Rapid Disaster Infrastructure Response MATOC
Active Master IDIQ Awarded
- Federal agency
-
ENDIST Omaha
- Awardees
- 7
- Task orders
- 35
- Obligated
- $2,262,393,138
Vehicle facts
- Opportunity
-
- W9128F19R0043 Solicitation number
- Agency
-
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Combined task order value
-
- $2,263,050,887 Current, with exercised options
- $2,263,715,290 Potential, with all options
- Last date to order 88% complete
- Shared ceiling 25% used
- $9,000,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Corps of Engineers Engineering District Omaha awarded the Rapid Disaster Infrastructure Response MATOC, a master IDIQ with a shared ceiling of $9 billion and an ordering period extending through October 9, 2027. All task orders are unrestricted; the vehicle is fully open competition with no set-aside designations.
The MATOC funds time-sensitive construction and rehabilitation of critical infrastructure: roads, bridges, dams, levees, water and sanitation systems, power distribution, and related civil works. Orders also support USACE debris removal and unwatering activities under FEMA mission assignments. Recent task orders reflect this scope—levee reconstruction in Sacramento, embankment repair at Waco water treatment, fuel transfer pump repairs at Naval Base Guam, barracks renovation at Fort Bragg, and temporary power generation in Puerto Rico (two orders totaling $1.49 billion).
Ordering momentum remains steady. The vehicle averaged 2.8 task orders per year over the last five years, with 4 orders awarded in 2026. Combined potential value across 32 task orders is $2.25 billion, of which $2.19 billion (97%) is obligated, leaving minimal headroom against the $9 billion ceiling.
Weston Solutions Inc. dominates by dollar value, holding 7 orders worth $1.57 billion combined potential value (70% of portfolio value). Aptim Federal Services, LLC is second with 9 orders totaling $386.2 million. AECOM Technical Services, Inc., Conti Federal Services, LLC, and ECC Environmental LLC round out the top five; a small tail of additional vendors completes the seven-prime base. The top three primes by dollar value account for roughly 80% of combined potential.
Customer concentration is acute: Engineering District Omaha places 23 of 32 orders valued at $1.85 billion (82% of portfolio). Engineering District Sacramento, the broader Department of the Army Corps of Engineers, Engineering District Albuquerque, and the Department of the Army place the remaining 9 orders. Orders use cost-plus-fixed-fee and firm-fixed-price structures. Task-order ceilings typically range from $250 thousand to $18.4 million for standard infrastructure work, with exceptional orders for Puerto Rico temporary power exceeding $800 million each.
With 14 months of ordering authority remaining and 97% of potential value already obligated, pursuit viability depends on capturing work within the narrow margin—approximately $55 million in remaining ceiling authority across the portfolio.
Description
The intent of the RDI Disaster Support Response is to provide time-sensitive construction/rehabilitation support. Projects may include, but are not limited to, roads (primary, secondary and short-term temporary fixes), bridges, irrigation systems, coastal and marine resource management and development, dams and other water related structures, electric distribution systems, water and sanitation systems schools, clinics or hospitals, emergency power and other civil engineering works. In addition, under USACE responsibilities to FEMA, the RDI MATOC may be used to provide USACE Mission Support through the local MSCs or District Commander to address debris removal and/or unwatering activities, provided the requested services are within the scope of the contract. Infrastructure Construction Support. The RDI MATOCs may support various time critical infrastructure construction repair/rehabilitation projects with the most prevalent being rehabilitation of levee systems. However, infrastructure construction support may include work on other essential infrastructure facilities, such as: roads, bridges, dams, utility systems (power, water, sewer, telephone, telecommunications) railways, subways, airports, and harbors, which are publicly owned, regulated or maintained by the government. This includes work on buildings, structures or other real property, when necessary to support a larger infrastructure mission assignment.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 35 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Weston Solutions Inc. | $1,569,167,538 | 69% |
| 2 | Aptim Federal Services, LLC | $394,417,551 | 17% |
| 3 | AECOM Technical Services, Inc. | $130,917,558 | 6% |
| 4 | Conti Federal Services, LLC | $77,758,172 | 3% |
| 5 | ECC Environmental LLC | $68,610,759 | 3% |
| 6 | Cape-Forgen JV | $21,519,060 | 1% |
| 7 | Cdm-Alberici JV | $2,500 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $2,262,393,138 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $111,800,851 |
| FY2025 | $11,951,064 |
| FY2024 | $373,634,624 |
| FY2023 | $1,097,606,499 |
| FY2022 | $253,694,039 |
| FY2021 | $216,499,755 |
| FY2020 | $197,206,258 |
Quick answers
What is the Rapid Disaster Infrastructure Response MATOC contract vehicle?
Rapid Disaster Infrastructure Response MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ENDIST Omaha (US Army Corps of Engineers), awarded on October 10, 2019.
Which companies hold Rapid Disaster Infrastructure Response MATOC?
7 companies hold Rapid Disaster Infrastructure Response MATOC's IDV awards, one each. The latest went to Cape-Forgen JV on October 10, 2019. The awardees whose task orders obligated the most are Weston Solutions Inc., Aptim Federal Services, LLC and AECOM Technical Services, Inc.
How much has been spent through Rapid Disaster Infrastructure Response MATOC?
35 task orders have been placed under Rapid Disaster Infrastructure Response MATOC, obligating $2,262,393,138. Their combined current value, with exercised options, is $2,263,050,887.
What is the shared ceiling of Rapid Disaster Infrastructure Response MATOC?
Rapid Disaster Infrastructure Response MATOC's shared ceiling is $9,000,000,000; its task orders have used 25% of it.
Which agencies use Rapid Disaster Infrastructure Response MATOC the most?
The departments whose task orders under Rapid Disaster Infrastructure Response MATOC obligated the most are Department of the Army ($2,262,393,138).
How much was obligated through Rapid Disaster Infrastructure Response MATOC in fiscal year 2025?
Task orders under Rapid Disaster Infrastructure Response MATOC obligated $11,951,064 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle