Design Build MACC Japan AOR 2022 - 2027
Active Master IDIQ Awarded
- Federal agency
-
Navy Installations Command
- Awardees
- 6
- Task orders
- 60
- Obligated
- $142,156,400
Vehicle facts
- Opportunity
-
- Design-build/design-bid-build multiple award construction contract (MACC) for u. S. Naval air facility (NAF), atsugi, japan Pre-Solicitation · N4008421R0069 · Posted Apr 9, 2021
- Agency
-
- Navy Installations Command Department of the Navy, Department of Defense
- Combined task order value
-
- $142,484,588 Current, with exercised options
- $142,501,742 Potential, with all options
- Last date to order 86% complete
- Shared ceiling 57% used
- $250,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Navy Installations Command established this Design-Build/Design-Bid-Build IDIQ for construction and facility maintenance at U.S. Naval Air Facility Atsugi, Japan, with a shared ceiling of $250 million and ordering authority through June 29, 2027—approximately eleven months remaining. The vehicle was awarded June 30, 2022, to multiple contractors on an unrestricted basis with no set-aside designation.
Roughly 100% of the vehicle's $136.9 million combined task-order potential value has been obligated across 58 awarded orders. Ordering momentum peaked in 2024 (19 orders) and has moderated in 2025–2026 (16 and 4 orders respectively through early April 2026), suggesting the vehicle is entering its closeout phase. Task orders span renovation, demolition, mechanical systems, electrical work, roofing, pavement repair, hazardous material abatement, and site infrastructure—work distributed across NAF Atsugi and subordinate facilities including Camp Fuji and Combined Arms Training Center.
Competition is highly concentrated. Nihon Meccs Co., Ltd. dominates with 40 orders valued at $81.2 million (59% of combined potential value), followed by Mirait.one–Acty JV at $39.8 million across 4 orders, Nippo Corporation at $6.4 million across 7 orders, and American Engineering Corporation at $5.1 million. This tight concentration reflects the vehicle's geographic specificity and Japan-licensed contractor requirement. Customer concentration is also narrow: Department of the Navy Installations Command placed 41 orders worth $99 million (72% of potential value); United States Marine Corps placed 7 orders worth $27.3 million.
Task orders are priced firm-fixed and typically range from several hundred thousand dollars to mid-single-digit millions, with several multi-million-dollar outliers. The largest single order is N4008422D0072-N4008422F4517, a seed project awarded at $33.8 million with completion extended to August 2026. Individual task-order durations vary widely, with completion dates spanning from 2024 through early 2028. All work is performed at NAF Atsugi, Camp Fuji, or Combined Arms Training Center in Japan.
Description
Design-Build/Design-Bid-Build (DB/DBB) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Various Projects in the Atsugi Area of Responsibility (AOR), Japan
IDV awards
Latest task orders
Show 15 more
Latest 25 of 60 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Nihon Meccs Co.,Ltd. | $86,212,085 | 61% |
| 2 | Mirait.one- Acty JV | $39,753,101 | 28% |
| 3 | Nippo Corporation | $6,411,474 | 5% |
| 4 | American Engineering Corporation | $5,126,492 | 4% |
| 5 | Kashiwabara Corporation | $4,625,066 | 3% |
| 6 | Gilbane Japan GK | $28,181 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $138,892,110 | 98% |
| 2 | DOD Education Activity | $1,783,453 | 1% |
| 3 | Department of the Army | $1,480,837 | 1% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $23,132,194 |
| FY2025 | $17,686,431 |
| FY2024 | $40,124,744 |
| FY2023 | $27,864,417 |
| FY2022 | $33,676,803 |
Quick answers
What is the Design Build MACC Japan AOR 2022 - 2027 contract vehicle?
Design Build MACC Japan AOR 2022 - 2027 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Navy Installations Command (Department of the Navy), awarded on June 30, 2022.
Which companies hold Design Build MACC Japan AOR 2022 - 2027?
6 companies hold Design Build MACC Japan AOR 2022 - 2027's IDV awards, one each. The latest went to Gilbane Japan GK on June 30, 2022. The awardees whose task orders obligated the most are Nihon Meccs Co.,Ltd., Mirait.one- Acty JV and Nippo Corporation.
How much has been spent through Design Build MACC Japan AOR 2022 - 2027?
60 task orders have been placed under Design Build MACC Japan AOR 2022 - 2027, obligating $142,156,400. Their combined current value, with exercised options, is $142,484,588.
What is the shared ceiling of Design Build MACC Japan AOR 2022 - 2027?
Design Build MACC Japan AOR 2022 - 2027's shared ceiling is $250,000,000; its task orders have used 57% of it.
Which agencies use Design Build MACC Japan AOR 2022 - 2027 the most?
The departments whose task orders under Design Build MACC Japan AOR 2022 - 2027 obligated the most are Department of the Navy ($138,892,110), DOD Education Activity ($1,783,453) and Department of the Army ($1,480,837).
How much was obligated through Design Build MACC Japan AOR 2022 - 2027 in fiscal year 2025?
Task orders under Design Build MACC Japan AOR 2022 - 2027 obligated $17,686,431 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle