Rapid Prototyping for Tactical Systems to the Warfighter

Active Master IDIQ Awarded

Federal agency
Awardees
2
Task orders
37
Obligated
$40,124,063

Vehicle facts

Opportunity
Agency
Combined task order value
  • $56,384,651 Current, with exercised options
  • $61,217,251 Potential, with all options
Last date to order 67% complete
Shared ceiling 40% used
$99,097,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

Naval Sea Systems Command established this Master IDIQ on June 9, 2023, to procure rapid prototyping and manufacturing support for Battle Management Systems, Assault Amphibious Vehicle, manned and unmanned platform integration, robotic systems, and weapon control systems development, with ordering authority through June 8, 2028.

The vehicle remains actively ordered with approximately 1 year and 10 months of procurement authority remaining. The 33 task orders issued to date total $55.9 million in combined potential value, with $36.4 million obligated (65% of potential value). Ordering momentum has accelerated slightly from a steady 9 orders per year in 2023 and 2024 to 11 orders in 2025, though 2026 shows only 4 orders to date as of mid-April.

Hart Technologies, Inc. dominates the prime contractor base, holding 20 of 33 orders valued at $36 million combined potential value (64% of total). J.f. Taylor, Inc. holds the remaining 13 orders valued at $19.9 million (36% of total). No other primes have been awarded. Funding is concentrated among Air Force Air Mobility Command (17 orders, $28.7 million) and Naval Sea Systems Command itself (11 orders, $23.8 million), representing roughly 85% of task-order volume.

The set-aside distribution reflects a mixed competitive strategy: 21 orders (64%) carry no set-aside, while 12 orders (36%) are designated Total Small Business. Task orders employ both firm-fixed-price and cost-plus-fixed-fee pricing, with firm-fixed-price predominating among recent awards. Individual order values range from five hundred dollars to ceiling values exceeding $8 million, with most orders falling in the low single-digit millions. Notable larger ceilings include delivery order N0017823D4400-N0017825FD444 at $8.1 million and N0017823D4401-N0017825FD423 at $7.4 million. Performance duration typically ranges from 6 to 18 months. The solicitation specified requirement for facilities within 100 miles of Dahlgren, Virginia, with Secret-level clearance and ISO 9001:2015 and AS9100D certification.

IDV awards

Awardee IDV award Awarded
Hart Technologies, Inc. N0017823D4400
J.f. Taylor, Inc. N0017823D4401

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Manufacture, test, and deliver circuit card assemblies, cable and wire… N0017826FD418 J.f. Taylor, Inc. NAVSEA $211,571
Manufacture and deliver products and artifacts for design validation and… N0017826FD412 Hart Technologies, Inc. NAVSEA $1,599,190
Manufacture, test, and deliver circuit card assemblies, cable and wire… N0017826FD416 J.f. Taylor, Inc. NAVSEA $1,584,429
Do 26 from base contract N0017823D4400 N0017825FD443 Hart Technologies, Inc. NAVSEA $2,960,759
Delivery order 33 for MAC IDIQ N0017823D4400 N0017826FD414 Hart Technologies, Inc. NAVSEA $109,821
New order for N0017823D4400 N0017826FD411 Hart Technologies, Inc. NAVSEA $1,563,214
Delivery order 22 from IDIQ N0017823D4401 N0017825FD423 J.f. Taylor, Inc. NAVSEA $3,267,882
Rapid prototyping N0017825FD407 Hart Technologies, Inc. NAVSEA $995,602
New order for IDIQ MAC N0017823D4400 N0017826FD406 Hart Technologies, Inc. NAVSEA $307,472
New order for N0017823D4400 N0017826FD409 Hart Technologies, Inc. NAVSEA $638,610
New order do 29 for IDIQ N0017823D4401 N0017826FD404 J.f. Taylor, Inc. NAVSEA $168,290
Do 28 for IDIQ N0017823D4401 N0017826FD400 J.f. Taylor, Inc. NAVSEA $231,326
IDIQ delivery order 20 off of N0017823D4401. N0017825FD424 J.f. Taylor, Inc. NAVSEA $20,000
Do 25 from IDIQ N0017823D4400 N0017825FD444 Hart Technologies, Inc. NAVSEA $3,698,966
Do 27 from IDIQ N0017823D4400 N0017825FD451 Hart Technologies, Inc. NAVSEA $594,987
Rapid prototyping N0017825FD425 Hart Technologies, Inc. NAVSEA $71,911
Holding slin N0017824FD431 Hart Technologies, Inc. NAVSEA $4,762,711
Rapid prototyping hardware manufacturing N0017825FD432 J.f. Taylor, Inc. NAVSEA $521,355
Holding slin N0017824FD422 Hart Technologies, Inc. NAVSEA $60,000
RFP 21 for IDIQ N0017823D4400 N0017825FD422 Hart Technologies, Inc. NAVSEA $482,803
Delivery order 19, N0017825FD417, for base contract N0017823D4401. FFP J.f. Taylor, Inc. NAVSEA $409,022
Rapid prototyping FFP clin N0017825FD411 J.f. Taylor, Inc. NAVSEA $858,815
Cpff slin N0017824FD409 J.f. Taylor, Inc. NAVSEA $3,023,891
Cpff holding clin N0017823FD438 Hart Technologies, Inc. NAVSEA $3,664,311
FFP clin N0017824FD439 Hart Technologies, Inc. NAVSEA $314,225
Show 15 more

Latest 25 of 37 listed here. See the rest on GovTribe.

Top awardees by obligations

Rank Awardee Obligated Share
1 Hart Technologies, Inc. $25,998,303 65%
2 J.f. Taylor, Inc. $14,125,760 35%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Air Force $22,067,871 55%
2 Department of the Navy $17,860,933 45%
3 Defense Finance and Accounting Service $109,821 <1%
4 Department of the Army $85,438 <1%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $7,139,546
FY2025 $16,121,786
FY2024 $8,412,476
FY2023 $8,450,255

Quick answers

What is the Rapid Prototyping for Tactical Systems to the Warfighter contract vehicle?

Rapid Prototyping for Tactical Systems to the Warfighter is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Sea Systems Command (Department of the Navy), awarded on June 9, 2023.

Which companies hold Rapid Prototyping for Tactical Systems to the Warfighter?

2 companies hold Rapid Prototyping for Tactical Systems to the Warfighter's IDV awards, one each. The latest went to Hart Technologies, Inc. on June 9, 2023. The awardees whose task orders obligated the most are Hart Technologies, Inc. and J.f. Taylor, Inc.

How much has been spent through Rapid Prototyping for Tactical Systems to the Warfighter?

37 task orders have been placed under Rapid Prototyping for Tactical Systems to the Warfighter, obligating $40,124,063. Their combined current value, with exercised options, is $56,384,651.

What is the shared ceiling of Rapid Prototyping for Tactical Systems to the Warfighter?

Rapid Prototyping for Tactical Systems to the Warfighter's shared ceiling is $99,097,000; its task orders have used 40% of it.

Which agencies use Rapid Prototyping for Tactical Systems to the Warfighter the most?

The departments whose task orders under Rapid Prototyping for Tactical Systems to the Warfighter obligated the most are Air Force ($22,067,871), Department of the Navy ($17,860,933) and Defense Finance and Accounting Service ($109,821).

How much was obligated through Rapid Prototyping for Tactical Systems to the Warfighter in fiscal year 2025?

Task orders under Rapid Prototyping for Tactical Systems to the Warfighter obligated $16,121,786 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle