Sierra Army Depot Construction MATOC

Ended Master IDIQ Awarded

Federal agency
Awardees
6
Task orders
21
Obligated
$26,345,761

Vehicle facts

Opportunity
Agency
Combined task order value
$26,345,761 Current and potential, with all options
Last date to order 100% complete
Shared ceiling 31% used
$84,712,001.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

TACOM Life Cycle Management Command awarded a Master IDIQ for construction services at Sierra Army Depot in Herlong, California on April 13, 2020; ordering closed on April 13, 2025, and is no longer active.

The vehicle was established as a total small business set-aside with a $84.712 million ceiling over a five-year ordering period. However, awarded task orders deviate significantly from the set-aside intent: 86 percent of orders (18 of 21) carry no set-aside designation, with only 14 percent designated total small business. This pattern suggests the vehicle operated as an unrestricted pool in practice despite its original structure.

Twenty-one task orders totaling $26.3 million in combined potential value have been fully obligated. Ordering activity peaked in 2022 with six orders and has since declined—2023 saw one order, 2024 produced three, and 2025 generated two final orders before the ordering deadline. Awarded work spans building renovations, roof and facade repairs, electrical and HVAC upgrades, water and fire hydrant infrastructure work, and storage facility construction. Representative orders include a $7.45 million design-build renovation of Building 363, roof repairs valued at $3.61 million, fire hydrant replacement at $2.63 million, and two building repairs each exceeding $3.8 million.

Sinew Management Group LLC and Sea Pac Engineering Inc. dominate the vehicle, holding 11 and 4 orders respectively for combined potential values of $13.8 million and $11.5 million—accounting for 96 percent of all work awarded. Four additional primes—Souza Construction, Nomlaki Technologies, and Lead Builders—captured the remaining four orders with minimal value. TACOM Life Cycle Management Command funded 95 percent of all task orders, with a single order to Contracting Command Detroit Arsenal representing the remainder.

All work is performed at Sierra Army Depot, 74 Currant Street, Herlong, California. Most orders carry firm fixed pricing and represent small to mid-sized construction projects, with typical durations of six to eighteen months. The vehicle is now closed to new ordering and is suitable only for retrospective reference or for managing final closeout of remaining active delivery orders.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Construction - building 361 repair work W912GY25F0008 Sinew Management Group LLC WRN $3,855,086
Repair and renovate building 359. W912GY25F0010 Sinew Management Group LLC WRN $3,823,139
Construction - bldg P100 electrical upgrade W912GY24F0018 Sinew Management Group LLC WRN $339,575
Construction - bldg 354 dust collection W912GY24F0015 Sea Pac Engineering Inc. WRN $1,364,000
Firehouse exterior stairs replacement construction. W912GY24F0014 Sinew Management Group LLC WRN $163,492
Replace above ground storage tanks at depot- QTY:16 each W912GY23F0010 Souza Construction, Inc. WRN $797,667
160 fire hydrants replacement. W912GY22F0044 Sea Pac Engineering Inc. WRN $2,634,761
Design-build project for building 363 renovation and repairs. W912GY21F0065 Sea Pac Engineering Inc. WRN $7,450,030
Electrical upgrade bldg. 671 W912GY22F0040 Sinew Management Group LLC WRN $420,712
Roof repair and replacement on buildings 302, 353, and 353. W912GY22F0042 Sinew Management Group LLC WRN $3,610,633
Well bollard construction W912GY22F0043 Sinew Management Group LLC WRN $248,168
Bldg. 352 lighting construction project, 110 EA light repair and replace. W912GY23F0005 Nomlaki Technologies, LLC WRN $277,861
Replace in-line water main valves W912GY22F0007 Sinew Management Group LLC WRN $819,495
Repair roof and facade of building 103 W912GY21F0060 Sinew Management Group LLC WRN $110,160
Dry storage facility at 380 W912GY21F0059 Sinew Management Group LLC WRN $412,982
Construction services - base year W912GY21F0012 Souza Construction, Inc. WRN $3,000
Construction services - base year W912GY21F0010 Sea Pac Engineering Inc. WRN $3,000
MATOC IDIQ - base ordering year W912GY21F0011 Sinew Management Group LLC WRN $3,000
Construction service - base year W912GY21F0009 Patriot Construction Inc. WRN $3,000
Construction service - base year W912GY21F0008 Nomlaki Technologies, LLC WRN $3,000
MATOC IDIQ - base ordering year W912GY21F0002 Lead Builders Inc. WRN $3,000
Show all 21

Top awardees by obligations

Rank Awardee Obligated Share
1 Sinew Management Group LLC $13,806,442 52%
2 Sea Pac Engineering Inc. $11,451,792 43%
3 Souza Construction, Inc. $800,667 3%
4 Nomlaki Technologies, LLC $280,861 1%
5 Lead Builders Inc. Minimum guarantee only $3,000 <1%
6 Patriot Construction Inc. Minimum guarantee only $3,000 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $26,345,761 100%

Obligations by fiscal year

Fiscal year Obligated
FY2025 $7,678,225
FY2024 $1,931,915
FY2023 $1,111,007
FY2022 $8,095,321
FY2021 $7,529,293

Quick answers

What is the Sierra Army Depot Construction MATOC contract vehicle?

Sierra Army Depot Construction MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by TACOM Life Cycle Management Command (Army Materiel Command), awarded on April 13, 2020.

Which companies hold Sierra Army Depot Construction MATOC?

6 companies hold Sierra Army Depot Construction MATOC's IDV awards, one each. The latest went to Nomlaki Technologies, LLC on April 13, 2020. The awardees whose task orders obligated the most are Sinew Management Group LLC, Sea Pac Engineering Inc. and Souza Construction, Inc.

How much has been spent through Sierra Army Depot Construction MATOC?

21 task orders have been placed under Sierra Army Depot Construction MATOC, obligating $26,345,761.

What is the shared ceiling of Sierra Army Depot Construction MATOC?

Sierra Army Depot Construction MATOC's shared ceiling is $84,712,001; its task orders have used 31% of it.

Which agencies use Sierra Army Depot Construction MATOC the most?

The departments whose task orders under Sierra Army Depot Construction MATOC obligated the most are Department of the Army ($26,345,761).

How much was obligated through Sierra Army Depot Construction MATOC in fiscal year 2025?

Task orders under Sierra Army Depot Construction MATOC obligated $7,678,225 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle