Global Contingency Construction Contract

Active Master IDIQ Awarded

Federal agency
Awardees
6 across 10 IDV awards
Task orders
15
Obligated
$11,941,186

Vehicle facts

Agency
Combined task order value
  • $11,941,186 Current, with exercised options
  • $18,477,594 Potential, with all options
Last date to order 47% complete
Shared ceiling <1% used
$5,000,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Naval Facilities Engineering Command awarded the Global Contingency Construction Contract, a multiple-award IDIQ with a combined $5 billion potential value and ordering authority through September 18, 2032, on July 15, 2021. This vehicle remains substantially underutilized: only 12 task orders have been placed since award, with combined potential value of $18.3 million (0.37% of the $5 billion ceiling) and $11.7 million obligated to date.

The vehicle funds construction services, predominantly for overseas facilities and contingency operations, with ancillary Base Operating Support services including air operations, port operations, utilities, environmental support, and billeting. Task orders may also include domestic work for disaster recovery. NAICS codes span commercial and institutional building construction (236220), highway and bridge construction (237310), and other heavy and civil engineering construction (237990). The Navy explicitly intended to award approximately four contracts competitively, each with a $25,000 minimum guarantee.

Ordering momentum is modest. The vehicle saw 6 task orders in 2021 (initial awards including minimum guarantees), 4 in 2024, and 2 in 2025, with the most recent order on September 23, 2025. Six prime contractors hold awards; Perini Management Services, Inc. dominates with 3 orders valued at $18.2 million combined potential, representing 99% of total vehicle value. CDM A Joint Venture, Gilbane Federal, and Jacobs Project Management CO. each hold 2 orders; Aptim Federal Services, LLC holds 1. All 12 task orders serve a single customer: Naval Facilities Engineering Command. No set-aside designations apply; all orders are unrestricted.

Task-order values cluster at the minimum guarantee ($25,000) and in one outlier: a September 2025 firm-fixed-price modified design-build order to Perini for Mulberry Cove Marina repair at Naval Air Station Jacksonville, Florida, with $11.6 million obligated against an $18.1 million ceiling and completion expected September 24, 2027. A September 2025 tabletop exercise order was issued for $25,033. The early 2021 awards included six minimum-guarantee Cost Plus Award Fee orders that were subsequently deobligated due to protests and corrective action, all to zero value.

Description

Work will be predominately construction. The awardees, on a limited basis and incidental to construction services, may be required to provide Base Operating Support (BOS) Services such as: Air Operations; Port Operations; Morale, Welfare and Recreation Support; Galley; Billeting; Facilities Support; Utilities; Base Support Vehicles and Equipment; and Environmental services. These services are primarily anticipated in support of facilities overseas, but may also be ordered for work in the United States in support of disaster recovery efforts and other contingency operations. Applicable labor requirements and clauses will be incorporated by individual task order, as necessary, for work performed in the United States

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Pre-construction services for multiple civil works projects N6247026F0086 Gilbane Federal NAVFAC $118,610
Pre-construction services for multiple civil works projects N6247026F0088 Perini Management Services, Inc. NAVFAC $42,791
Pre-construction services for multiple civil works projects N6247026F0087 Jacobs Project Management CO. NAVFAC $42,496
Firm-fixed-price (FFP) modified/hybrid design build (DB) task order for the… N6945025F1387 Perini Management Services, Inc. NAVFAC $11,612,256
Tabletop (TTX) exercise with gccmac contractors to test the contractor and… N6247025F0085 CDM A Joint Venture NAVFAC $25,033
Minimum guarantee N6247024F4179 Perini Management Services, Inc. NAVFAC $25,000
Minimum guarantee N6247024F4180 Jacobs Project Management CO. NAVFAC $25,000
Minimum guarantee N6247024F4176 CDM A Joint Venture NAVFAC $25,000
Minimum guarantee N6247024F4178 Gilbane Federal NAVFAC $25,000
Minimum guarantee. N6247021F4089 Jacobs Project Management CO. NAVFAC $0
Minimum guarantee N6247021F4088 Perini Management Services, Inc. NAVFAC $0
Minimum guarantee. N6247021F4085 Gilbane Federal NAVFAC $0
This is the minimum guarantee task order. N6247021F4084 CDM A Joint Venture NAVFAC $0
Minimum gurantee. N6247021F4087 Aptim Federal Services, LLC NAVFAC $0
Minimum guarantee N6247021F4086 ECC Contingency Constructors LLC NAVFAC $0
Show all 15

Top awardees by obligations

Rank Awardee Obligated Share
1 Perini Management Services, Inc. $11,680,047 98%
2 Gilbane Federal $143,610 1%
3 Jacobs Project Management CO. $67,496 1%
4 CDM A Joint Venture $50,033 <1%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Navy $11,737,289 98%
2 Washington Headquarters Service $203,897 2%

Obligations by fiscal year

Fiscal year Obligated
FY2026 $203,897
FY2025 $11,637,289
FY2024 $100,000
FY2023 -$150,000
FY2021 $150,000

Quick answers

What is the Global Contingency Construction Contract contract vehicle?

Global Contingency Construction Contract is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Facilities Engineering Command (Department of the Navy), awarded on July 15, 2021.

Which companies hold Global Contingency Construction Contract?

6 companies hold Global Contingency Construction Contract's 10 IDV awards. The latest went to Jacobs Project Management CO. on September 19, 2024. The awardees whose task orders obligated the most are Perini Management Services, Inc., Gilbane Federal and Jacobs Project Management CO.

How much has been spent through Global Contingency Construction Contract?

15 task orders have been placed under Global Contingency Construction Contract, obligating $11,941,186.

What is the shared ceiling of Global Contingency Construction Contract?

Global Contingency Construction Contract's shared ceiling is $5,000,000,000; its task orders have used <1% of it.

Which agencies use Global Contingency Construction Contract the most?

The departments whose task orders under Global Contingency Construction Contract obligated the most are Department of the Navy ($11,737,289) and Washington Headquarters Service ($203,897).

How much was obligated through Global Contingency Construction Contract in fiscal year 2025?

Task orders under Global Contingency Construction Contract obligated $11,637,289 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle