KV - Solar Array Farm, modification 002
The Department of the Navy Naval Facilities Engineering Command seeks to repair the solar array system at Building 5740 at Naval Air Station Kingsville in Texas to restore it to operating potential. Bidders must provide all labor, materials, and equipment to complete the repairs in accordance with the attached Statement of Work. Proposals will be evaluated based on technical qualifications, past performance, and price. Final proposals are due by December 1, 2023.
This opportunity is set aside for total small business concerns. The NAICS code is 238210 and PSC code is R408. The incumbent contractor is ABC Solar. The possible award value is between $500,000 and $1,000,000 to be completed within six months of award. Work will be performed at Building 5740, Naval Air Station Kingsville, Texas.
N6945024R0008 Department of the Navy Naval Facilities Engineering Command
Solicitation 1/1
10/27/23, 2:59 PM Repair Electrical System on Alcatraz Islands, Golden Gate National Recreation A
JUSTIFICATION AND APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION
Over $150,000 (FAR 6.303-2)
PR Number 004048871
1. Identification of the Agency and the Contracting Activity:
Agency: Department of Interior/National Park Service
Contracting Unit: National Park Services, Interior Regions 8, 9, 10, and 12, Golden Gate Major
Acquisition Buying Office
2. Nature and/or Description of the Action Being Approved: Award to only one responsible
source (Alcatraz Island Services, LLC) for Repairs to the microgrid electrical system on Alcatraz
Island, San Francisco County, California.
3. A Description of the Supplies or Services Required to Meet the Agency¿s Needs, Including
the Estimated Value:
a) Total estimated Value: $XXXXXX
b) The work consists of system evaluation/troubleshooting/tuning and repairs to the stand alone
microgrid on Alcatraz Island. Components requiring repair include EMOS (Energy
Management Operating System) and BMS (Battery Management System) tuning, 2 system
generators, generator priming systems, 8 system inverters, photovoltaic panels, system
wiring/conduit and numerous safety improvements.
4. An Identification of the Statutory Authority Permitting Other Than Full and Open
Competition:
FAR 6.302-1 Only one responsible source and no other supplies or services will satisfy agency
requirements.
5. A Demonstration That the Proposed Contractor¿s Unique Qualifications or the Nature of
the Acquisition Requires Use of the Authority Cited:
Alcatraz has one of the largest stand alone microgrid systems in the United
States https://www.energy.gov/eere/articles/welcome-alcatraz-one-largest-microgrids-unitedstates.
This microgrid system has been in operation since 2012 and has no power connection to
the mainland. The system is complex and work on it is highly technical. Each element -- the
generators and their controller modules/priming systems, the inverters associated with the battery
and PV components, and the EMOS (Energy Management Operating System) that monitors and
switches between PV, battery and generator power. Alcatraz Island Services (AIS) has
maintained the system since 2012 under a Preventative Maintenance and Custodial contract and
worked with Princeton Power Systems as the subcontractor responsible for the inverters and
proprietary EMOS controller system. AIS was again awarded the Preventative Maintenance and
Custodial Contract in November of 2018 and expanded their knowledge base and relationship
with Princeton Power Systems (PPS). In late 2018, the battery system failed and was replaced by
AIS, who also held an IDIQ contract for repairs to the various island systems. At that time it was
noted that the remaining system components were also demonstrating significant age related
distress.
In late summer of 2019 PPS filed for bankruptcy and liquidated a number of their proprietary
system components to AIS. Additionally, they entered an agreement with Shawn Terrell,
previously employed by Princeton, to have exclusive rights to Princeton proprietary information
including manuals, technical drawings, wiring diagrams, test results and software/firmware. This
License Agreement made this company, Off Grid Electric (OGE), the exclusive provider of repair
services for Princeton Power Systems Equipment. AIS, by virtue of their purchased proprietary
PPS system parts, their exclusive contractual relationship with OGE for repair work on the
system and their extensive experience with coordinating system maintenance for over 8 years, is
the only responsible vendor to carry this work forward.
OGE informed the National Park Services that they were not currently offering services directly
to government institutions. Being a small company, they did not have the bandwidth to deal with
the bureaucracy of government contracts. OGE recommended we work with AIS as they had the
parts to replace the microgrid system and OGE only provides the support to AIS.
6. A Description of Efforts Made to Ensure That Offers Are Solicited From as Many Potential
Sources as is Practicable, Including Whether a Notice Was or Will Be Publicized as
Required by FAR Subpart 5.2 and, If Not, Which Exception Under FAR 5.202 Applies:
On June 9, 2020, the Contracting Officer posted a Source Sought on beta.SAM. The purpose of
the notice was to obtain information regarding the availability and capability of all qualified
sources to perform a potential requirement. Responses to the information would assist the
Government in determining the appropriate acquisition method. On June 15, 2020, the Sources
Sought closed with no responses received.
In accordance with FAR part 5.203, Publicizing and Response Time, ¿Whenever agencies are
required to publicize notice of proposed contract actions under 5.201, they must proceed as
follows:
(a) An agency must transmit a notice of proposed contract action to the GPE (see 5.201). All
publicizing and response times are calculated based on the date of publication. The
publication date is the date the notice appears on the GPE. The notice must be published at
least 15 days before issuance of a solicitation, or a proposed contract action the
Government intends to solicit and negotiate with only one source under the authority
of 6.302¿
No Exceptions under FAR 5.202 apply to this requirement, therefore, IAW FAR Subpart 5.2 a
notice of intent to award a sole source contract will be posted for 15 calendar days. Any responses
received will be considered before an award is made.
7. A Determination By the Contracting Officer That the Anticipated Cost to the Government
Will Be Fair and Reasonable: The Independent Government Estimate was created based on the
labor categories from a previous IDIQ 140P8618D0004 for Alcatraz Island Repair Services that
included costs for electricians, heavy equipment mechanic, general maintenance worker, and
pipefitter. Once pricing is obtained from the prospective contractor the government will review
to determine fair and reasonable over the level of effort required for the completion of work under
the contract.
8. A Description of the Market Research Conducted (see FAR Part 10) and the Results or a
Statement of the Reason Market Research Was Not Conducted:
A Sources Sought was posted on beta.SAM on June 9, 2020 with a closing date of June 15, 2020.
The purpose of the notice was to obtain information regarding the availability and capability of
all qualified sources to perform a potential requirement. Responses to the information would
assist the Government in determining the appropriate acquisition method. On June 15, 2020 no
responses were received from the Sources Sought.
Off Grid Electric (OGE), is the only subcontractor able to work on the EMOS (Energy
Management Operating System, the computerized microgrid system controller) and elements of
the system inverters. OGE is comprised of a former employee from Princeton Power Systems, the
now bankrupt firm that developed the controller hardware/software. Alcatraz Island Services also
holds a contract for Preventative Maintenance and Custodial services and OGE are currently
subcontracted to them for the preventative maintenance of the electrical system. As a result of
this exclusive contractual agreement between AIS and OGE, OGE is prohibited from
subcontracting out to another prime contractor for work on the island¿s microgrid system.
Therefore the only method of procuring the services of OGE is through AIS as the prime
contractor.
9. Any Other Facts Supporting the Use of Other Than Full and Open Competition (see FAR
6.302-2 (9) (i) ¿ (iii) for some examples
In October of 2019, the system experienced a failure which required that it be taken off of EMOS
control and power provided exclusively by the 2 system generators. On January 26, 2020, the
system generators failed and an emergency generator was mobilized. As a result, Alcatraz Island
is currently running on a single source of power via this temporary rental generator. In systems
without a direct connection to the mainland power grid, it is never recommended to operate
without a second backup power generation system in place. The island's life safety based
systems, in the form of fire alarms/suppression must be maintained at all times. Additionally, the
lighthouse is tied into the island's electrical system, is a USCG aid to maritime navigation and
must be maintained to ensure maritime safety on San Francisco Bay.
10. A Listing of the Sources, If Any, That Expressed in Writing, an Interest in the Acquisition:
No sources expressed interest for this acquisition when the Source Sought was posted on June 9,
2020.
11. A Statement of the Actions, If Any, the Agency May Take to Remove or Overcome Any
Barriers to Competition Before Any Subsequent Acquisition for the Supplies or Services
Required: In order to make this repair work competitive, the next contract for the microgrid
system that system software is non proprietary and that and system components can be readily
purchased from a variety of sources. Awarded contract 140P8620C0017 to unknown vendor for unknown amount on 2020-09-23.
140P8620C0017 Department of the Interior National Park Service Pacific West Region
Limited / Sole Source Justification 1/1
9/24/20, 9:44 AM