Shipboard Habitability Ship Systems Alteration Development and Installation
Ended Master IDIQ Awarded
- Federal agency
-
Naval Sea Systems Command
- Awardees
- 8
- Task orders
- 54
- Obligated
- $158,500,275
Vehicle facts
- Opportunity
-
- Shipboard Habitability Ship Systems Alteration Development / Installation Solicitation · N6449819R4018 · Posted Mar 20, 2019
- Agency
-
- Naval Sea Systems Command Department of the Navy, Department of Defense
- Combined task order value
-
- $162,393,557 Current, with exercised options
- $165,794,716 Potential, with all options
- Last date to order 100% complete
- Shared ceiling 16% used
- $986,320,480.48
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
Naval Sea Systems Command established a Master IDIQ on May 3, 2021, for engineering and technical support services in shipboard habitability systems—berthing, sanitary, food service, medical, dental, and personnel service spaces—with a shared ceiling of $986.3 million and an ordering period that closed on May 12, 2026. The vehicle is closed to new orders.
The IDIQ was set aside for Total Small Business at the vehicle level but task-order awards show a mixed utilization pattern: 26% of the 53 orders placed are designated Total Small Business, while 74% are unrestricted competitive awards. This mix reflects the Navy's approach to allocating work across both set-aside and open competition after vehicle establishment.
Delphinus Engineering dominates the award portfolio with 20 orders valued at $98.9 million in combined potential value—roughly 60% of all task-order value—followed at distance by QED Systems ($20.2 million across 8 orders) and Tecnico Corporation ($19.9 million across 9 orders). These three firms hold 95% of combined potential value. The remaining five awardees capture the tail, indicating a highly concentrated competitive landscape.
All ordering activity flows to Naval Sea Systems Command itself (51 orders, $147.7 million) and United States Pacific Fleet Forces (2 orders, $15.9 million). Ordering momentum declined sharply in the final years of the vehicle's life: 16 orders in 2022, declining to 2 in 2026 (through February). The Navy has obligated $156.5 million of the $163.6 million combined task-order potential value—96% commitment.
Task orders are priced as cost-plus-fixed-fee delivery orders ranging from under $25 thousand for narrow design surveys to $24.5 million for a food service equipment replacement on USS John C. Stennis. Typical orders supporting alteration installation team work cluster in the $3 million to $5 million range and span 12 to 24 months. Work spans worldwide locations, with operational performance on individual vessels (CVN and DDG class ships predominate in recent awards) and administrative oversight at Naval Sea Systems Command.
Description
Engineering and technical support services for Habitability systems. Work is to consist of material procurement, tooling, equipment, labor and facilities for the design, installation and repair of Habitability Spaces, Facilities, Distributive Systems, Fixtures and Equipment. Habitability Spaces and Facilities consist of living, leisure and community spaces; sanitary spaces; food service and mess area spaces; medical and dental spaces; personnel service spaces i.e., barber shop, ship store, post office, disbursing, legal, gym, religious ministry and welfare, vending machine area; laundry and dry cleaning facilities; offices; workshops, laboratories and tool issue rooms; stowage, storerooms and store issue rooms.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 54 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Delphinus Engineering LLC | $94,473,451 | 60% |
| 2 | Tecnico Corporation | $19,865,783 | 13% |
| 3 | QED Systems, Inc. | $19,566,763 | 12% |
| 4 | Integrated Marine Services, Inc. | $8,568,010 | 5% |
| 5 | Valkyrie Enterprises, LLC | $7,857,902 | 5% |
| 6 | East Coast Repair & Fabrication, LLC | $4,819,636 | 3% |
| 7 | La Playa Inc Of Virginia | $3,213,784 | 2% |
| 8 | Orbis Sibro Inc. | $134,945 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $158,500,275 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $12,091,244 |
| FY2025 | $38,335,774 |
| FY2024 | $29,094,037 |
| FY2023 | $24,851,963 |
| FY2022 | $38,779,139 |
| FY2021 | $15,348,120 |
Quick answers
What is the Shipboard Habitability Ship Systems Alteration Development and Installation contract vehicle?
Shipboard Habitability Ship Systems Alteration Development and Installation is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Sea Systems Command (Department of the Navy), awarded on May 3, 2021.
Which companies hold Shipboard Habitability Ship Systems Alteration Development and Installation?
8 companies hold Shipboard Habitability Ship Systems Alteration Development and Installation's IDV awards, one each. The latest went to Orbis Sibro Inc. on May 3, 2021. The awardees whose task orders obligated the most are Delphinus Engineering LLC, Tecnico Corporation and QED Systems, Inc.
How much has been spent through Shipboard Habitability Ship Systems Alteration Development and Installation?
54 task orders have been placed under Shipboard Habitability Ship Systems Alteration Development and Installation, obligating $158,500,275. Their combined current value, with exercised options, is $162,393,557.
What is the shared ceiling of Shipboard Habitability Ship Systems Alteration Development and Installation?
Shipboard Habitability Ship Systems Alteration Development and Installation's shared ceiling is $986,320,480; its task orders have used 16% of it.
Which agencies use Shipboard Habitability Ship Systems Alteration Development and Installation the most?
The departments whose task orders under Shipboard Habitability Ship Systems Alteration Development and Installation obligated the most are Department of the Navy ($158,500,275).
How much was obligated through Shipboard Habitability Ship Systems Alteration Development and Installation in fiscal year 2025?
Task orders under Shipboard Habitability Ship Systems Alteration Development and Installation obligated $38,335,774 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle