Sierra Army Depot Construction MATOC
Ended Master IDIQ Awarded
- Federal agency
-
TACOM Life Cycle Management Command
- Awardees
- 6
- Task orders
- 21
- Obligated
- $26,345,761
Vehicle facts
- Opportunity
-
- Sierra Army Depot Construction MATOC Solicitation · W912GY19R0003 · Posted Dec 12, 2018
- Agency
-
- TACOM Life Cycle Management Command Army Materiel Command, Department of Defense
- Combined task order value
- $26,345,761 Current and potential, with all options
- Last date to order 100% complete
- Shared ceiling 31% used
- $84,712,001.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
TACOM Life Cycle Management Command awarded a Master IDIQ for construction services at Sierra Army Depot in Herlong, California on April 13, 2020; ordering closed on April 13, 2025, and is no longer active.
The vehicle was established as a total small business set-aside with a $84.712 million ceiling over a five-year ordering period. However, awarded task orders deviate significantly from the set-aside intent: 86 percent of orders (18 of 21) carry no set-aside designation, with only 14 percent designated total small business. This pattern suggests the vehicle operated as an unrestricted pool in practice despite its original structure.
Twenty-one task orders totaling $26.3 million in combined potential value have been fully obligated. Ordering activity peaked in 2022 with six orders and has since declined—2023 saw one order, 2024 produced three, and 2025 generated two final orders before the ordering deadline. Awarded work spans building renovations, roof and facade repairs, electrical and HVAC upgrades, water and fire hydrant infrastructure work, and storage facility construction. Representative orders include a $7.45 million design-build renovation of Building 363, roof repairs valued at $3.61 million, fire hydrant replacement at $2.63 million, and two building repairs each exceeding $3.8 million.
Sinew Management Group LLC and Sea Pac Engineering Inc. dominate the vehicle, holding 11 and 4 orders respectively for combined potential values of $13.8 million and $11.5 million—accounting for 96 percent of all work awarded. Four additional primes—Souza Construction, Nomlaki Technologies, and Lead Builders—captured the remaining four orders with minimal value. TACOM Life Cycle Management Command funded 95 percent of all task orders, with a single order to Contracting Command Detroit Arsenal representing the remainder.
All work is performed at Sierra Army Depot, 74 Currant Street, Herlong, California. Most orders carry firm fixed pricing and represent small to mid-sized construction projects, with typical durations of six to eighteen months. The vehicle is now closed to new ordering and is suitable only for retrospective reference or for managing final closeout of remaining active delivery orders.
IDV awards
Latest task orders
Show all 21
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Sinew Management Group LLC | $13,806,442 | 52% |
| 2 | Sea Pac Engineering Inc. | $11,451,792 | 43% |
| 3 | Souza Construction, Inc. | $800,667 | 3% |
| 4 | Nomlaki Technologies, LLC | $280,861 | 1% |
| 5 | Lead Builders Inc. | $3,000 | <1% |
| 6 | Patriot Construction Inc. | $3,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $26,345,761 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2025 | $7,678,225 |
| FY2024 | $1,931,915 |
| FY2023 | $1,111,007 |
| FY2022 | $8,095,321 |
| FY2021 | $7,529,293 |
Quick answers
What is the Sierra Army Depot Construction MATOC contract vehicle?
Sierra Army Depot Construction MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by TACOM Life Cycle Management Command (Army Materiel Command), awarded on April 13, 2020.
Which companies hold Sierra Army Depot Construction MATOC?
6 companies hold Sierra Army Depot Construction MATOC's IDV awards, one each. The latest went to Nomlaki Technologies, LLC on April 13, 2020. The awardees whose task orders obligated the most are Sinew Management Group LLC, Sea Pac Engineering Inc. and Souza Construction, Inc.
How much has been spent through Sierra Army Depot Construction MATOC?
21 task orders have been placed under Sierra Army Depot Construction MATOC, obligating $26,345,761.
What is the shared ceiling of Sierra Army Depot Construction MATOC?
Sierra Army Depot Construction MATOC's shared ceiling is $84,712,001; its task orders have used 31% of it.
Which agencies use Sierra Army Depot Construction MATOC the most?
The departments whose task orders under Sierra Army Depot Construction MATOC obligated the most are Department of the Army ($26,345,761).
How much was obligated through Sierra Army Depot Construction MATOC in fiscal year 2025?
Task orders under Sierra Army Depot Construction MATOC obligated $7,678,225 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle