General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point
Active Master IDIQ Awarded
- Federal agency
-
Naval Facilities Engineering Command
- Awardees
- 7
- Task orders
- 15
- Obligated
- $40,106,902
Vehicle facts
- Opportunity
-
- IDIQ for General Construction for NAVFAC Mid-Atlantic's Marine Corp Installation East AOR Pre-Solicitation · N4008524R2785 · Posted Jul 22, 2024
- Agency
-
- Naval Facilities Engineering Command Department of the Navy, Department of Defense
- Combined task order value
-
- $41,031,822 Current, with exercised options
- $42,018,819 Potential, with all options
- Last date to order 21% complete
- Shared ceiling 8% used
- $495,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
Naval Facilities Engineering Command (NAVFAC) established this Master IDIQ for general construction at Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point, North Carolina on September 29, 2025, with a shared ceiling of $495 million and ordering authority through September 28, 2030. The vehicle is restricted to small business primes and carries a 5-year term (one base year plus four one-year options).
Scope encompasses Design-Build and Design-Bid-Build construction, new construction, demolition, repair, alteration, and renovation of buildings, systems, and infrastructure at the two North Carolina installations. Eligible work includes civil, structural, mechanical, electrical, fire protection, and communications systems across administrative, industrial, maintenance, warehouse, hangar, communications, personnel support, recreation, lodging, dormitory, medical, and roadway facilities. Lead or asbestos abatement and work in explosive facilities may be required. Task orders range from $5 thousand (minimum guarantee awards) to $20.6 million.
Nine task orders totaling $21 million in combined potential value have been awarded since vehicle inception, with seven orders placed in the initial award window (September 2025) and two additional orders in January 2026. All $21 million in combined potential value has been obligated. Military & Federal Construction Co., Inc. holds the largest share at $20.6 million across two orders; Quadrant Construction Inc. holds the second position at $319 thousand across two orders. The remaining five primes (Blue Rock Structures, Inc.; P & S Construction Inc.; Syncon LLC; Joyce and Associates Construction Inc.; and Bristol General Contractors, LLC) each hold $5 thousand minimum guarantee awards. Approximately 78 percent of orders carry no set-aside designation; 22 percent are total small business awards. The United States Marine Corps funds approximately $21 million (roughly 99 percent) of task-order activity; NAVFAC Mid-Atlantic funds the remainder.
With $21 million obligated against a $495 million shared ceiling, significant remaining capacity exists. The vehicle retains over four years of ordering authority.
IDV awards
Latest task orders
Show all 15
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Military & Federal Construction Co., Inc. | $20,641,926 | 51% |
| 2 | Joyce & Associates Construction, Inc. | $9,062,592 | 23% |
| 3 | Blue Rock Structures, Inc. | $8,567,429 | 21% |
| 4 | Quadrant Construction Inc. | $1,501,255 | 4% |
| 5 | P & S Construction Inc. | $323,700 | 1% |
| 6 | Syncon LLC | $5,000 | <1% |
| 7 | Bristol General Contractors, LLC | $5,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $31,544,473 | 79% |
| 2 | Defense Logistics Agency | $8,562,429 | 21% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $40,071,902 |
| FY2025 | $35,000 |
Quick answers
What is the General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point contract vehicle?
General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Facilities Engineering Command (Department of the Navy), awarded on September 29, 2025.
Which companies hold General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point?
7 companies hold General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point's IDV awards, one each. The latest went to Syncon LLC on September 29, 2025. The awardees whose task orders obligated the most are Military & Federal Construction Co., Inc., Joyce & Associates Construction, Inc. and Blue Rock Structures, Inc.
How much has been spent through General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point?
15 task orders have been placed under General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point, obligating $40,106,902. Their combined current value, with exercised options, is $41,031,822.
What is the shared ceiling of General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point?
General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point's shared ceiling is $495,000,000; its task orders have used 8% of it.
Which agencies use General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point the most?
The departments whose task orders under General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point obligated the most are Department of the Navy ($31,544,473) and Defense Logistics Agency ($8,562,429).
How much was obligated through General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in fiscal year 2025?
Task orders under General Construction Projects Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point obligated $35,000 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle