This document contains the preliminary results for a state and local contract opportunity for the LV 2024 OR138E: Glide Maintenance Paving Project in Douglas County, Oregon. The project involves complete Bridge End Panel and Cold Plane Pavement Removal of asphalt concrete surface, furnishing and placing Emulsified Asphalt Tack Coat, and furnishing and placing Level 3, 1/2" Asphalt Concrete Pavement (ACP) Mixture (PG 64-22) along the North Umpqua Highway (OR138E) between MP 16.35 and MP 17.75 (Glide). The preliminary bid results show that LTM, Incorporated dba Knife River Materials submitted a bid for this project with a total price of $345,945.00, which includes items such as Mobilization, Work Zone Traffic Control, Bridge End Panel Cold Plane Pavement Removal, and Cold Plane Pavement Removal.
The bid item details provide the estimated quantities and unit prices for the various work items. The project requires work to be completed by August 06, 2024, with a bid submission deadline of 2:00 PM on that date. No additional information is provided in the document regarding pricing terms, set asides, incumbents, funding requirements and sources, or any other salient details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rejuva pre bid meeting summary.pdf | ||
| 00011006 ITB.docx | DOCX document | |
| ATT A Special Provisions and Specifications~25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| S-73000-00011006 | August 06, 2024 2:00 PM | |||
| PRELIMINARY RESULTS* | LTM, Incorporated dba Knife River Materials | |||
| Bid Item # | Description | Est | ||
| QTY | UNIT | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1 | LS | $21,785.00 | $21,785.00 |
| 2 | WORK ZONE TRAFFIC CONTROL, COMPLETE | 1 | LS | $19,000.00 | $19,000.00 |
| 3 | BRIDGE END PANEL COLD PLANE PAVEMENT REMOVAL, 2 INCH DEEP | 70 | SQYD | $12.00 | $840.00 |
| 4 | COLD PLANE PAVEMENT REMOVAL, 2 INCH DEEP | 20300 | SQYD | $2.40 | $48,720.00 |
| 5 | LEVEL 3, 1/2 INCH ACP MIXTURE | 2400 | TON | $106.50 | $255,600.00 |
| TOTAL | $ 345,945.00 | ||||
| *Preliminary Results are not an indicator of Award |