
D = Diameter of circular barrel or rise of arch pipe, box, or open-bottom arch.
B = Diameter of circular barrel or span of arch pipe, box, or open-bottom arch.
general note 4
See Std. Drg. RD316, D
T when directed
Riprap protection
BB
W
B listed dimension.
* L is the greater of 4B or the
TABLE A - Embankment Slope Protection
See special details or Standard Drawings as called for on plans.
end sections, or other measures).
treatment (sloped ends, culvert embankment protection, paved end slopes, safety
2. Open ends of pipes normally require a site specific design, and may require special
1. See Std. Drg's. RD300 & RD304 for installation details.
c) Riprap pad, end view
W slope protection.
the width of the embankment pad is the larger of 5B or
3 Top width (W) of the riprap loose riprap.
Class 200 and Class 700
2 Use riprap geotextile under rock in order to place riprap.
1 Do not excavate non-erodible
B
Riprap Class T Distance
36 Inches *
24 Inches *
18 Inches
12 Inches
TABLE B - Riprap Pad Dimensions
Class
Riprap
(ft)
L *
(ft)
T
5.6
4.3
3.3
2.3
4B or 3.3
4B or 2.0
4B or 1.6
4B or 1.3 protection
Embankment
b) Riprap pad with cutoff wall, elevation view
L (See Table B)
L (See Table B)
a) Riprap pad without cutoff wall, elevation view
Cutoff wall
Riprap geotextile culvert invert thickness under
Pad should be full
Riprap geotextile
Channel bottom
T (See Table B)
Embankment protection
Outlet invert
W= Width of top of riprap pad, ft
T = Thickness of riprap pad, ft
L = Length of bottom of riprap pad, ft
B = Diameter or span of conduit, ft
T (See Table B)
A
A
B
B
C
C
B2 11 B2
Riprap pad riprap and embankment
* Riprap geotextile required between on plans or directed
Cutoff wall when shown
Wingwall and headwall
EMBANKMENT PROTECTION
RIPRAP PADS
HEADWALL AND WINGWALLS
SLOPED OR PROJECTING END
SLOPED END WITH SLOPE PAVING
SECTION A-A
SECTION B-B
SECTION C-C
RIPRAP PAD NOTES:
GENERAL NOTES FOR ALL DETAILS:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD325
CORRUGATED METAL PIPE
COUPLING BANDS FOR
R D
.d g n
REVISED DETAILS AND NOTES01-2023
20-JAN-2023N/A
J A
N
⅝
½
⅜
⅝
⅝
½
Band 7"
W
(In) Pipe Dia.
(In) Pipe Dia.W (In)
Ann.Hel. Bolts "2
# Of W (in)
Ann.Hel.
24-84
18-84
12-15
6-10
2-3
36-120
36-84
Bolts "2
# Of
Dim. A
C o rr u g a ti o n s
60-84
24-54
12-21
84-120
60-84
36-54
Rods # Of
Rods # Of
"x
(in) W
(in) W
"x anchors, when required.
See Std. Dwgs. RD330 and RD332 for pipe slope8.
engineer.
or other insulating material as approved by the a full width neoprene gasket or coated with asphalt connected, the connecting band shall be used with To prevent galvanic action when unlike metals are7.
diameters over 42".
bands of two or more pieces are required for pipe pipe diameters up to and including 42". Coupling One or two piece coupling bands are optional for6.
Standard Specifications.
tested for water tightness in accordance with the Joints for sanitary sewers and siphons are to be5.
". 16 3diameter, the gasket thickness may be centering on the joint. For pipes 12" or less in thick of a width equal to the band width and
" 8 3 vulcanized) synthetic, closed-cell sponge rubber all coupling bands shall be (butt-cemented or installations when shown on the plans. Gaskets for irrigation pipes, storm sewers, and other Watertight joints with gaskets are required for4.
corrugation and pipe diameter shown may be used.
width coupling band indicated for the band type, used as an acceptable alternate, the minimum Under conditions where concrete pipe may be3.
that used for the pipe.
aluminum pipe shall be of the same thickness as nominal thickness. Coupling bands for corrugated 0.109" nominal thickness nor less than 0.052" than that used for the pipe but not more than pipes may be two numerical thicknesses lighter Coupling bands for corrugated iron and steel2.
shall be galvanized or aluminum coated.
All steel coupling bands and connection hardware1.
TYPE E
TYPE DTYPE BTYPE A
HELICAL COUPLINGANNULAR COUPLING
CONNECTION ANGLE DETAIL
TOP VIEW
END VIEW END VIEW
COUPLING BAND DIMPLE DETAIL
" Corrugations2 1"x3
22 3"x1" Corrugations
(In) Pipe Dia.
(In) Rod Dia.
Narrow Band Wide Band
Req'd. above 42" dia.
to 42" diameter.
Second angle conn. opt.
Band (See general note 4) where required Watertight joint gasket
"16 32"x2"x
" bolts2 and toe of angle of corrugation at heel fillet weld at crest Rivet, spotweld or bolts "2
Band
Pipe Band
Pipe with cut washers " carriage bolts8
32 -
W W joints req'd. for watertight (Sigma) clips
Band
(See general note 4) where required Watertight joint gasket with cut washers " carriage bolts8
32 -pipe corrugated Helically
Helical pipe
Band
Pipe
(See general note 6) where required Watertight joint gasket
Cast lug
Band
4 - Rods and lugs
Cast lug
Pipe as reqd. to fit the helix angle.
Dimension A: 7" min. between dimples
" bolts2 13 -
Pipe
Band min 12"
"16 32"x2"x to fit the helix angle 8 spaces as reqd.
"2
(For 6"-10" dia. pipes)
(For 12"-30" dia. pipes)
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD326
COUPLING BANDS FOR
R D
.d g n
REVISED DETAILS AND NOTES01-2023
20-JAN-2023N/A
J A
N
"2
TYPE F-2
"2
(See Std. Dwg. RD327) bolt bar
Tension strap and bolt (Typ.)
"x6" carriage 2
21"
(12"-42" diameter)
Spot welded 8" band angle end for helical pipe
Reformed pipe bolt (Typ.)
"x6" carriage 2
(48"-144" diameter) strap with bolt bar
Spot welded tension
SINGLE BAR & STRAP CONNECTOR
DOUBLE BAR & STRAP CONNECTOR
a a
(Typ.)
See INSERT "A"
"4
3"x1" corrugations width is 14
", with8 corrugations width is 13
"2
"x3
For annular pipe with 2 end helical pipe
Reformed rolled
(See general note 4) where required
Watertight joint gasket
(when required) to annular corrugations
Spiral pipe ends reformed sleeve gasket, when required
" neoprene strip or8
(Typ.)
Alternate O-ring gasket
"3
" or 21"2
"2
"3
2"
JOINT DETAIL (TYPE F1 & F2)
INSERT "B"
TYPE F
JOINT DETAIL (TYPE F)
INSERT "A"
"2
21"
SINGLE 12" BAND ANGLE CONNECTOR
DOUBLE BAND ANGLE CONNECTOR
bolt (Typ.)
"x6" carriage 2 connector
12" Band angle for clarity (Typ.)
Band lap not shown
TYPE F-1
bolt (Typ.)
"x6" carriage 2 connector
8" Band angle for clarity (Typ.)
Band lap not shown
(Typ.)
See INSERT "B"
(Typ.)
See INSERT "B"
(Typ.)
"x6" bolts2
2 -
"2 with bolt bar tension strap
Spot welded a
(See Detail "A" on Std. Dwg. RD327)
Tension strap and bolt bar
(12"-84" diameter) with bolt bar
Spot welded tension strap
(48"-84" diameter)
Spot welded 12" band angle
(48"-144" diameter)
Spot welded 20" band angle a anchors, when required.See Std. Dwgs. RD330 and RD332 for pipe slope 8.
other insulating material as approved by the engineer.
band shall be used with a full width neoprene gasket or coated with asphalt or
To prevent galvanic action when unlike metals are connected, the connecting 7.
pipe diameters over 42 inches.
including 42 inches. Coupling bands of two or more pieces are required for diameters up to and One or two piece coupling bands are optional for pipe 6.
accordance with the Standard Specifications.
for water tightness in Joints for sanitary sewers and siphons are to be tested 5.
inch. 16 pipes 12 inches or less in diameter, gasket thickness may be inch thick of a width equal to the band width and centering on the joint. For 8 shall be (butt-cemented or vulcanized) synthetic, closed-cell sponge rubber and other installations when shown on the plans. Gaskets for all coupling bands
Watertight joints with gaskets are required for irrigation pipes, storm sewers, 4.
inch bands).8 inch minimum diameter (14-8 inch bands) and 1-8 and 13-inch2 nch minimum diameter (10- i16 between bands. "O" ring gaskets shall be inch band) shall be placed in lap 4 inch band) or 9 inch (14- 8 band) or 8 inch (13-inch2 inch wide by 5 inch (10-2
1- inch by 8
C443 and a mastic sealant strip
Gaskets for the Type F coupling band shall be "O" rings conforming to ASTM 3.
to arch pipes of equal peripheral measurement.
Type F coupling bands shown for pipes 15 inch to 72 inch in diameter are typical2.
See Std. Dwg. RD325 for general notes, and details not shown.1.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
SINGLE 8" BAND ANGLE CONNECTOR
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD327
COUPLING BANDS FOR
R D
.d g n
REVISED DETAILS AND NOTES01-2023
20-JAN-2023N/A
J A
N are required for pipe diameters over 42 inches.
up to and including 42 inches. Coupling bands of two or more pieces
4. One or two piece coupling bands are optional for pipe diameters
. "16 in diameter, the gasket thickness may be the band width and centering on the joint. For pipes 12 inches or less thick of a width equal to "8 synthetic, closed-cell sponge rubber
Gaskets for all coupling bands shall be (butt-cemented or vulcanized) storm sewers, and other installations when shown on the plans.
3. Watertight joints with gaskets are required for irrigation pipes, approved by the engineer.
gasket or coated with asphalt or other insulating material as the connecting band shall be used with a full width neoprene
2. To prevent galvanic action when unlike metals are connected, not shown.
1. See Std. Dwgs. RD325 and RD326 for general notes, and details provide a tensile strength of 7500 lbs are permissible.
Design variations in fasteners (Straps, bars, & welds) which
NOTE:
provide a tensile strength of 7500 lbs are permissible.
Design variations in fasteners (Straps, bars, & welds) which
NOTE:
Coupling band sealant where required
Watertight joint gasket or
Forged steel bar
" dia.8
(Typ.)
" square hole16
(Typ.)
Spot welds Band sheet
"4
"x84
Tension strapBolt bar
(See general note 3)
"4
"8
" 2
BOLT BAR DETAIL
WATERTIGHT JOINT
TENSION STRAP
DETAIL A
TOP
FRONT
FLAT BAND OR DIMPLE BAND
TYPE K
(FOR PIPE EXTENSIONS ONLY)
or helical end with reformed end
New pipe extension with helical end
Extg. pipe
(See table A)
W connector
Band angle connector
Bar & Strap bolt (Typ.)
"x6" carriage 2
BAND ANGLE CONNECTOR DETAIL
DOUBLE BAR & STRAP CONNECTOR DETAIL
Band Type
Steel
Aluminum
Corrugations (In)
Pipe Dia.
(In)
Min. W Gasket Type
Sleeve
Sleeve
54-144
54-84
12-48
54-96
54-84
12-48
"2 1"x3
* 3"x1" 5"x1"
"2 1"x3
* 3"x1" 5"x1"
TABLE A
* Arch pipe only
Insulating material connecting band
Standard
(See general note 2)
Type varies with pipe of unlike material
Extending existing pipe culvert
CONNECTION DETAILS
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
bolt (Typ.)
"x6" carriage 2 the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2024 - May 31, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with