This is Addendum No. 1 for the Cedartown Performing Arts Center Renovation (Phase 1) issued by CEVIAN Design Lab, LLC on behalf of the City of Cedartown, Georgia. The addendum clarifies contract documents and addresses bidder questions regarding the renovation project. Key scope items include replacement of all roofing systems with a mechanically attached TPO roofing membrane (with approved substitution for MuleHide 60mil TPO Fleece Back Membrane), removal and disposal of existing auditorium seating, replacement of existing carpet in the auditorium, preparation of concrete slabs following Owner-completed abatement, replacement of the finish floor, modification of the dimming panel location, and inclusion of backflow preventer work at the sprinkler vault within the Contractor's scope. The project requires completion between June 1 and November 30, 2026, with abatement scheduled for mid-May 2026. A pre-bid meeting was held on March 25, 2026, with the sign-in sheet to be posted on the City of Cedartown website. The Owner does not disclose the construction budget or engineer's estimate under the Open Records Act. Bidders are responsible for obtaining all necessary local permits with waived permit fees, as well as permits and fees required by the Georgia State Fire Marshal's Office. Notarized pay applications are required, and the project operates under Davis-Bacon wage rate requirements with rates to be updated two weeks prior to construction commencement. No liquidated damages clause applies to this project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CEVIAN Design Lab, LLC
Cedartown Performing Arts Center Renovation (Phase 1) Addendum No. 1 Project No. 24017 00 91 13 - 1
SECTION 00 91 13 - ADDENDUM No. 1
April 1, 2026
Applying to all Bidders.
This addendum is issued for the purpose of clarifying the intent of the Contract Documents for making necessary corrections, deletions, and/or additions to the Documents on all items of discrepancy raised up to the issuance of this addendum.
Each Bidder is hereby instructed and authorized to incorporate into their proposal the instructions contained in this addendum.
TO ALL BIDDERS
QUESTIONS
1. Questions and Responses:
a. Could you please confirm whether the Owner has established a construction budget or engineer’s estimate for the project that can be shared with bidders?
The estimated budget for the project is not disclosed by the Owner. The Owner takes the position that those budgets are not disclosed under the Open Records Act.
b. Would you please provide access to the full bid package, drawings, and specifications?
All of the bid documents can be downloaded at the City of Cedartown’s website:
http://www.cedartowngeorgia.gov/.
c. Plans call for a mechanically attached TPO roofing system. Based on the photos provided and history of the structure, we are concerned with the condition of the existing concrete deck and mechanically attaching another roofing system. We recommend a fully adhered TPO system to preserve integrity of roof decking. Can TPO roofing system be modified from mechanically fastened to a fully adhered TPO roofing system?
For bidding purposes, please price the roofing as mechanically attached per the drawings and specifications. If deemed prudent, we'll be happy to explore alternative options for the roofing installation after the Bid is awarded.
d. Is contractor to dispose of removed auditorium seating?
Yes, the Contractor is responsible for the removal and disposal of the existing auditorium seating.
e. Is contractor to leave threaded bolts in place in slab associated with removed auditorium seating?
No, all of the associated hardware for the existing auditorium seating is to be removed by the Contractor. The new seating layout does not align with the existing layout. If removal of the existing hardware proves to be too damaging to the existing slab, then we will explore alternative options in field.
f. Regarding the project referenced above, we have warranty eligible contractors interested in providing a competitive bid using MuleHide’s TPO roof system. MuleHide can also provide the same system warranty as specified. The formal request, along with supporting documentation, is attached.
Project No. 24017 00 91 13 - 2
Product substitution information was provided to the Architect.
The product substitution request for Mule-Hide Products' 60mil TPO Fleece Back Membrane and associated roofing components is approved. All of the requirements listed in Section 07 54 23 of the Project Manual apply, including installer qualifications, manufacturer inspections, warranties, and compliance with the Build America, Buy America Act (BABA).
g. Is abatement in the Contractor’s scope of Work?
No, abatement will be completed by the Owner prior to the start of construction. After abatement, it is the responsibility of the Contractor to prepare the concrete slab for installation of the new finish floor. Please reference Keynote 16 on Sheet A1.02.
h. Is the roof being replaced?
Yes, all of the roofs are to be replaced, per Sheet A1.05 and Section 07 54 23 of the
Project Manual.
i. Does the City have an anticipated timeline?
Per Section 00 21 13 of the Project Manual, the Owner requires Work of this Contract to be completed between June 1st and November 30th, 2026. Consideration will be given to time of completions when reviewing submitted Bids.
j. Is the finish floor in the Auditorium being replaced?
Yes, per Sheets A1.01 and ID1.01, the existing carpet in the Auditorium is to be replaced.
The areas that contain fixed seating are to remain concrete.
k. Are changes expected to the Davis-Bacon wage rates?
The Owner is required to request updated wage rates two weeks prior to the start of construction. Federal regulations do not allow the Owner to request the wage rates sooner.
l. Where is the dimming panel located?
The dimming panel is located in the area identified as “ELECTRICAL” on Sheet A1.03.
Photographs of the existing dimming infrastructure are enclosed with this Addendum.
m. Will certified pay applications be required for this project?
Notarized pay applications are required. Please reference Section 01 20 00 of the Project Manual for information on Applications for Payment.
n. When is abatement schedule to be completed?
Abatement is scheduled for mid-May. Abatement will be completed by the Owner prior to the start of construction.
o. Will the backflow preventer at the sprinkler vault be in the Contractor’s scope of work?
Yes.
p. Are there liquidated damages?
No.
q. Will the Contractor be required to pull a permit?
Yes, per Section 01 10 00 of the Project Manual, Contractor and Subcontractors are required to furnish all necessary permits. Local permit fees will be waived. The Work is under the jurisdiction of the Georgia State Fire Marshal’s Office (SFMO). Contractor and Subcontractors are required to obtain all necessary permits and pay all required fees to the SFMO.
Project No. 24017 00 91 13 - 3
r. Who do I contact to schedule a site walk with a sub?
You will contact Oscar Guzman, the City’s Director of Economic Development. His number is (470) 630 - 6302, and his email is oguzman@downtowncedartown.com.
s. I am trying to obtain the pre-qualified bidders list for this project. The addendum/attendance sheet from the pre-bid held on March 25th would work great. Can you assist?
Please keep an eye on the City's website: https://cedartowngeorgia.gov/our-government/bids/. The sign-in sheet from the pre-bid meeting will be posted there.
This addendum will be posted to the City of Cedartown, Georgia website: http://www.cedartowngeorgia.gov/ on April 1, 2026.
ENCLOSURES
Photographs of the existing dimming infrastructure.
Structural Drawing S1.0, dated 03/04/2026, providing clarity for the retaining walls on Sheet A1.07 and the steel plate lintels for the openings on Sheet A1.06, as well as structural design criteria and concrete specifications.
END OF DOCUMENT
Cedartown Performing Arts Center Renovation (Phase 1) Project No. 24017
PHOTOGRAPHS OF EXISTING DIMMING INFRASTRUCTURE:
PHOTOGRAPHS OF EXISTING DIMMING INFRASTRUCTURE (CONT.):
File details come from the government source that posted it. Updated .