NAWS China Lake CA Construction 2013-2016
Ended Master IDIQ Awarded
- Federal agency
-
Naval Air Warfare Center
- Awardees
- 5
- Task orders
- 42
- Obligated
- $36,365,605
Vehicle facts
- Opportunity
-
- N6247311R2402 Solicitation number
- Agency
-
- Naval Air Warfare Center Naval Air Systems Command, Department of Defense
- Combined task order value
- $36,365,605 Current and potential, with all options
- Last date to order 100% complete
- Shared ceiling
- $35,000,000.00 Less than its task orders have obligated
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Naval Air Warfare Center established this Master IDIQ on February 7, 2013 to provide design, construction, supervision, materials, labor, and all means necessary to deliver complete facilities at Naval Air Weapons Station China Lake, Naval Air Station Lemoore, and Bridgeport, California. Ordering closed on February 29, 2016; the vehicle is no longer active. The shared ceiling was $35 million against a combined task-order potential value of $36.4 million, with all value obligated.
Over the vehicle's three-year ordering window, the Naval Air Warfare Center issued 42 task orders across five prime contractors. Awards accelerated in 2014 with 23 orders, then slowed to 9 in 2015 before the vehicle closed. The largest recipients were Coppertop Ledcor JV (15 orders, $12.2 million combined potential value) and KEE Souza A Joint Venture (14 orders, $11.1 million), which together held roughly 61 percent of awarded value. A&D-Dorado Joint Venture LLP captured 8 orders worth $10.5 million. Three firms thus commanded approximately 87 percent of combined potential value, with Richard Brady & Associates and a minor joint venture dividing the remainder.
The Naval Air Warfare Center (NAWC) funded approximately 77 percent of orders ($28 million), with the remainder split between Naval Facilities Engineering Command (11 orders, $6.7 million) and Navy Installations Command (1 order, $1.7 million).
Competitive 8(a) designations dominated the portfolio, comprising 64 percent of orders. Unrestricted orders accounted for 33 percent, and a single Total Small Business set-aside represented 2 percent. Task orders ranged from $5 thousand to $3.4 million, with typical values between $300 thousand and $2.1 million. Scope included building repairs and renovations (HVAC, roofing, interior finishes), facility alterations, design-build projects, infrastructure upgrades, and equipment installations across multiple China Lake area buildings and the two subordinate naval air stations.
Description
Master IDIQ for providing design, construction, supervision, equipment, materials, labor, and all means necessary to provide complete and usable facilities at various locations within Naval Air Weapons Station (NAWS) China Lake area of responsibility, including Naval Air Station (NAS) Lemoore and Bridgeport, California.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 42 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Coppertop Ledcor JV | $12,151,408 | 33% |
| 2 | KEE Souza A Joint Venture | $11,130,091 | 31% |
| 3 | A&D-Dorado Joint Venture LLP | $10,500,569 | 29% |
| 4 | Richard Brady & Associates, Inc. | $2,578,537 | 7% |
| 5 | Penick Nordic JV II | $5,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $36,365,605 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2025 | $344,944 |
| FY2024 | $300,000 |
| FY2022 | -$1,063,794 |
| FY2017 | $838,067 |
| FY2016 | $2,008,490 |
| FY2015 | $10,001,271 |
| FY2014 | $17,341,287 |
| FY2013 | $6,595,340 |
Quick answers
What is the NAWS China Lake CA Construction 2013-2016 contract vehicle?
NAWS China Lake CA Construction 2013-2016 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Air Warfare Center (Naval Air Systems Command), awarded on February 7, 2013.
Which companies hold NAWS China Lake CA Construction 2013-2016?
5 companies hold NAWS China Lake CA Construction 2013-2016's IDV awards, one each. The latest went to Richard Brady & Associates, Inc. on March 1, 2013. The awardees whose task orders obligated the most are Coppertop Ledcor JV, KEE Souza A Joint Venture and A&D-Dorado Joint Venture LLP.
How much has been spent through NAWS China Lake CA Construction 2013-2016?
42 task orders have been placed under NAWS China Lake CA Construction 2013-2016, obligating $36,365,605.
What is the shared ceiling of NAWS China Lake CA Construction 2013-2016?
The shared ceiling listed for NAWS China Lake CA Construction 2013-2016, $35,000,000, is less than its task orders have obligated.
Which agencies use NAWS China Lake CA Construction 2013-2016 the most?
The departments whose task orders under NAWS China Lake CA Construction 2013-2016 obligated the most are Department of the Navy ($36,365,605).
How much was obligated through NAWS China Lake CA Construction 2013-2016 in fiscal year 2025?
Task orders under NAWS China Lake CA Construction 2013-2016 obligated $344,944 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle