Shipboard Habitability Ship Systems Alteration Development and Installation
Active Master IDIQ Awarded
- Federal agency
-
Naval Sea Systems Command
- Awardees
- 8
- Task orders
- 55
- Obligated
- $158,500,275
Vehicle facts
- Opportunity
-
- Shipboard Habitability Ship Systems Alteration Development / Installation Solicitation · N6449819R4018 · Posted Mar 20, 2019
- Agency
-
- Naval Sea Systems Command Department of the Navy, Department of Defense
- Combined task order value
-
- $166,593,792 Current, with exercised options
- $169,994,951 Potential, with all options
- Last date to order 96% complete
- Shared ceiling 16% used
- $986,320,480.48
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Navy's Naval Sea Systems Command awarded the Shipboard Habitability Ship Systems Alteration Development and Installation, a multiple-award Master IDIQ for engineering, technical, and installation services on habitability spaces, facilities, distributive systems, and fixtures and equipment aboard military vessels, with ordering open through January 31, 2027. The originating solicitation, N64498-19-R-4018, was set aside for total small business, but task orders split 63% no set-aside (34 orders) and 37% total small business (20 orders). The vehicle carries a $986,320,480.48 shared ceiling, which is separate from the $165.8 million in combined task-order potential value. Of that potential value, $158.5 million (96%) is already obligated. Awarded May 3, 2021, the vehicle has roughly three months of ordering authority remaining. Fifty-four task orders have issued since May 13, 2021: 16 in 2022, 7 in 2023, 7 in 2024, 5 in 2025, and 3 in 2026, with the most recent on July 23, 2026.
Orders buy Alteration Installation Team engineering and production services to restore habitability standards in crew berthing, sanitary, and officer and chief petty officer spaces during restricted and docking availabilities. Other orders cover ship surveys and design support, CHT drain piping repair, food service and galley equipment replacement, laundry and dental reconfiguration, and deck covering on USS John C. Stennis (CVN 74) during its refueling complex overhaul. Every order shown is cost-plus-fixed-fee. The solicitation estimated 11,177,000 labor hours over five years under NAICS 541330, 541611, 541618, and 541715.
Delphinus Engineering LLC dominates with 21 orders and $101.1 million in combined potential value, more than the next three primes combined by value. QED Systems, Inc. (8 orders, $20.2 million) and Tecnico Corporation (9 orders, $19.9 million) follow, with Integrated Marine Services, Inc. (4 orders, $8.6 million) and Valkyrie Enterprises, LLC (5 orders, $7.9 million) behind them. Three smaller awardees complete the field of eight primes.
Naval Sea Systems Command places 52 of 54 orders ($149.9 million), and the Department of the Navy United States Pacific Fleet Forces places 2 orders ($15.9 million). Customer concentration is therefore effectively total.
Order values range from $0.00 placeholder orders to a $24.5 million food service equipment replacement on CVN 74 (N6449821F3114). Other large orders include $12.5 million for non-propulsion furniture on CVN 74 (N6449822F3154) and $10.6 million for SURFPAC engineering services (N6449822F3022). Ship-specific AIT orders mostly fall between $3 million and $5 million, and durations run from a few months to about three years. Work is visible at Naval Station Norfolk, Norfolk Naval Shipyard, Newport News (HII), and Pacific Fleet ship availabilities.
Description
Engineering and technical support services for Habitability systems. Work is to consist of material procurement, tooling, equipment, labor and facilities for the design, installation and repair of Habitability Spaces, Facilities, Distributive Systems, Fixtures and Equipment. Habitability Spaces and Facilities consist of living, leisure and community spaces; sanitary spaces; food service and mess area spaces; medical and dental spaces; personnel service spaces i.e., barber shop, ship store, post office, disbursing, legal, gym, religious ministry and welfare, vending machine area; laundry and dry cleaning facilities; offices; workshops, laboratories and tool issue rooms; stowage, storerooms and store issue rooms.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 55 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Delphinus Engineering LLC | $94,473,451 | 60% |
| 2 | Tecnico Corporation | $19,865,783 | 13% |
| 3 | QED Systems, Inc. | $19,566,763 | 12% |
| 4 | Integrated Marine Services, Inc. | $8,568,010 | 5% |
| 5 | Valkyrie Enterprises, LLC | $7,857,902 | 5% |
| 6 | East Coast Repair & Fabrication, LLC | $4,819,636 | 3% |
| 7 | La Playa Inc Of Virginia | $3,213,784 | 2% |
| 8 | Orbis Sibro Inc. | $134,945 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $158,500,275 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $12,091,244 |
| FY2025 | $38,335,774 |
| FY2024 | $29,094,037 |
| FY2023 | $24,851,963 |
| FY2022 | $38,779,139 |
| FY2021 | $15,348,120 |
Quick answers
What is the Shipboard Habitability Ship Systems Alteration Development and Installation contract vehicle?
Shipboard Habitability Ship Systems Alteration Development and Installation is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Sea Systems Command (Department of the Navy), awarded on May 3, 2021.
Which companies hold Shipboard Habitability Ship Systems Alteration Development and Installation?
8 companies hold Shipboard Habitability Ship Systems Alteration Development and Installation's IDV awards, one each. The latest went to Integrated Marine Services, Inc. on May 3, 2021. The awardees whose task orders obligated the most are Delphinus Engineering LLC, Tecnico Corporation and QED Systems, Inc.
How much has been spent through Shipboard Habitability Ship Systems Alteration Development and Installation?
55 task orders have been placed under Shipboard Habitability Ship Systems Alteration Development and Installation, obligating $158,500,275. Their combined current value, with exercised options, is $166,593,792.
What is the shared ceiling of Shipboard Habitability Ship Systems Alteration Development and Installation?
Shipboard Habitability Ship Systems Alteration Development and Installation's shared ceiling is $986,320,480; its task orders have used 16% of it.
Which agencies use Shipboard Habitability Ship Systems Alteration Development and Installation the most?
The departments whose task orders under Shipboard Habitability Ship Systems Alteration Development and Installation obligated the most are Department of the Navy ($158,500,275).
How much was obligated through Shipboard Habitability Ship Systems Alteration Development and Installation in fiscal year 2025?
Task orders under Shipboard Habitability Ship Systems Alteration Development and Installation obligated $38,335,774 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle