U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033
Active Master IDIQ Awarded
- Federal agency
-
Navy Installations Command
- Awardees
- 4
- Task orders
- 15
- Obligated
- $6,856,613
Vehicle facts
- Opportunity
-
- Indefinite Delivery/Indefinite Quantity (IDIQ), Design-Bid-Build (DBB), Multiple Award Construction Contract (MACC) for the U. S. Naval Air Facility (NAF), Atsugi, Japan Pre-Solicitation · N4008425R0066 · Posted Feb 7, 2025
- Agency
-
- Navy Installations Command Department of the Navy, Department of Defense
- Combined task order value
- $7,112,526 Current and potential, with all options
- Last date to order 14% complete
- Shared ceiling 7% used
- $99,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Navy Installations Command awarded this Design-Bid-Build multiple-award construction IDIQ on September 19, 2025, with a shared ceiling of $99 million and ordering authority through September 18, 2033. The vehicle is unrestricted and supports facility repair, renovation, demolition, electrical, mechanical, and infrastructure work at U.S. Naval Air Facility Atsugi, U.S. Marine Corps Combined Arms Training Center Camp Fuji, and other locations in the Atsugi Area of Responsibility, Japan.
Ordering momentum is moderate. Seven task orders totaling $2 million in combined potential value have been awarded across 10 months of activity. The Navy placed all orders; three contractors have won awards. Nihon Meccs Co., Ltd. dominates with five orders valued at $1.8 million combined potential. Kanagawa Nabco Pty. LTD. holds one order for $206 thousand, and Mitomo Co., LTD. holds one order for $3 thousand. All task orders are unrestricted.
Recent work exemplifies the scope: roof repairs, frame and grease trap cover replacement, exterior wall repair and repainting, sunroom roof installation, and metal roof replacement. Task orders awarded in February and March 2026 range from $52 thousand to $916 thousand in ceiling value, with completion dates within the 2026 calendar year. Two minimum-guarantee orders of $2.7 thousand each, awarded at vehicle inception, extend to September 2029.
Obligated funds account for 97 percent of the combined potential value declared so far, indicating the contractor base is executing rather than acquiring. The vehicle retains approximately $97 million in unobligated capacity within the shared ceiling. Contractors must be duly authorized to operate in Japan and hold a valid construction license from the Ministry of Land, Infrastructure and Transport. Task-order ceilings have ranged from the contractual minimum of $2.7 thousand to approximately $916 thousand. Competition for new work remains available; the contract family structure supports approximately five firm-fixed-price IDIQ awards, and seven years of ordering authority remain.
IDV awards
| Awardee | IDV award | Awarded |
|---|---|---|
| Kanagawa Nabco Pty. LTD. | N4008425D0066 | |
| Acty Co., LTD. | N4008425D0069 | |
| Mitomo Co., LTD. | N4008425D0067 | |
| Nihon Meccs Co.,Ltd. | N4008425D0068 |
Latest task orders
Show all 15
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Nihon Meccs Co.,Ltd. | $4,042,720 | 59% |
| 2 | Acty Co., LTD. | $1,438,433 | 21% |
| 3 | Mitomo Co., LTD. | $787,103 | 11% |
| 4 | Kanagawa Nabco Pty. LTD. | $588,357 | 9% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $6,856,613 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $6,645,267 |
| FY2025 | $211,346 |
Quick answers
What is the U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033 contract vehicle?
U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Navy Installations Command (Department of the Navy), awarded on September 19, 2025.
Which companies hold U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033?
4 companies hold U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033's IDV awards, one each. The latest went to Kanagawa Nabco Pty. LTD. on September 19, 2025. The awardees whose task orders obligated the most are Nihon Meccs Co.,Ltd., Acty Co., LTD. and Mitomo Co., LTD.
How much has been spent through U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033?
15 task orders have been placed under U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033, obligating $6,856,613. Their combined current value, with exercised options, is $7,112,526.
What is the shared ceiling of U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033?
U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033's shared ceiling is $99,000,000; its task orders have used 7% of it.
Which agencies use U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033 the most?
The departments whose task orders under U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033 obligated the most are Department of the Navy ($6,856,613).
How much was obligated through U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033 in fiscal year 2025?
Task orders under U. S. Naval Air Facility Atsugi Japan Design-Bid-Build MACC 2025 - 2033 obligated $211,346 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle