NAVFAC SW Environmental Remediation PERMAC II 2011-2016 (PERMAC II)
Ended Master IDIQ Awarded
- Federal agency
-
Naval Facilities Engineering Command
- Awardees
- 6
- Task orders
- 40
- Obligated
- $85,751,874
Vehicle facts
- Opportunity
-
- N6247309R2623 Solicitation number
- Agency
-
- Naval Facilities Engineering Command Department of the Navy, Department of Defense
- Combined task order value
- $85,751,874 Current and potential, with all options
- Last date to order 100% complete
- Shared ceiling 17% used
- $500,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
Naval Facilities Engineering Command (NAVFAC) Southwest established this Master IDIQ for environmental remediation services on Navy and Marine Corps installations across the NAVFAC Southwest area of responsibility on March 23, 2011, with a shared ceiling of $500 million and an ordering deadline of March 22, 2016 — the vehicle is now closed to new orders and all potential value has been obligated.
The vehicle funded CERCLA and RCRA remedial investigations, design work including sampling and analysis plans, health and safety plans, decision documents, and remedial actions. Task orders covered remedial design, removal actions, expedited and emergency response, pilot and treatability studies, systems operation and maintenance, and related activities to return contaminated sites to safe levels. Representative awards included $11.7 million for remedial work, $8.2 million for loading, transportation, and removal, and $8 million for timecrisis remedial action at a San Francisco naval station.
Forty task orders were awarded between March 2011 and March 2016, with activity concentrated in 2015 when 13 orders issued. The portfolio generated $85.8 million in combined potential value, with all dollars obligated. Navy NAVFAC issued 36 of the 40 orders totaling $85.1 million; Marine Corps, Naval Air Systems Command, and the Pacific Fleet accounted for the remainder. All awards were unrestricted (no set-aside designations).
Competition concentrated among six primes. Arcadis U.S., Inc. held the largest share with 9 orders valued at $24.8 million combined potential, followed by Parsons Government Services Inc. with 8 orders worth $18.6 million. CE2 Kleinfelder JV, Battelle Memorial Institute, and Aecom-Envirocon JV each held 6 orders, with remaining activity scattered among smaller contractors. The top five primes captured roughly 90 percent of combined potential value. Task orders used firm fixed pricing across most awards, with ultimate completion dates extending into 2021 for long-tail work.
Description
The Naval Facilities Engineering Command (NAVFAC), Southwest, San Diego, California, has awarded a Master IDIQ for Environmental Remediation Services on Navy and Marine Corp Installations and other DoD installations at various locations in NAVFAC SW area of responsibility. The services under this vehicle include but are not limited to: Design work such as CERCLA and RCRA remedial investigations, surveys, preparation of work documents and reports in support of Navy environmental programs to include but is not limited to work plans, sampling and analysis plans, health and safety plans, decision documents, community relations documents, conceptual design, consultations, and value engineering. Remediation services include but are not limited to: remedial actions; removal actions; remedial design; expedited and emergency response actions; pilot and treatability studies; remedial actions, systems operation and maintenance; and other related activities associated with returning sites to safe and acceptable levels of contamination, to achieve appropriate decontamination and decommissioning requirements.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 40 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Arcadis U.s., Inc. | $24,827,326 | 29% |
| 2 | Parsons Government Services Inc. | $18,606,238 | 22% |
| 3 | CE2 Kleinfelder JV | $14,656,792 | 17% |
| 4 | Battelle Memorial Institute | $11,062,928 | 13% |
| 5 | Gilbane Federal | $8,395,419 | 10% |
| 6 | Aecom-Envirocon JV | $8,203,172 | 10% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $85,751,874 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2024 | $64,468 |
| FY2023 | $136,650 |
| FY2022 | -$5,022,290 |
| FY2021 | -$1,729,441 |
| FY2020 | $766,224 |
| FY2019 | $1,147,951 |
| FY2018 | $1,741,403 |
| FY2017 | $9,328,776 |
| FY2016 | $5,828,473 |
| FY2015 | $37,785,000 |
| FY2014 | $11,190,769 |
| FY2013 | $10,589,259 |
| FY2012 | $12,548,524 |
| FY2011 | $1,376,108 |
Show all 14
Quick answers
What is the PERMAC II contract vehicle?
NAVFAC SW Environmental Remediation PERMAC II 2011-2016 (PERMAC II) is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Facilities Engineering Command (Department of the Navy), awarded on March 23, 2011.
Which companies hold PERMAC II?
6 companies hold PERMAC II's IDV awards, one each. The latest went to CE2 Kleinfelder JV on March 23, 2011. The awardees whose task orders obligated the most are Arcadis U.s., Inc., Parsons Government Services Inc. and CE2 Kleinfelder JV.
How much has been spent through PERMAC II?
40 task orders have been placed under PERMAC II, obligating $85,751,874.
What is the shared ceiling of PERMAC II?
PERMAC II's shared ceiling is $500,000,000; its task orders have used 17% of it.
Which agencies use PERMAC II the most?
The departments whose task orders under PERMAC II obligated the most are Department of the Navy ($85,751,874).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle