National A-E Design Services 2018-2023
Ended Master IDIQ Awarded
- Federal agency
-
Headquarters
- Awardees
- 17 across 20 IDV awards
- Task orders
- 216
- Obligated
- $110,260,810
Vehicle facts
- Opportunity
-
- AGSPECS170033 Solicitation number
- Agency
-
- Headquarters National Resources Conservation Service, Department of Agriculture
- Combined task order value
-
- $115,659,083 Current, with exercised options
- $118,440,367 Potential, with all options
- Last date to order 100% complete
- Shared ceiling
- $10,000,000.00 Less than its task orders have obligated
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The USDA Natural Resources Conservation Service (NRCS) established a Master IDIQ for Architect-Engineer and construction management services on April 16, 2018, with a shared ceiling of $10 million and a last date to order of April 14, 2023—the vehicle is no longer accepting new task orders. The IDIQ funded 216 task orders across four regional subdivisions (Region 1, 2, 3, and 4) through April 18, 2023, when the final order was placed, with combined potential value of $118.3 million and $109.1 million obligated (92% burn rate).
Task orders funded design surveys, environmental assessments and studies, geotechnical engineering, hydrologic modeling, dam assessments and rehabilitation planning, watershed plans, preliminary investigation feasibility reports, and construction management services for NRCS conservation projects nationwide. Recent orders illustrate the portfolio: a $6.9 million supplemental watershed plan and environmental document for Isabela Irrigation Channels in Puerto Rico, a $1.8 million supplemental watershed rehabilitation plan for the Little Schuylkill River system in Pennsylvania, and multiple single-task PIFRs ranging from $39,500 to $550,000.
Aterra-Schnabel Joint Venture leads the vehicle with 31 orders totaling $22.7 million in potential value, followed by Athena Engineering & Environmental, LLC ($14.4 million across 16 orders) and DDK Engineering–Joint Venture ($11.6 million across 17 orders). The top five primes capture 57 percent of combined potential value; 17 distinct primes shared remaining work. The Northeast Region generated the highest volume and value, with 57 orders worth $45.3 million, followed by the Central Region (52 orders, $24 million) and Southeast Region (35 orders, $25.1 million). Across the portfolio, 86 percent of orders carried no set-aside designation, with 14 percent reserved for small business (predominantly sole-source 8(a) awards). Orders typically ranged from $49,970 (standard PIFR baseline) to $1.8 million, with most task-order durations extending 12 to 36 months. Ordering momentum declined in the vehicle's final years—2022 saw 53 orders, but only 29 were placed in 2023 before the April cutoff.
Description
The USDA-NRCS, National Services Specialized Services Team, has awarded a Master IDIQ for Architect-Engineer (A-E) and construction management services for various engineering functions in a variety of fields including design services, geotechnical engineering, hydrologic modeling, design surveys, environmental assessments and studies, dam assessments and planning, conservation planning, design reviews, architectural and structural designs, technical document development and construction management services for a wide range of projects within the NRCS.
IDV awards
Show all 20
Latest task orders
Show 15 more
Latest 25 of 216 listed here. See the rest on GovTribe.
Pools and SINs
| Pool or SIN | IDV awards | Ceiling | Obligated |
|---|---|---|---|
| Region 1 | 6 | $10,000,000 | $39,181,250 |
| Region 4 | 6 | $10,000,000 | $16,876,749 |
| Region 2 | 4 | $10,000,000 | $29,189,299 |
| Region 3 | 4 | $10,000,000 | $25,013,512 |
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Aterra-Schnabel Joint Venture | $16,655,192 | 15% |
| 2 | Athena Engineering & Environmental, LLC | $12,954,698 | 12% |
| 3 | DDK Engineering - Joint Venture | $11,049,955 | 10% |
| 4 | AD Astra Collaborative LLC | $10,121,164 | 9% |
| 5 | RJH Consultants, Inc. | $8,796,999 | 8% |
| 6 | Pare Corp | $8,431,385 | 8% |
| 7 | M & E Consultants, LLC | $7,963,356 | 7% |
| 8 | Jones & Demille Engineering, Inc. | $7,148,958 | 6% |
| 9 | North Wind Resource Partnership JV, LLC | $6,929,514 | 6% |
| 10 | Conservation Works JV LLC | $6,764,010 | 6% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of Agriculture | $110,260,810 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | -$1,112,945 |
| FY2025 | $5,159,408 |
| FY2024 | $596,886 |
| FY2023 | $21,414,644 |
| FY2022 | $24,044,930 |
| FY2021 | $12,930,092 |
| FY2020 | $27,237,481 |
| FY2019 | $15,749,562 |
| FY2018 | $9,612,367 |
Quick answers
What is the National A-E Design Services 2018-2023 contract vehicle?
National A-E Design Services 2018-2023 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Headquarters (National Resources Conservation Service), awarded on April 16, 2018.
Which companies hold National A-E Design Services 2018-2023?
17 companies hold National A-E Design Services 2018-2023's 20 IDV awards. The latest went to Aterra-Schnabel Joint Venture on May 1, 2018. The awardees whose task orders obligated the most are Aterra-Schnabel Joint Venture, Athena Engineering & Environmental, LLC and DDK Engineering - Joint Venture.
How much has been spent through National A-E Design Services 2018-2023?
216 task orders have been placed under National A-E Design Services 2018-2023, obligating $110,260,810. Their combined current value, with exercised options, is $115,659,083.
What is the shared ceiling of National A-E Design Services 2018-2023?
The shared ceiling listed for National A-E Design Services 2018-2023, $10,000,000, is less than its task orders have obligated.
Which agencies use National A-E Design Services 2018-2023 the most?
The departments whose task orders under National A-E Design Services 2018-2023 obligated the most are Department of Agriculture ($110,260,810).
How much was obligated through National A-E Design Services 2018-2023 in fiscal year 2025?
Task orders under National A-E Design Services 2018-2023 obligated $5,159,408 in fiscal year 2025.
What pools does National A-E Design Services 2018-2023 have?
National A-E Design Services 2018-2023 has 4 pools, lots and SINs, including Region 1, Region 4, Region 2 and Region 3.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle