Architect And Engineering- Construction: Epg Facilities - Other, Including Transmission

Code C1MZ
Child
Spend Category Level 1
Facilities & Construction
Spend Category Level 2
Construction Related Services
Popular Federal Contract Opportunities
Not listed
Popular Federal Contract Awards
Not listed

The Product and Service Code (PSC) C1MZ encompasses Architect and Engineering services specifically related to Construction and Electrical Power Generation (EPG) Facilities, with a focus on design and support for electrical infrastructure projects. This category covers comprehensive architectural and engineering services for electrical systems, power distribution, and related facility improvements. The work typically involves detailed design, planning, and construction support for critical infrastructure, particularly in government and medical facility settings.

The federal contract awards under this PSC demonstrate a pattern of firm-fixed-price delivery orders for specific electrical and architectural engineering projects. The Air Force and Department of Veterans Affairs have been primary contracting agencies, with award values ranging from approximately $176,000 to $290,525. Recent awards have been made to small businesses like Summer Consultants, Inc. and Zapata Group, Inc., focusing on projects such as switchgear replacement at Vandenberg Space Force Base and architectural engineering services for Joint Base Charleston. These contracts generally have completion timeframes between several months to a year and are not typically set aside for specific small business categories.

The federal contract opportunities in this PSC category are predominantly focused on electrical distribution improvement projects for medical facilities, specifically at the Richmond Veterans Administration Medical Center. These opportunities are consistently set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and involve complex electrical infrastructure design work. The projects require detailed engineering services to improve emergency power distribution in critical patient care areas, ensuring compliance with specific National Fire Protection Association (NFPA) codes. The anticipated construction magnitudes range between $2-5 million, with design periods typically around 280 calendar days, and involve comprehensive architectural and engineering services including conceptual design, schematic design, and construction documentation.

Generated 1/19/25, 1:29 AM