<p>The Department of Transportation Federal Highway Administration awarded a firm-fixed-price purchase order contract to Wagman Heavy Civil Inc., a for-profit Subchapter S Corporation, for the GWUMP 11(4), 11(7) ARLINGTON MEMORIAL BRIDGE project. The $150,000.00 contract does not have a set-aside designation and is to be completed by April 2, 2018. This contract appears to be part of the larger GWMP (George Washington Memorial Parkway) program managed by the Federal Highway Administration.</p>
This Federal Highway Administration (FHWA) contract DTFH7115C00031, awarded to Cianbro Corporation for $4,731,632.50, consists of repairs to the Arlington Memorial Bridge in Washington, D.C. The project includes structural concrete, steel, and timber repairs, expansion joint work, debris removal, and roadway work such as sidewalk repairs and asphalt overlay. Key subcontractors include A Annandale, Inc. for pavement markings, Curve Construction LLC and Fort Myer Construction Corp for concrete and...
The Federal Highway Administration (FHWA) awarded a firm-fixed-price delivery order contract to Clark Nexsen Inc., a for-profit architectural and engineering firm, to perform an in-depth inspection and load rating calculation for the Arlington Memorial Bridge in Sterling, Virginia. The $338,331.68 contract is for architect-engineer services related to bridge inspections and reports. This order was not set aside for any small business categories. Clark Nexsen holds several Indefinite Delivery...
This is a firm fixed-price delivery order awarded by the Department of Transportation Federal Highway Administration to Clark Nexsen Inc., a full-service architectural and engineering design firm. The $385,741.57 task order is for Clark Nexsen to provide engineering services to conduct in-depth and routine inspections of the Arlington Memorial Bridge, and prepare associated drawings, reports, and load rating. This work is part of the agency's broader bridge inspection and infrastructure...
This is a firm fixed-price delivery order awarded by the Department of Transportation Federal Highway Administration to Clark Nexsen Inc., a for-profit architectural and engineering design firm. The $156,192.30 contract is for engineering services to perform routine safety inspections of 39 bridges and culverts along the George Washington Memorial Parkway, as well as an interim detailed inspection of the Arlington Memorial Bridge (Structure No. 3300-016P). This contract is not associated with...
This is a $3,883,917.62 firm fixed-price contract awarded by the Federal Highway Administration (FHWA), a civilian agency, to Fort Myer Construction Corp. for the rehabilitation and resurfacing of approximately 1.6 miles of the George Washington Memorial Parkway in Arlington, Virginia. The work includes milling, full-depth pavement reconstruction, asphalt concrete overlay, guardrail replacement, and other miscellaneous tasks. The contract does not have a set-aside designation. As a prime...
The Department of Transportation Federal Highway Administration awarded a firm fixed-price definitive contract to Martins Construction Corp., a for-profit Subchapter S Corporation, for the rehabilitation of the Windy Run Bridge on the George Washington Memorial Parkway in Arlington, VA. The $3,076,737.69 project includes partial-depth removal and repair of the concrete bridge deck, placing a latex-modified concrete overlay, cleaning and painting steel bridge members, asphalt pavement work, and...
This federal contract award, valued at $625,995.62, was issued by the National Park Service (NPS) to the architectural and engineering firm Gwwo, Inc. The contract is for design and technical services to rehabilitate the Arlington House mansion as part of the Gravelly Point Meadows Project (GWMP 216010). This is a firm fixed-price delivery order with no set-aside designation. Gwwo, Inc. is an experienced government contractor, holding multiple Indefinite Delivery/Indefinite Quantity (IDIQ)...
This federal contract award, DTFH7112D00013|5018, was issued by the Federal Highway Administration (FHWA), a civilian agency, to Clark Nexsen Inc., a for-profit architectural and engineering design firm. The $499,460.30 firm-fixed-price contract is for architect-engineer services to clean and inspect the bascule span of a bridge structure on the George Washington Memorial Parkway. The work is categorized under the Major Program Code for "BRIDGE INSPECTIONS, INSPECTIONS, INSPECTIONS...
This is a definitive, firm fixed-price contract awarded by the Federal Highway Administration, a civilian agency, to Kiewit Infrastructure Co. to permanently rehabilitate the concrete approach spans and replace the bascule span on the Arlington Memorial Bridge. The total ceiling value of the contract is $201,451,160.83, and the ultimate completion date is June 21, 2024. The contract is not set aside for any specific business type. Kiewit Infrastructure Co. is a child company of Kiewit-Turner A...
GWMP 11(4) EA ARLINGTON MEMORIAL BRIDGE. ENGINEERING SERVICES NECESSARY TO PROVIDE A CONSTRUCTABILITY REVIEW OF THE CONCEPTUAL DESIGN PLANS SUPPORTING THE ENVIRONMENTAL ASSESSMENT (EA) DECISION MAKING PROCESS FOR THE PRESERVATION AND REHABILITATION OF THE ARLINGTON MEMORIAL BRIDGE LOCATED IN WASHINGTON, D.C.