Southern Border Horizontal Construction Services 2019
Ended Master IDIQ Awarded
- Federal agency
-
National Geospatial Intelligence Agency
+ 1 more agency
- Awardees
- 12
- Task orders
- 24
- Obligated
- $2,276,655,263
Vehicle facts
- Opportunity
-
- W9126G18R0096 Solicitation number
- Agencies
-
- National Geospatial Intelligence Agency Department of Defense
- ENDIST Fort Worth US Army Corps of Engineers, Department of Defense
- Combined task order value
-
- $2,276,655,263 Current, with exercised options
- $2,309,023,078 Potential, with all options
- Last date to order 100% complete
- Shared ceiling 46% used
- $5,000,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Corps of Engineers Engineering District Fort Worth established this Master IDIQ on March 4, 2019, for horizontal construction services supporting DHS Border Patrol sectors (San Diego, El Centro, Yuma, Tucson) and USACE Southwestern and South Pacific Divisions, with a shared ceiling of $5 billion and an ordering period that closed May 7, 2024. The vehicle is no longer accepting orders; the last task order was awarded September 26, 2023.
The vehicle contracted Design-Build and Design-Bid-Build construction of border barriers, walls, patrol roads, access roads, gates, lights, drainage, levee walls, and miscellaneous repairs and alterations across southwestern border and Army installation locations. Task orders reflect heavy emphasis on primary and secondary barrier wall construction (miles of linear fencing and wall segments across El Paso, Tucson, Yuma, San Diego, and Rio Grande Valley sectors) and related infrastructure, with one recent order for Fort Johnson, Louisiana road repairs.
Fisher Sand & Gravel Co dominates by potential value, holding three orders worth $1.14 billion (roughly 49% of combined potential value). Slsco, LTD. is second with five orders totaling $457.2 million, followed by Posillico Civil Inc / Coastal Environmental Group Inc (Joint Venture) with three orders worth $292.7 million. These three primes account for 96% of combined potential value; the remaining nine awardees hold substantially smaller positions. Competition shows high concentration—the top two primes alone hold approximately $1.60 billion of the $2.31 billion total.
The Department of the Army Corps of Engineers Engineering District Los Angeles placed the highest-value orders ($1.56 billion across five task orders), while Engineering District Fort Worth placed the most orders by count (16 orders, $596.4 million combined potential value). The Department of the Army placed two orders ($134.6 million), and Installation Management Command Southwest Region one order ($18 million). All 24 task orders carry no set-aside designation.
Task orders are unrestricted, firm-fixed-price contracts. Of the $2.31 billion combined potential value, $2.27 billion has been obligated (99%). Notable mega-orders include a $962.9 million Tucson primary barrier contract and an $177.2 million El Paso primary barrier project. Order velocity declined sharply: 17 orders in 2019, dropping to six in 2020 and one in 2023, reflecting completion of the vehicle's primary border construction surge.
Description
Master IDIQ for Horizontal Construction Services in support of the Department of Homeland Security (DHS) San Diego, El Centro, Yuma and Tucson Border Patrol Sectors and the US Army Corps of Engineers (USACE) Southwestern Division (SWD) and South Pacific Division (SPD). Construction services required include a wide variety of Design-Build and/or Design-Bid-Build (DBB) construction of fence, wall, patrol roads, access roads, lights, gates for access to border monuments, maintenance, and for Border Patrol operational use, drainage improvements, levee walls, and other miscellaneous improvements, repairs, and alterations.
IDV awards
Show all 12
Latest task orders
Show all 24
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Fisher Sand & Gravel Co | $1,140,089,568 | 50% |
| 2 | Slsco, LTD. | $444,500,040 | 20% |
| 3 | Posillico Civil Inc Coastal Environmental Group Inc A Joint Venture | $292,725,200 | 13% |
| 4 | Gibraltar-Caddell A Joint Venture | $238,752,896 | 10% |
| 5 | CJW Joint Venture | $85,009,944 | 4% |
| 6 | Southwest Valley Constructors Co | $66,545,176 | 3% |
| 7 | Burgos Group, LLC | $9,022,439 | <1% |
| 8 | Martin Brothers Construction | $2,000 | <1% |
| 9 | Bfbc LLC | $2,000 | <1% |
| 10 | Texas Sterling Construction CO. | $2,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $2,276,655,263 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $14,279,846 |
| FY2025 | -$669,810,734 |
| FY2024 | -$34,710,517 |
| FY2023 | -$92,617,749 |
| FY2022 | -$166,087,721 |
| FY2021 | $38,081,919 |
| FY2020 | $2,801,791,158 |
| FY2019 | $385,729,088 |
Quick answers
What is the Southern Border Horizontal Construction Services 2019 contract vehicle?
Southern Border Horizontal Construction Services 2019 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by National Geospatial Intelligence Agency (Department of Defense) and ENDIST Fort Worth (US Army Corps of Engineers), awarded on March 4, 2019.
Which companies hold Southern Border Horizontal Construction Services 2019?
12 companies hold Southern Border Horizontal Construction Services 2019's IDV awards, one each. The latest went to Martin Brothers Construction on May 8, 2019. The awardees whose task orders obligated the most are Fisher Sand & Gravel Co, Slsco, LTD. and Posillico Civil Inc Coastal Environmental Group Inc A Joint Venture.
How much has been spent through Southern Border Horizontal Construction Services 2019?
24 task orders have been placed under Southern Border Horizontal Construction Services 2019, obligating $2,276,655,263.
What is the shared ceiling of Southern Border Horizontal Construction Services 2019?
Southern Border Horizontal Construction Services 2019's shared ceiling is $5,000,000,000; its task orders have used 46% of it.
Which agencies use Southern Border Horizontal Construction Services 2019 the most?
The departments whose task orders under Southern Border Horizontal Construction Services 2019 obligated the most are Department of the Army ($2,276,655,263).
How much was obligated through Southern Border Horizontal Construction Services 2019 in fiscal year 2025?
Task orders under Southern Border Horizontal Construction Services 2019 obligated -$669,810,734 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle