DOT Highway and Bridge Design and Engineering 2012-2017

Ended Master IDIQ Awarded

Federal agency
Awardees
4
Task orders
24
Obligated
$7,821,567

Vehicle facts

Opportunity
  • DTFH7111R00005 Solicitation number
Agency
Combined task order value
$7,962,203 Current and potential, with all options
Last date to order 100% complete
Shared ceiling 52% used
$15,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The Federal Highway Administration Eastern Federal Lands Highway Division awarded this Master IDIQ on June 13, 2012, for highway and bridge design and engineering services for Federal Land Management agencies in the northern region of the eastern United States (Maine through Missouri). Ordering closed on March 3, 2018, and the vehicle is no longer active.

The IDIQ has expired and is not available for new task orders. The last award under the vehicle occurred on March 2, 2018. Of the $15 million combined ceiling, task orders obligated $7.8 million (98% of the $8 million combined potential value across 24 awards). Task-order activity peaked in 2014 with 7 orders, then settled to 4 per year in 2015–2017 before tapering to 2 awards in the final ordering year.

Work contracted included environmental assessments, design and permitting for highway and bridge projects, stormwater management plans, subsurface utility engineering, geotechnical surveys, and related planning and architectural support. Representative task orders ranged from $7.5 thousand for a single topographic survey to $2.2 million for plans, specifications, and estimates for a Wisconsin forest service project. All 24 task orders were awarded unrestricted and competitively.

Four firms captured all awards: Johnson, Mirmiran & Thompson, Inc. (11 orders, $2.2 million combined potential value); Stantec Consulting Services Inc. (6 orders, $2.5 million); WSP USA Inc. (3 orders, $2.5 million); and AECOM Technical Services, Inc. (4 orders, $755 thousand). The top three firms held roughly equal shares of combined potential value, with work distributed across all four competitors rather than concentrated in one or two firms. All orders funded the Federal Highway Administration. Place of performance centered on federal lands in the Northeast and Mid-Atlantic regions, including national parks, national forests, and wildlife refuges in states including Wisconsin, Virginia, West Virginia, and Maryland, with projects also in Washington, D.C., and the U.S. Virgin Islands.

Description

The Federal Highway Administration (FHWA), Eastern Federal Lands Highway Division (EFLHD) has awarded a Master IDIQ for highway and/or bridge design and engineering services and for other engineering, planning, and architectural services for construction projects predominately associated with Federal Land Management agencies (National Park Service, U.S. Forest Service, Fish and Wildlife Service, etc.) within the Northern Region of the eastern United States. The Northern Region includes: Maine, Vermont, New Hampshire, Massachusetts, Connecticut, Rhode Island, New York, New Jersey, Delaware, Pennsylvania, Maryland, Virginia, West Virginia, The District of Columbia, Ohio, Indiana, Michigan, Kentucky, Wisconsin, Iowa, Minnesota, Illinois, and Missouri.

IDV awards

Latest task orders

Task order Awardee Awarding agency Obligated Last action
The purpose of this no cost administrative modification is to financially and… 693C7318F000024 WSP USA Inc. FHWA $259,518
693C7318F000018 WSP USA Inc. FHWA $2,218,480
Task order for an a/e firm to do the street light design for rocr 10(5)… DTFH7112D00012T14005 Johnson, Mirmiran & Thompson, Inc. FHWA $225,982
Project: WI erfo FS 2016-(6) environmental assessment and design for repair… 693C7318F000008 Stantec Consulting Services Inc. FHWA $1,155,751
Task order for an a/e firm to do street signal design for suit 1(2), 2(2) 5009 Johnson, Mirmiran & Thompson, Inc. FHWA $182,381
This contract is for all engineering services necessary for the preparation… 5003 AECOM Technical Services, Inc. FHWA $377,926
Design of kennedy center pedestrian/bicycle trail access & safety improvement &… 5003 Stantec Consulting Services Inc. FHWA $803,798
Project number is WI erfo FS 2016-1(2) statement of need: lack of in house… 693C7318F000007 Stantec Consulting Services Inc. FHWA $464,905
Project: NP nace 17(2), 18(2), stormwater management (SWM) plans and report… 5004 AECOM Technical Services, Inc. FHWA $260,070
Engineering services to implement and monitor the beach drive transportation… 5008 Johnson, Mirmiran & Thompson, Inc. FHWA $317,666
Project FW_cava 102(1), 905(1), 913(1) canaan valley national wildlife refuge… 5002 AECOM Technical Services, Inc. FHWA $38,930
Project: FW-chin 10(2) preliminary/concept stormwater management plan, accomack… 5004 Stantec Consulting Services Inc. FHWA $55,349
PR for georgetown university / canal road entrance project DE - 0014(801) for… 5010 Johnson, Mirmiran & Thompson, Inc. FHWA $66,371
Gwmp 11(4) EA arlington memorial bridge. Engineering services necessary to… DTFH7112D00012T14002 Johnson, Mirmiran & Thompson, Inc. FHWA $205,582
Task order for the geotechnical design for the slide repairs on baltimore… DTFH7112D00012T14003 Johnson, Mirmiran & Thompson, Inc. FHWA $322,053
VA flap npnws 105(1) subsurface exploration compete using JMT, stantec, PB, and… 5011 Johnson, Mirmiran & Thompson, Inc. FHWA $138,552
Perform 4TH and last topographic (hydrographic) survey of the newly installed… 5002 Stantec Consulting Services Inc. FHWA $7,473
Task order for an a/e firm to do geotechnical underwater drilling for arlington… 5007 Johnson, Mirmiran & Thompson, Inc. FHWA $341,436
The project site is located at fort belvoir along the newly constructed… 5006 Johnson, Mirmiran & Thompson, Inc. FHWA $51,976
Project: PRA-gwmp 500(1),george washington memorial parkway perform… DTFH7112D00011T14001 Stantec Consulting Services Inc. FHWA $24,715
Cato 900(1) - storm water management plan and erosion and sediment control plan. 5001 AECOM Technical Services, Inc. FHWA $77,857
Project: VI 38(2)_C1C2C3 the project site is located along weymouth rhymer… DTFH7112D00012T14004 Johnson, Mirmiran & Thompson, Inc. FHWA $113,663
Project: raphune hill improvements, ST. Thomas, usvi noise study prepare… DTFH7112D00010T13001 WSP USA Inc. FHWA $43,938
Value analysis (VE#2)foot 8E21, F9 DTFH7112D00012T13001 Johnson, Mirmiran & Thompson, Inc. FHWA $67,197
Show all 24

Top awardees by obligations

Rank Awardee Obligated Share
1 WSP USA Inc. $2,521,936 32%
2 Stantec Consulting Services Inc. $2,511,990 32%
3 Johnson, Mirmiran & Thompson, Inc. $2,032,857 26%
4 AECOM Technical Services, Inc. $754,783 10%

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of Transportation $7,821,567 100%

Obligations by fiscal year

Fiscal year Obligated
FY2023 -$12,429
FY2021 -$366,904
FY2020 -$21,841
FY2019 -$389,597
FY2018 $4,247,051
FY2017 $1,048,413
FY2016 $1,313,528
FY2015 $693,688
FY2014 $1,198,522
FY2013 $111,135

Quick answers

What is the DOT Highway and Bridge Design and Engineering 2012-2017 contract vehicle?

DOT Highway and Bridge Design and Engineering 2012-2017 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Federal Highway Administration (Department of Transportation), awarded on June 13, 2012.

Which companies hold DOT Highway and Bridge Design and Engineering 2012-2017?

4 companies hold DOT Highway and Bridge Design and Engineering 2012-2017's IDV awards, one each. The latest went to AECOM Technical Services, Inc. on September 4, 2012. The awardees whose task orders obligated the most are WSP USA Inc., Stantec Consulting Services Inc. and Johnson, Mirmiran & Thompson, Inc.

How much has been spent through DOT Highway and Bridge Design and Engineering 2012-2017?

24 task orders have been placed under DOT Highway and Bridge Design and Engineering 2012-2017, obligating $7,821,567. Their combined current value, with exercised options, is $7,962,203.

What is the shared ceiling of DOT Highway and Bridge Design and Engineering 2012-2017?

DOT Highway and Bridge Design and Engineering 2012-2017's shared ceiling is $15,000,000; its task orders have used 52% of it.

Which agencies use DOT Highway and Bridge Design and Engineering 2012-2017 the most?

The departments whose task orders under DOT Highway and Bridge Design and Engineering 2012-2017 obligated the most are Department of Transportation ($7,821,567).

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle