Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan
Active Master IDIQ Awarded
- Federal agency
-
Marine Corps
- Awardees
- 10
- Task orders
- 91
- Obligated
- $264,530,116
Vehicle facts
- Opportunity
-
- IDIQ DB/DBB MACC for Various U. S. Government Installations at Okinawa Prefecture, Japan (Big MACC) Pre-Solicitation · N4008420R0073 · Posted Jun 25, 2020
- Agency
-
- Marine Corps Department of the Navy, Department of Defense
- Combined task order value
- $265,344,478 Current and potential, with all options
- Last date to order 70% complete
- Shared ceiling
- $245,000,000.00 Less than its task orders have obligated
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The United States Marine Corps established a Master IDIQ on April 1, 2021, for design-build and design-bid-build construction at U.S. Government installations throughout Okinawa Prefecture, Japan, with authority to place orders through March 31, 2029—approximately 2 years 8 months of ordering authority remaining. The vehicle carries no set-aside designation and operates under a $245 million shared ceiling across multiple prime contractors. All 79 task orders awarded to date are unrestricted competitive procurements.
Combined task-order potential value has reached $237.3 million, with 100 percent of the combined potential value obligated as of the most recent award on January 23, 2026. Ordering momentum has declined; the vehicle issued 20 task orders in 2023, 15 in 2024, and 11 in 2025, with only 2 orders placed in 2026 to date. This downward trend reflects the vehicle's maturity and near-exhaustion of its ceiling authority.
Task-order scope spans new construction, renovation, modernization, and routine repair across multiple facility types: building demolition, HVAC replacement and repair, electrical and mechanical systems, roofing, fencing, site work, asbestos and lead-based paint abatement, and erosion control. Recent awards include repair of barracks buildings (valued $27.2 million and $15.8 million), fire suppression system construction ($5.3 million), facility renovations ($3.9 million and $3.7 million), and smaller maintenance tasks ($172,000 to $934,000). Task orders typically carry firm fixed pricing and durations ranging from months to over two years.
American Engineering Corporation dominates the prime roster, holding 30 orders worth $76.1 million combined potential value—representing approximately 32 percent of total vehicle value. Onaka Gumi Co., Ltd., Kyunan Co., LTD., and Nippo Corporation together hold approximately 35 percent of combined potential value, with a longer tail of smaller primes including Sumiju Yokosuka Kogyo Co., LTD. and Toda-Nudp JV. Ten distinct prime contractors have been awarded.
The United States Marine Corps funds roughly 74 percent of task orders (48 orders, $176 million potential value), with the Department of the Navy Installations Command placing 26 orders worth $51.9 million. The remaining orders fund Department of the Navy Naval Facilities Engineering Command and Department of Defense Education Activity. Work is performed at multiple discrete installations: Camp Foster, MCAS Futenma, Camp Hansen, Camp Kinser, Camp Courtney, Camp Schwab, Camp Shields, White Beach, Kadena Air Base, Camp Gonsalves, and smaller sites. Geographic concentration is high and narrow—all work is located in Okinawa Prefecture, Japan. Contractors must be licensed to operate in Japan and comply with all Japanese laws and regulations; task orders are solicited and paid in Japanese yen with prices expressed in U.S. dollars for administrative convenience.
Description
Design and construction of new construction, renovation/modernization, and routine repair/maintenance projects at various U.S. Government installations at Okinawa Prefecture, Japan. The scope of work will be specified in each task order and may include, but is not limited to, office renovation, building demolition, built-in equipment repair/replacement, piping repair/replacement, pipe lagging, electrical work, mechanical work, road pavement, fencing, roofing, painting, site work, removal and disposal of lead based paint and asbestos containing material, welding, and masonry in the Okinawa operational area.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 91 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | American Engineering Corporation | $90,559,023 | 34% |
| 2 | Kyunan Co., LTD. | $41,162,327 | 16% |
| 3 | Nippo Corporation | $34,075,388 | 13% |
| 4 | Onaka Gumi Co.,Ltd. | $30,844,576 | 12% |
| 5 | Toda-Nudp JV | $28,050,631 | 11% |
| 6 | Sumiju Yokosuka Kogyo Co., LTD. | $27,833,843 | 11% |
| 7 | TOA Corporation | $9,626,136 | 4% |
| 8 | Fuji Construction Co.,Ltd. | $2,359,659 | 1% |
| 9 | Nishimatsu Construction Co.,Ltd. | $9,267 | <1% |
| 10 | Gilbane Japan GK | $9,267 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $263,945,443 | 100% |
| 2 | DOD Education Activity | $584,673 | <1% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $32,946,842 |
| FY2025 | $54,309,442 |
| FY2024 | $39,359,310 |
| FY2023 | $63,245,382 |
| FY2022 | $57,574,192 |
| FY2021 | $15,372,612 |
Quick answers
What is the Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan contract vehicle?
Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Marine Corps (Department of the Navy), awarded on April 1, 2021.
Which companies hold Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan?
10 companies hold Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan's IDV awards, one each. The latest went to American Engineering Corporation on April 1, 2021. The awardees whose task orders obligated the most are American Engineering Corporation, Kyunan Co., LTD. and Nippo Corporation.
How much has been spent through Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan?
91 task orders have been placed under Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan, obligating $264,530,116. Their combined current value, with exercised options, is $265,344,478.
What is the shared ceiling of Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan?
The shared ceiling listed for Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan, $245,000,000, is less than its task orders have obligated.
Which agencies use Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan the most?
The departments whose task orders under Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan obligated the most are Department of the Navy ($263,945,443) and DOD Education Activity ($584,673).
How much was obligated through Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan in fiscal year 2025?
Task orders under Design Build MACC for Various U. S. Government Installations at Okinawa Prefecture Japan obligated $54,309,442 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle